Loading...
R-99-06-24-10F5 - 6/24/1999RESOLUTION NO. R- 99- 06- 24 -10F5 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Bay Maintenance Company, Inc. for the Rubio Subdivision Street and Drainage Channel Improvements project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with Bay Maintenance Company, Inc. for the Rubio Subdivision Street and Drainage Channel Improvements project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 24th day of Ju ib iAl Al ' /A.J1 E LAND, City Secretary K:\ WPUOCS \RESOLUTI \R9OS24PS.WRO /scg Ai' Tr A � ROT A. STLUKA, 01 ., Mayor City of Round Rock, Texas Op/14/99 13:42 ''218 5563 PUBLIC WORKS SHEETS 10002 /004 HEJL, LEE & ASSOCIATES; INC.. DANIEL P. HEIL, /R. P.E. R.R.L.S., AICP • CHIENY LEE P:E,AICP ENGINEERING SURVEYING PLANNING 601 FARLEY.DRIVE AUSTIN; TEXAS 78753 PHONE 512- 836 -1848 FAX 512- 836.6499 MEMORANDUM TO: Mr. Al Willie, P.E., RPLS Public Works Department, City of Round Rock FROM: Chien Lee, P.E., AICP c,„ DATE` June 11, 1999 PROJECT: Rubio Subdivision Improvement RE: HLA Project No. 13571 SUBJECT: Contractor's Change Order No. 1 Pursuant to the city's request for the following listed additional improvements for the referenced project, please find attached Change Order No. 1 in the amount of 519,525.48 to the contract: 1. Extend Baker Street southward approxinlately 77 feet and Rubio Avenue eastward approximately 21 feet with additional pavement and turnaround area, install concrete ribbon curb, install 6 -inch water line and service line accordingly to, serve the adjacent properties with a total increase in the amount of 59,498.00. 2. Provide labor for the installation of 20 new water meter boxes and water meters (to be provided by the city) with a total increase in the amount of 5829.78. 3. Remove installed 8', wide concrete valley gutter and replace with 17' concrete valley gutter for better drainage flow and vehicular driving condition with an increase in the amount of 51,990.70: 4. Install a grate inlet and approximately 325 feet of 12" PVC storm sewer near the southwest intersection of Rubio Avenue and Baker Street to convey storm 'runoff'to the proposed Rubio channel with an increase in the amount of $6,807.00. 5. Add one. additional 6 -inch gate valve for the proposed water distribution system with an increase in the amount of 5400.00. The updated contract amount is presented- below: Original Contract Amount This Change Order (No. 1) Revised Contract Amount 5 615,396,25 19.525.48 $ 634.921.73 06/14/99 13:43 6'218 5563 PUBLIC WORKS SHEETS Ij003/004 Should this proposed change order meet with your approval, please execute the attached form and return to our office for coordination with the contractor. We look forward, to the continuing progress of this project. If you have any questions about this project, please do not hesitate to contact our office. Attachment: Change Order (No. 1) Form Letter dated 5 -7 -99 from. Bay Maintenance Company Letter dated 5-14-99 from Bay Maintenance Company Fax copy dated 6 -1 -99 from Bay Maintenance Company. Fax 'copy dated 5 -26 -95 from Bay Maintenance Company CC: Bay Maintenance Company (Letter Only) cho¢gglA war NO. DESCRIPTION UNIT UNIT PRICE ORIGINAL CONTRACT CHANGE ORDER 61 REVISED CONTRACT QTY AMOUNT QTY AMOUNT QTY AMOUNT 1 R.O.W. PREPARATION STA. 5 500.00 13 S 6,30000 0.98 S 49000 14 S 6,99000 2 STREET EXCAVATION SY 10.00 3,180 31,800.00 261 2,610.00 3,441 34,410.00 3 SUBGRADE PREPARATION SY 1.00 3,180 3,180.00 261 26100 3,941 3,441.00 4 15" CRUSHED LIMESTONE BASE SY 12.00 450 5,400.00 450 5,400.00 5 12" CRUSHED LIMESTONE BASE SY 8.00 3,180 25,44000 261 2,088.00 3,941 27,528,00 6 2 "116/AC PAVEMENT SY 5.00 3,096 15,480,00 261 1,305.00 3,357 16,785.00 7 18" CONCRETE RIBBON CURB LF 6.00 2 17,220,00 196 1,176.00 3,066 18,396.00 8 ASPHALT OVERLAY TON 70,00 350 24,500.00 350 24,500.00 9 MORTARED ROCK RIP RAP SY 70.00 35 2,430,00 35 2,450.00 10 6' WIDE CONCRETE VALLEY GUTTER LF 2,450.00 70 2 450.00 = I = I I METAL BEAM GUARD RAIL LF STA 90.00 1,000.00 3,400.00 2] 21,000.00 85 3,400.00 CHANNEL CLEARING & PREPARATION 21 21,000.00 CHANNEL EXCAVATION CY 6.00 30,000 180,000.00 30,000 180,000.00 n •. CHANNEL EMBANKMENT CY 3.00 6,0001 18,000.00 6,000 18,000.00 6'x4' BOX CULVERT NASH ST. LS 40,000.00 1 40,000.00 1 40,000.00 CONCRETE PAVEMENT @ CULVERT INCLUDING SUBGRADE PREP 5.Y. 30.00 95 2,850.00 95 2,850.00 17 CONCRETE RIP RAP @ 5135 FRONTAGE ROAD S.Y. 34.00 417 14,178.00 417 14,178.00 I8 10' WIDE VALLEY GUTTER @ NASH ST. LF 50.00 50 2,500.00 50 2,500.00 19 CONCRETE TRICKLE CHANNEL LF 30.00 2,120 63,600.00 2,120 63,600.00 20 STABILIZED CONSTRUCTION ENTRANCE LS 1,200.00 1 1,200.00 1 1 1,200.00 15,000.00 21 DEMOLITION & REMOVAL OF EXISTING HOUSE LS 15,000.00 1 15,000.00 22 10' ACCESS ROAD ALONG CHANNEL 14.1 10.00 2,110 21,200.00 2,120 21,200.00 23 CHANNEL RE- VEGETATION 0.25 26,000 6,500.00 26,000 6,500.00 24 10" PVC SDR -35 WASTEWATER LINE (ALL DEPTHS) 49.00 225 9,000.00 225 9,000.00 25 10 " PVC SDR -l8 WASTEWATER LINE (ALL DEPTHS) LF 45.00 325 14,625.00 325 14,625.00 26 6 " PVC SDR -lO WASTEWATERLINES(ALL DEPTHS) LF 40.00 118 4,720.00 118 4,720.00 27 8" PVC C -900 (CL 200) WATER LINE LF 20.00 125 2,50000 125 2,509.00 28 6" PVC C -900 (CL 200) WATER LINE LF I 16.00 1,040 16,640.00 98 1,568.00 1,138 18,208.00 29 2" PVC C -900 (CL 200) WATER LINE LF 0 I 00 120 I 1,200.00 120 1,200,00 30 CONCRETE CAP LF 7.00 1,346 9,422.00 1,346 9,422.00 31 DROP MANHOLE EA 2,500.00 1 2,500.00 1 2,500.00 32 FIRE HYDRANT ASSEMBLY EA 1,500.00 3 4,500.00 3 4,500.00 33 SERVICE RE- CONNECT EA 300.00 20 6,000,00 20 6,000.00 34 6" GATE VALVE EA 400.00 3 1,200.00 1 400.00 4 1,600,00 35 CONNECT PROP. 6" WL TO EXIST. 8" WL LS 1,500,00 1 1,500.00 1 1,500.00 36 CONNECT PROP. 6" WL TO EXIST. 2" WL LS 500.00 1 50000 1 500.00 37 CONNECT PROP. 6" WL TO EXIST. 1" WL L.S. 300.00 1 ' 300.00 I 1 300.00 38 SILT FENCE L.F 2.00 255 310.00 255 510.00 39 TREE PROTECTION L.F. 1.00 320 320.00 320 320.00 40 ROCK BERM L.F ROD 150 1,200.00 150 1,200.00 dl TRAFFIC CONTROLS & DETOUR L.S 10,000,00 1 10,000.00 1 10,00000 42 CLEANUP & RESTORATION L.S. 3,000.00 1 3,900.00 1 3,000.00 43 GRATE INLET WI STORM SEWER (4) MAYS & NASH L.S. 1,500,00 1 1,500.00 1 1,500,00 44 REVEGETATION WITHIN ROADWAY S.Y. 0,25 1,645 411.25 1,645 411.25 50 LABOR "CO INSTALL NEW WATER METER AND BOXES EA 41,49 20 829.78 20 829.78 51 RE- INSTALL CONCRETE CONC. VALLEY GUTTER LS 1,990,70 1 1,990.70 1 1,990.70 52 !INSTALL GRATE INLET & 12" DRAIN PIPE LS 6,807.00 1 6,807.00 1 6,807.00 TOTAL COST S 615,396.29 S 19,52548 S 634,921.73 0,6/14/99 13:44 $218 5563 CHANGEI,XLS CITY OF ROUND ROCK RUBIO SUBDIVISION IMPROVEMENT CHANGE ORDER #1 HLA PROJECT NO. 13571 Recommended By: C04/44‘63..."' ° Approved By: City or Round Rock PUBLIC WORKS SHEETS, 4 004/004 Dare. I r 94 Dale: i• q Date: DATE: June 21, 1999 SUBJECT: City Council Meeting — June 24, 1999 ITEM: 10.F.5. Consider a resolution authorizing the Mayor to execute Contract Change Order No. 1 to Bay Maintenance Company, Inc. for the Rubio Street, Drainage, Water, Utility Relocation and Channel Improvement Project. This change order will extend Baker Street approximately 78 feet and Rubio approximately 21 feet and provide a turn around area at their ends. New water service meter boxes will be installed and a storm drain will be constructed on Baker Street to remedy a street and lot drainage condition. This change order in the increased amount of 519.525.48 will make the current contract amount $634,921.73. The funding source is the 1996 General Obligation Bond Program. Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director. NO DESCRIPTION UNIT UNIT PRICE ORIGINAL CONTRACT CHANGE ORDER f I REVISED CONTRACT QTY AMOUNT QTY AMOUNT QTY AMOUNT 1 R.O.W. PREPARATION STA. S 500.00 13 _ 1 6,500.00 0.98 $ 490.00 14 1 6,990.00 2 STREET EXCAVATION SY 10.00 3,180 31,800.00 261 2,610.00 _ 3.441 34,410.00 3 SUBGRADE PREPARATION SY 1.00 3,180 3,180.00 261 261.00 i 3 3,441.00 4 15" CRUSHED LIMESTONE BASE SY 12.00 450 5,400.00 450 5,400.00 5 12" CRUSHED LIMESTONE BASE SY 8.00 25,440.00 261 2,088.00 3,441 27,528.00 6 2' HMAC PAVEMENT SY 5.00 3,096 15,48000. 261 1,305.00 3,357 16,785.00 7 18" CONCRETE RIBBON CURB LF 6.00 2,870 17,220.00 196 1,176.00 3,066 18 ,396.00 8 ASPHALT OVERLAY TON 70.00 350 24,500.00 ® 35 24,500.00 2,450.00 9 _ MORTARED ROCK RIP RAP SY 70.00 35 2,450.00 10 6' WIDE CONCRETE VALLEY GUTTER LF 35.00 70 2,450.00 70 2,450.00 11 METAL BEAM GUARD RAIL LF 40.00 85 3,400.00 3 12 CHANNEL CLEARING & PREPARATION STA. 1,000.00 21 21,000.00 21 21 13 CHANNEL EXCAVATION CY 6.00 30,000 180,000.00 30,000 180,000.00 14 CHANNEL EMBANKMENT CY 3.00 6,000 18,000.00 6,000 18 15 6'c4' BOX CULVERT (o), NASH ST. LS 40,000.00 1 40,000.00 1 40 16 CONCRETE PAVEMENT @ CULVERT INCLUDING SUBGRADE PREP S.Y. 3000 95 2,850.00 95 2,850.00 17 CONCRETE RIP RAP (#)1H35 FRONTAGE ROAD S.Y. LF LF 34.00 50.00 30.00 417 50 2120 14,178.00 2,500.00 63,600.00 417 50 2,120 14,178.00 2,500.00 63,600.00 18 10' WIDE VALLEY GUTTER @ NASH ST. 19 CONCRETE TRICKLE CHANNEL 20 STABILIZED CONSTRUCTIONENPAANCE LS 1,200.00 1 1,200.00 1 1 21 DEMOLITION & REMOVAL OF EXISTING HOUSE ® 15 10.00 1 _ _ 2,120 15,000.00 21,200.00 1 15,000.00 22 10' ACCESS ROAD ALONG CHANNEL 2 21,200.00 23 'CHANNEL RE-VEGETATION 0.25 _ 26,000 6,500.00 26 6,500.00 24 10" PVC SDR- 35 WASTEWATER LINE (ALL DEPTHS) Fi LF LF _ 40.00 45.00 225 325 9,000.00 14,625.00 225 325 9,000.00 14,625.00 25 10" PVC SDR -18 WASTEWATER LINE (ALL DEPTHS) 26 6 " PVC SDR- 18WASTEWATERLINES(ALL DEPTHS) 40.00 20.00 118 4 118 4,720.00 27 8" PVC C -900 (CL 200) WATER LINE 125 2,500.00 125 2,500.00 28 6" PVC C -900 (CL 200) WATER LINE LF 16.00 1 16,640.00 98 1,56800 1,138 ' 18,208.00 29 _ 2" PVC C -900 (CL 200) WATER LINE 10.00 120 1,200.00 120 1,200.00 30 'CONCRETE CAP 7.00 1,346 9,42200 9 31 DROP MANHOLE 2,500.00 1 2,500.00 1 2,500.00 32 FIRE HYDRANT ASSEMBLY . 1,500.00 3 4,500.00 3 4,500.00 33 SERVICE RE- CONNECT EA 300.00 20 6,000.00 20 6,000.00 34 6" GATE VALVE EA 400.00 3 1,200.00 1 400.00. 4 1,600.00 35 CONNECT PROP. 6" WL TO EXIST. 8" WL LS 1,500.00 1 1,500.00', 1 1,500.00 36 CONNECT PROP. 6" WL TO EXIST. 2" WL LS 500.00 1 500.00 _ 1 500.00 37 CONNECT PROP. 6" WL TO EXIST. 1" WL LS. 300.00 1 . 300.00 _ 1 300.00 38 SILT FENCE L.F. 2.00 255 510.00 255 510.00 39 TREE PROTECTION L.F. 1.00 320 320.00 320 320.00 40 ROCK BERM L.F. 8.00 150 1,200.00 150 1,200.00 41 TRAFFIC CONTROLS & DETOUR L.S. 10,000.00 1 10,00000 1 10,000.00 42 CLEANUP & RESTORATION ® ® ® 3,000.00 1,500.00 0.25 _ 1 1 1,645 3,000.00 1,500.00 411.25 1 1 1 3,000.00 1,50000 411.25 43 GRATE INLET W/ STORM SEWER @ MAYS & NASH 44 REVEGETATION WITHIN ROADWAY 50 LABOR TO INSTALL NEW WATER METER AND BOXES EA 41.49 20 829.78 20 51 RE- INSTALL CONCRETE CONC. VALLEY GU IT'ER LS 1,990.70 1,990.70 U 1 52 INSTALL GRATE INLET & 12" DRAIN PIPE LS 6,807.00 1 6,807.00 1 6,807.00 TOTAL COST S 615,396.25 $ 19 ,525.48 $ 634,921.73 CHANGEI.XLS CITY OF ROUND ROCK RUBIO SUBDIVISION IMPROVEMENT CHANGE ORDER #1 HLA PROJECT NO. 13571 Recommended By: .f�gb Accepted By Approved H jl, 1: Associates, Inc. W .! Ci d Rock Updated: 6 - I0 - 99 Date: 4- - 99 Date: D.e 6 -9 -5 9 HEJL, LEE & ASSOCIATES, INC. DANIEL P. HEJL, JR. P.E.. R,PJ..S, AICP CHIEN Y. LEE RE, AICP ENGINEERING SURVEYING PLANNING 601 FARLEY DRIVE AUSTIN. TEXAS 78753 PHONE 512- 836 -1848 FAX 512 -836 -6499 TO: Mr. Al Willie, P.E., RPLS Public Works Department, City of Round Rock FROM: Chien Lee, P.E., AICP c d, DATE: June 11, 1999 PROJECT: Rubio Subdivision Improvement RE: HLA Project No. 13571 SUBJECT: Contractor's Change Order No. 1 MEMORANDUM Pursuant to the city's request for the following listed additional improvements for the referenced project, please find attached Change Order No. 1 in the amount of $19,525.48 to the contract: 1. Extend Baker Street southward approximately 77 feet and Rubio Avenue eastward approximately 21 feet with additional pavement and turnaround area, install concrete ribbon curb, install 6 -inch water line and service line accordingly to serve the adjacent properties with a total increase in the amount of $9,498.00. 2. Provide labor for the installation of 20 new water meter boxes and water meters (to be provided by the city) with a total increase in the amount of $829.78. 3. Remove installed 8' wide concrete valley gutter and replace with 17' concrete valley gutter for better drainage flow and vehicular driving condition with an increase in the amount of $1,990.70. 4. Install a grate inlet and approximately 325 feet of 12" PVC storm sewer near the southwest intersection of Rubio Avenue and Baker Street to convey storm runoff to the proposed Rubio channel with an increase in the amount of $6,807.00. 5. Add one additional 6 -inch gate valve for the proposed water distribution system with an increase in the amount of $400.00. The updated contract amount is presented below: Original Contract Amount This Change Order (No. 1) Revised Contract Amount $ 615,396,25 19.525.48 $ 634,921.73 Should this proposed change order meet with your approval, please execute the attached form and retum to our office for coordination with the contractor. We look forward to the continuing progress of this project. If you have any questions about this project, please do not hesitate to contact our office. Attachment: Change Order (No. 1) Form Letter dated 5 -7 -99 from Bay Maintenance Company Letter dated 5 -14 -99 from Bay Maintenance Company Fax copy dated 6 -1 -99 from Bay Maintenance Company Fax copy dated 5 -26 -99 from Bay Maintenance Company CC: Bay Maintenance Company (Letter Only)