R-99-07-08-10C2 - 7/8/1999CPR No. Item and Description of Changes Contract Price Contract Time Decrease Increase Decrease Increase 4 Provide modifications to overflow structure at Chisholm Valley elevated tank. 0 0 0 0 5 Provide anti - graffiti coating at base of each elevated tank. 0 11,794.00 0 5 6 Delete remaining HMAC paving at Chisholm Valley elevated tank site. 1,630.00 0 0 0 Sub - Total Difference Net 1,630.00 11,794.00 0 5 10,164.00 5 hD: 1 Project Name: City of Round Rock Water System Improvements Contract No. 1 — Elevated Water Storage Reservoirs Project Owner: (Name, Address) City of Round Rock, Texas 2008 Enterprise Dr. Round Rock, Texas 78664 Project Contractor: (Name. Address) Landmark Structures, Inc. 1665 Harmon Road Fort Worth, Texas 76177 It is agreed to modify the Contract referred to above as follows: Summary: It is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order 1 $2,709,673.00 Net Increase (decrease) of this Change Order 1 $10,164.00 Revised Contract Price with all approved Change Orders 1 $2,719,837.00 Approved for Owner by: Distribution: I O Owner 1 'Contractor HDR Project No 07225 - 036 - 036 - 02 Owner's Project No.: N/A Date of Issuance: June 22, 1999 Date of contracr: December 10, 1998 Contra« Period: 480 Days Change Order No. 2 Contract Time prior to this Change Order (February 9, 2000 (480 days/ Net Increase (decrease) of this Change Order 15 days Revised Contract Time with all approved Change Orders F February 14, 2000 (485 days) The changes included in this Change Order are to be accomplished In accordance with the terms, stipulations and conditions of the original Contract as though included therein. f N�C0tal4 C h .S�iu�.ro 1 — � 51g9 Accepted 5 r nVactor bY: Date (7 Appr4fal Bf (NOR Engineering, Inc.) Date Attest Date Approved: (Other - when required) Date 'Office 'Field 'Other FORM 111.5020-2 (Version 1.0 Oct 90) Task 5020 HI-5020-2 Copyright 1991 HDR Engineering. Inc. azw 1 1 1 1 A Project Name: City of Round Rock Water System Improvements Contract No.1 Elevated Water Storage Reservoirs Project owner: City of Round Rock NOR Projact No.: 07225 -036- 036 -01 Contractor: Landmark Structures, Inc. Attention: The following change in the contract on this project is proposed. A breakdown of cost SHALL be attached. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: Provide all labor, materials, and equipment to add or delete the Work identified below. Provide proposal identifying costs associated with labor and materials separated with Contractor's Overhead and Profit for the Work denoted separately as well t. For the Chisholm Valley site, replace Detail 1 and Secti A as s 1 and Section A as shown on the attached Figure 1. � By All work shall be in accordance with the terms, stipulations, and conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: _ Increased _ Decreased )(Unchanged by lJ calendar days. This change will: _ Ada oeduci 14 Not Change FORM III -5010-3 Von 90) Copyright 1991 HDR Engineering. Inc. Owner's Project No. 01 applicable): NIA Regulatory Agency Project No. lit applicable): NIA initiated by: X Engineer Contractor HDR Recommendation: Change Proposal Request No.4 (Not a Change Order) �c'iiecomrnen e Acceptance 1 By: HDR Eng 1,00. /l 9 Task 5010 Date O wn s Action: V A n Plan Sheet 3P03 with Detail A1 R Offend — cce O ce.ted ct (Date: 04/20199 ■bJ UUG /U114 111 - 5010 -3 8 - 6' -0 6--.. 1 1a' Dv. ac wsrAL A �: C az' ANO PLUG n - r n ERO (09 00556(1105 I I I TO BE MADE OY OTHER B -i2 rHicK 916RA 0 o o � d � � � � • . 000 0 8 NEE R -4040 SERIES OR APPRW[ EQUAL 1 I yy ry 1 1 I ALE I VALK 1 !�^ W6' FL.FL•W PPE Is R ESTRUNE. h JOmI 16 OVE pFLOW/ 5 DRAI E L1GNT DD1Y GMTE. _ 1,.:1. srzm TO nl e6u END Or 1a Dla acP t u��� LL�LI�I C VW .p.:1. 4 FLAP v N.VE ` � I f F � DR • FL. EL.NJ wall PIPE 1 og $o „1 (9)9-Vc) 1 ( S �n� 0.., °SPD3 c° NO - (2141.) 2 SCH. B0 N PYL DR,N - 2' SCH. 80 PVC ORAN REGRADE AND REVECETATE HDR Engineering, Inc. VIJ :1/01 - CAC JIKVI,IUKt L)UAIL 1 SCALE: 1/0 - 1 " -0' 3003 16' FL.FT.NJ WALL PIPE e A001110.µ STEEL Al OPENING. SEE OELUL INSTALL 2116 DELL END FLUSH H TOP OF SUB 6" MIN. CONPACTEO GRANULAR FILL LE. 840.00 EOM CHISHOLM VALLEY DISCHARGE STRUCTURE PROVIDE 12 GAUGE 55T 14E50 RODENT SCREEN BETWEEN FIANCES 111 OC. E. (TM) 16" FLAP VALVE 18" DIA. ASTM C76 GASKETED RCP BY HANSON OR EQUAL DISCHARGE STRUCTURE SECTION A SCALE. 1/4 - 1 -0" 3PO3 SPO- 12 -ADDITIONAL STEEL AT OPENING. SEE DETAIL EIZEI 3 /a" C (r1P. ALL (XPOSEO CORNERS) 16 OV82102/ 02.53 PPE CITY OF ROUND ROCK, TEXAS CONTRACT NO. 1, ELEV. WATER STORAGE RESERVOIRS TOP OE 5158 TOP OF SLAB fig ure 1 34 31 CL ELEV. = 847.50 HIGH PT. - 046.25 L0w PT. = 646.15 04/20/99 riJA Contractor: Landmark Structures, Inc. FORM 111- 5010 -3 (lun 90) Copyright 1991 HDR Engineering. loc. (PRIVATE )Project Name: City of Round Rock Water System Improvements Contract No.1 Elevated Water Storage Reservoirs Project owner: City of Round Rock HOE Project No.: 07225- 036 - 036 -01 O Attention: The following change in the contract on this project is proposed. • A breakdown of cost SHALL be attached. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: Provide all labor, materials, and equipment to add or delete the Work identified below. Provide proposal identifying costs associated with labor and materials separated with Contractor's Overhead and Profit for the Work denoted separately as well. 1. Provide a protective "anti - graffiti" coating to be applied as a clear coat on the bottom 15 -feet around the circumference of the concrete base of each elevated water tank. Coating to be applied on all concrete and ferrous surfaces. The coating shall be Sherwin Williams product SWD VOC Aliphatic Urethane B65WJ Series as indicated on the attached material product sheet. Application shall be such that the product is placed in two (21 coats, with each coat bet 1.5- ils DFT or being applied at a rate of lgal /200 -sf. All work shall be in accordance with the terms, stipulations, and conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: Increased - Decreased - Unchanged by � calendar days. Date This change will: J_` Add _ Deduct _ Not Change Owner's Action: / I <,(1=S P '" Gin {al ConRy'e4 t L By Owner � r . Ioaro 'ZD A (j (Date Task 5010 wner's Project No Ed aPPlicaele■: N/A Regulatory Agency Project No. 01 applicable): N/A Initialed by:(PRIVATE ) X Engineer Contractor HDR Recommendation: Raeomr +endee Accepts L C.� 9y: H0R E09ineerin9, Ir 0 11 / 9 � ( zk Change Proposal Request No.5 (Not a Change Order) of Recommend lance Date: 4/19/99 111 - 5010 -3 P J V l L Color: WNee. Other Nebo.✓rimed Colon a Clear 0 2 RPR - 14 - 1999 09;45 97% P. 01 5.401 SWD VOC ALIPHATIC URETHANE B65WJ SERIES (-8A_uACTERU ICS A ewe component polyurethane Nor use an prop.rly printed and/or property palmed metal and .money magas.. May be •ppbd wee epoxy and urethane coming. lie Clear erelun V formula and with new eabithen " or exterior durability. F4udr: 90. Urrt. @ 60 Dever Cnverage: 300 Square Feet per (hUon 4314 mdla vet /2.0 ae0a dry Drying Tithe 4,1 S0% R8 t T/F: To Trade To Ramat MI COM 30 minnow 11 Hogs 10 Dmya Vehicle_ Aliphatic Uretha.• Volume Solids: 17.0% •1.2% (Catdyted) Midair U.c only 041 Colorants Wright per Gallen: 10.6 tb. per gallon VOC. 3.24 I. per eaiJ340 gram. per Ira Reducer: Below 00 df: Kylol Above 00 dr; R7K132 SPFCIFICATIONS May 1r .pplk4 ever pteperty primed malacca. Sere .0 dead eyst.r a.• u Sodom, Steel: 1 Coat Recoaablc Epory, 967 Seria 2 Coati SWD VOC Aliphatic Urethane OR 1 Coat Zino Clad, 9AS Scrim 2 Cosa SWD VOC Aliphatic Urethrae Ma ter$: l Coat Epe y Eater Masonry Filler 2 Coma SWD VOC Aliphatic Urethane SURFACE PRF'PARATION Surface end ambient te.tperateres mutt be above 50 Deg. at drr tar of epppcadmw BLOCK CINDER AND CONCRETE - LXTERIOR OR INTERIOR- Surface. sari be fiat [ma dirt lore or eaceaa ma +ar, and OwcomMy dty. Painting with a laces paint may proceed in 30 days wider normal drying condition. R.fentom S.W 1 GALVANIZED META. SURFACES - A9ow R .sadsr • commew of At (6) coda pilot 10 mating. Saloon dean per SSPC-5PI. dhm prune u regnit.i When weathering is not poa.We ar the ,0611.e kat ban treated Mth chromate* o r siRcaim, ernesolvate dean per SSPCSP1 and apply • rear anti pfl i g M te(OIIw4 Are. paint to dry one weak Irian hating. 1/ adl.aket V poor. brash Ws/Wegls mweetary 0e remove these mamma Ro(errce S 10. PREVIOUSLY COATED SURFACES All madam coanadmoban sods w all, r o. 0. lams palm mill wale. dirt foreign matter. ide. mold. Midew. morose, rllbrmoemc. an/ .raters 06064 be reread to .acre • snood bonding to the dgntiy adhering old paint Clam .maw. or old paint fiba mat be clean srd dull hef repainting, Spot prime here arms with the appropriate prince C1cck (or eoap.tib3ty of the po.00oedy painted surfer .Hh the .coo eo0dng by *preying • ten area Recotrta a that any madame preparation ahem or total rcaaooal or rid comfort why compromise Ate an-Wm length of the nester. Rsferwtor S-W 11. VOCPOLY VN(4 0629■66 May 18, 1999 8:40 AM From: Bob Bridendolph Industrial and Marine Coatings Epoxy Sweat-In-time: Shelf Life: Flash Point: Reducer /Clean Up; KEM CATI -COAT HS EPDXY FILLER/SEALER is a high performance, interior /exterior, VOC compliant, epoxy block filler. Designed for tenacious adhesion to masonry substrates while filling voids and crevices to smooth the surface. Excel- lent resistance to moisture, humidity, impact, and abrasion. • Suitable for use in USDA inspected facilities • Chemical resistant • Long pot life • Resurfaces spelled and deteriorated concrete Finish: Color: Volume Solids: Weight Solids: VOC (EPA Method 24): mixed MIS Ratio: PRODUCT IN Flat Off White 72% s 2%, mixed 84% ± 2%, mixed Unreduced: 184 g /L; 1.501b/gal Reduced 1214 %:305 g/L; 2.54 lb /gal 2 components, 1:1 by volume Recommended Spreading Rate per coat: Wet mils: 14.0 - 28.0 Dry mils: 10.0 -20.0 Coverage: 60 - 115 sq ft /gal approximate Spreading rate dependent on surface profile and porosity. NOTE: Brush or roll application may require multiple coals to achieve maximum film thickness and uniformity of appearance. Drying Schedule ® 15.0 mils wet ® 50% RH: 77 °F To touch: 1 -3 hours To recoat: minimum: 18 hours maximum: • 30 days If maximum recoat time is exceeded, abrade surface before recoating. Drying time is temperature, humidity, and film thickness dependent. Pot Life: 8 hours 8 77°F, 50% RH 30 minutes ® 77°F, 50% RH 12 months, unopened, at 77 °F 103 °F, PMCC, mixed Reducer 4145, R7K145 FORMATION For use over prepared concrete and masonry surfaces, in areas such as: • Secondary containment • Chemical plants • Power plants • Tunnels • Schools • Prisons • Equipment foundations System Tested: (unless otherwise indicated) Substrate: Concrete Surface Preparation: Clean, dry, sound Finish: 1 ct. Kem Cati -Coat HS ® 15.0 mils rift Adhesion: Method: ASTM 03359, Method 8 Result: 5B, 100% retention Flame Spread Rating: Method: ASTM E -84 Tunnel Test Result: Class A on noncombustible surfaces Direct Impact Resistance: Method: TTC -5558, 4.4.4 Result: Minimum resistance at 6 in. lbs. Freeze/Thaw: Method: ASTM D2246, 20 cycles Result: Passes Dry Heat Resistance: Method: ASTM 02485 Result: 250 °F, 275 °F intermittent Flexibility (cold rolled steel): Method: TTC-555B, 4.4.3, 1 • mandrel Resu tt: Passes Humidity Resistance: Method: ASTM D2247, 100 °F, 1000 hours Result: Passes, no blistering or loss of adhesion Wind Driven Raln: Method: TTC-555B, 4.4.7 Result: Passes Revised 1/97 Epoxy coatings may darken or yellow following application and curing. 4.21 2004553 Fax #: (512) 238 -7032 Page 2 of 5 PART A PART B 4.21 KEM CATI-COAT® HS EPDXY FILLER/SEALER 042W400 ilk WHITE B42V401 WIDENER continued on back May 18, 4999 8:40 AM From: Bob Bridendolph Fax #: (512) 238 -7032 Page 4 of 5 ( CE Industrial and Marine 1 611 5 Coatings Epoxy 4.21A 2004553A 4.21 A KEM CATI-COA1® HS EPDXY FILLER/SEALER PART A B42W400 43k WHITE PART B B42V401 WIDENER APPLICATIO Surface must be clean, dry, and In sound condition. Remove all oil, dust, grease, dirt, loose rust, and other foreign material to ensure adequate adhesion. Masonry and Block Surfaces should be thoroughly clean and dry. Concrete and mortar must be cured at least 28 days @ 75 ° F. Remove all loose mortar and foreign material. Surface must be free of laitance, concrete dust, dirt, form release agents, moisture cur- ing membranes, loose cement and hardeners. Poured Concrete New Surface must be clean, dry, sound, and offer sufficient profile to achieve adequate adhesion. Minimum substrate cure Is 28 days at 75 ° F. Remove all form release agents, curing com- pounds, salts, efflorescence, laitance, and other foreign mat- ter by sandblasting, shotblasting, mechanical scarification, or suitable chemical means, such as muriatic acid etch, refer to ASTM 04260. Rinse thoroughly to achieve a final pH between 6.0 and 10.0. Allow to dry thoroughly prior to coating. Old Surface preparation is done in much the same manner as new concrete; however, if the concrete is contaminated with oils, grease, chemicals, etc., they must be removed by cleaning with a strong detergent. Refer to ASTM D4258. Form release agents, hardeners, etc. must be removed by sandblasting, shot - blasting, mechanical scarification, or suitable chemical means. If surface deterioration presents an unacceptably rough sur- face, Kem Cati -Coat HS Epoxy Filler /Sealer Is recommended to patch and resurface damaged concrete. Fill all cracks, voids and bugholes with ArmorSeal Crack Filler. Always follow the ASTM methods listed below: ASTM D4258 Standard Practice for Cleaning Concrete. ASTM 04259 Standard Practice for Abrading Concrete. ASTM D4260 Standard Practice tor Etching Concrete. ASTM D4263 Plastic Sheet Method for Checking Moisture in Concrete. N BULLETIN Revised 1/97 Temperature: Relative humidity. 85% maximum 45 °F minimum, 100 °F maximum (air, surface, and material) At least 5° above dew point The following is a guide. Changes In pressures and hp sizes may be needed for proper spray characteristics. Always purge spray equpment before use with listed reducer. Any reduction must be compatible with the existing environmental and appli- cation conditions. Reducer /Clean Up Reducer *145, R7K145 Airless Spray Pump 30:1 Hose 3/8' ID Tip 019' - .023' Reduction as needed up to 12Ya% by volume Brush Brush Natural Bristle Reduction as needed up to 121% by volume Roller Cover 318 -1/2' woven with phenolic core Reduction as needed up to 121/2 by volume Squeegee Reduction as needed up to 121% by volume If specific application equipment is listed above, equivalent equipment may be substituted. continued on back ^00 al Uo / Ai/ y0 14:40 'Ca - Clo ado() (Neje. Name: City of Round Rock Water System improvements Contract No.1 Elevated Water Storage Reservoirs Praieet o - ner: City of Round Rock HoR Prpicct No 07225- 036- 036 -01 Contractor: Landmark Structures, Inc. Attention: The following change in the contract on this project is proposed. • A breakdown of cost SHALL be attached. • work shall not commence until authorized by the Owner. — - -- - Description of the Proposed Change:. Provide all labor, materials, and equipment to add or delete the Work identified below. Provide proposal identifying costs associated with labor and materials separated with Contractor's Overhead and Profit for the Work denoted separately as well. 1. Delete all HMAC paving'associated with the site plan for the Chisholm Valley elevated tank. Provide only surface preparation and flexible base course installed nd compel d:r the specifications. All work shall be in accordance with the terms, stipulations. and conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: incricapdd Decreased Y Unchenoad by calendar days. This change will: Add Deduct _ Not Cnen30 5 o 3(0 General Contractor FOAM 11)4010.5 (Pm 90) Cepydyat leaf HUB Entineering. Ere. rUDLIt. 11Ultn3 OWnci a Praiem No. or epaceeolel: NIA RcOulatory AAe■y Prelcc No - (u epo0caofer: N/A nirieua Sy: X Engineer Convecror HDR Recommendation: end d Ac eptpnce By; F100 Engin . na 1 (i 4) 1/, Date owDCi s Action: _ Accepted J Br Owner Task 5010 Change Proposal Request No.6 (Not a Change Order) i Oou: 5125199 mmend 111.501 Xv3 SC:60 IAA 66/91/00 RESOLUTION NO. R- 99- 07- 08 -10C2 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Landmark Structures, Inc. for improvements to the Chisholm Valley elevated tank, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with Landmark Structures, Inc. for improvements to the Chisholm Valley elevated tank. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED ATTEST: � a./YVV ti G7 ""v ' `^o L- K. \WPOOCS \RESOLUTI\R90708C2. WPD /s =y this 8th day of July, 1999. E LAND, City Secretary R' A. STLUKA, Q}t., Mayor City of Round Rock, Texas CPR No. Item and Description of Changes Contract Price Contract Time Decrease Increase Decrease Increase 4 Provide modifications to overflow structure at Chisholm Valley elevated tank. 0 0 0 0 5 Provide anti - graffiti coating at base of each elevated tank. 0 11,794.00 0 5 6 Delete remaining HMAC paving at Chisholm Valley elevated tank site. 1,630.00 0 0 0 Sub •Total Difference Net 1,630.00 11,794.00 0 5 10,164.00 5 Project Name: City of Round Rock Water System Improvements Contract No. 1 — Elevated Water Storage Reservoirs Project Owner: (Name, Address) City of Round Rock, Texas 2008 Enterprise Dr. Round Rock, Texas 78664 Project Contractor: (Name, Address] Landmark Structures, Inc. 1665 Harmon Road Fort Worth, Texas 76177 It is agreed to modify the Contract referred to above as follows: Summary: It is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order 1 52,709,673.00 Net Increase (decrease) of this Change Order 1 610,164.00 Revised Contract Price with all approved Change Orders 1 52,71 9,837.00 Distribution: FORM 111 - 5020 -2 (Version 1.0 Oc: 90) Copyright 1991 HDR Engineering, Inc. 9 (HDR Engineering, Inc.) Task 5020 HDR Project No.: 07225 036 - 036 - 02 Owner's Project No.: N/A Date of Issuance: June 22, 1999 Date of Contract: December 10, 1998 Contract Period, 480 Days Change Order No. 2 Contract Time prior to this Change Order 1 February 9, 2000 (480 days) Net Increase (decrease) of this Change Order 1 5 days Revised Contract Time with all approved Change Orders 1 February 14, 2000 (485 days) The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions of the original Contract as though included therein. Accepted or Contractor by: - 4 / 2. 091 Date — zz -9y Date 111- 5020 -2 1 1 1 1 1 14: 415 Yl - 01O 0000 rUVLlt, IYV19t5J Project Name: City of Round Rock Water System Improvements Contract No.1 Elevated Water Storage Reservoirs Project Owner: City of Round Rock 9011 Project on 07225 - 03 6- 036 -01 Contractor: Landmark Structures, Inc. Attention: The following change in the contract on this project is proposed. • A breakdown of cost SHALL be attached. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: Provide all labor, materials, and equipment to add or delete the Work identified below. Provide proposal identifying costs associated with labor and materials separated with Contractor's Overhead and Profit for the Work denoted separately as well. 1. For the Chisholm Valley site, replace Detail 1 and Secti A as s 1 and Section A as shown on the attached Figure 1. All work shall be in accordance with the terms, stipulations. and conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: _ Increased _ Decreased Y. Unchanged by (5 calendar days. This change will: _ Add _ Deduct Not Change 1 0.0o 9�7• elry� yl1: al Contractor or FORM III - 5010 -3 (Jon 90) Copyright 1991 1-1130 Enginecring. Inc. Owner's Project No. lit applicable): N/A Regulatory Agency Project No. lit epplicablel: N/A Initiated by: (Date: 04/20/99 X Engineer Contractor B Task 5010 NOR Recommendation: Owrys Action: Accepted By: Owner Dale (p ( kg lt/JUUZ /004 Change Proposal Request No.4 (Not a Change Order) Plan Sheet 3P03 with Detail 111 - 5010 -3 May 11, 1999 Sent via Facsimile (512) 912 -5166 Original to Follow in Mail. HDR Engineering 2211 S. IH -35, Suite 300 Austin, Texas 78741 Attn: Mr. Brad Castleberry Re: Water System Improvements Contract No. 1 — Elevated Water Storage Reservoirs City of Round Rock, Texas Dear Sir: Per your request after reviewing Change Proposal Request No, 4, I find that there will be no cost or credit applied to this CPR. Yours very truly, LANDMARK STRUCTURES, INC. Gary Moravits Project Manager /cm Design Innovation . Construction. Excellence LANDMARK 1665 Harmon Road Fort Worth, Texas U.S.A. 76177 Tel: (817) 439 -8888 Fax: (817) 439 -9001 2' SCH. 80 PVC DRAIN- L_ 2• SCH. 80 PVC DRAIN RECRADE AND REVECETATE yi-em/ HDR Engineering, Inc. 18' Du RCP. P:STALL GRADE AND P n T1 — END FOR CONNECTOR I II TD BE LURE BY OTHERS �1 I JU O 0008 DISCHARGE STRUCTURE DETAIL I rTh I SCALE 3003 1/4• - 1' -0" 000111ON, STEEL AT OPENING. SEE OETUL INSTALL PIPE BELL END FLUSH W1TH TOP OF SLAB 6 NW_ COMPACTED S GRANU LL EMU PROVIDE 12 GAUGE SST MESH ROOMY SCREEN BETWEEN FIANCES I.E. 040.00 12' -0 CHISHOLM VALLEY DISCHARGE STRUCTURE 3003 3003 16' FLAP VALVE R5 BARS AT 10 O.C. E.W. (TYP) 16 FLuRxMJ WALL PIPE I8 DA... ASTM C26 GASHETED RCP BY HANS05 OR EOUAL DISCHARGE STRUCTURE SECTION SCALE: /4 - 1' -0" 3003 300' 12" ° 0 0 0 0 0 OL — ADDITIONAL STEEL AT OPENING. SEE DETAIL (F-12- THICK ELM 3/4 CHw1ER (1Y0. ALL ELYROSE0 CORNERS) 16' OVERFLOW/ DRVN PIPE CITY OF ROUND ROCK, TEXAS CONTRACT NO. 1, ELEV. WATER STORAGE RESERVOIRS TOP OF SLAB 3003 3003 CL ELEV. = 847.50 HIGH PT. - 846.25 TOP OF SLAB LOW PT. = 846.15 Dole 04/20/99 1g e 1 1 NEEnw R -4040 SERIES OR APPROVED ECU, 1 I I 1 n I 44 I I II I FLAP VALVE rl 1 /(:1 I I I I I wµLFPIP( W 15 RESTRAINED n JOINT 16 OVERFLOW / DRAIN MIRE LIGHT DU, RATE, ■ ∎ I� C ° FLOOR DRAM uvE Is SIZED TO FIT BELL END OF 18 Du. RCP T1■ ■ � �� .7 Fr 00*40 r u II C7 * .f. = I a' FL4F1.414-1 WALL PIPE 2' SCH. 80 PVC DRAIN- L_ 2• SCH. 80 PVC DRAIN RECRADE AND REVECETATE yi-em/ HDR Engineering, Inc. 18' Du RCP. P:STALL GRADE AND P n T1 — END FOR CONNECTOR I II TD BE LURE BY OTHERS �1 I JU O 0008 DISCHARGE STRUCTURE DETAIL I rTh I SCALE 3003 1/4• - 1' -0" 000111ON, STEEL AT OPENING. SEE OETUL INSTALL PIPE BELL END FLUSH W1TH TOP OF SLAB 6 NW_ COMPACTED S GRANU LL EMU PROVIDE 12 GAUGE SST MESH ROOMY SCREEN BETWEEN FIANCES I.E. 040.00 12' -0 CHISHOLM VALLEY DISCHARGE STRUCTURE 3003 3003 16' FLAP VALVE R5 BARS AT 10 O.C. E.W. (TYP) 16 FLuRxMJ WALL PIPE I8 DA... ASTM C26 GASHETED RCP BY HANS05 OR EOUAL DISCHARGE STRUCTURE SECTION SCALE: /4 - 1' -0" 3003 300' 12" ° 0 0 0 0 0 OL — ADDITIONAL STEEL AT OPENING. SEE DETAIL (F-12- THICK ELM 3/4 CHw1ER (1Y0. ALL ELYROSE0 CORNERS) 16' OVERFLOW/ DRVN PIPE CITY OF ROUND ROCK, TEXAS CONTRACT NO. 1, ELEV. WATER STORAGE RESERVOIRS TOP OF SLAB 3003 3003 CL ELEV. = 847.50 HIGH PT. - 846.25 TOP OF SLAB LOW PT. = 846.15 Dole 04/20/99 1g e 1 Contractor: "Da Landmark Structures, Inc. Attention: The following change in the contract on this project is proposed. • A breakdown of cost SHALL be attached. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: CUD, 1 1101h. Owner's Project No. (if applicable': N/A Regulatory Agency Project No. Of applicable): N/A Initiated by:(PRiVATE X Engineer Contractor Change Proposal Request No.5 (Not a Change Order) {PRIVATE )Project Name: City of Round Rock Water System Improvements Contract No.1 Elevated Water Storage Reservoirs Project owner: City of Round Rock HOR Project No.: 07225- 036 - 036 -01 IDele: 4119/99 Provide all labor, materials, and equipment to add or delete the Work identified below. Provide proposal identifying costs associated with labor and materials separated with Contractor's Overhead and Profit for the Work denoted separately as well. t. Provide a protective "anti- graffiti" coating to be applied as a clear coat on the bottom 15 -feet around the circumference of the concrete base of each elevated water tank. Coating to be applied on all concrete and ferrous surfaces. The coating shall be Sherwin Williams product SWD VOC Aliphatic Urethane B65WJ Series as indicated on the attached material product sheet. Application shall be such that the product is placed in two (2) coats, with each coat bei 1.5- its DFT or being applied at a rate of lgal /200 -sf. All work shall be in accordance with the terms, stipulations, and conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: by � calendar days. This change will:° Add Deduct Not Change Gn Comrayw v `ct )` S 1 000 SO -11 7 T_cr (—av1 C FORM 10- 5010 -3 (Jun 90) Copyright 1991 HDR Fsginccring, Inc. k ( " *T-. ray MR Recommendation: / Recom' Accepta ce By: HOR ginee g, 1 . Date Owner's Action: (ce pled r�alwY (1 rt.,. irci ,Date at Recommend anea 1 NopV�Cepted II I.. t(JUVJ /004 Task 5010 111-500-3 May 20, 1999 Sent via Facsimile (512) 912 -5166 Original to Follow in Mail. HDR Engineering 2211 S. IH -35, Suite 300 Austin, Texas 78741 Attn: Mr. Brad Castleberry Re: Water System Improvements Contract No. 1 — Elevated Water Storage Reservoirs City of Round Rock, Texas Dear Sir: LAN ID MAR K Per your request, I am providing a breakdown of costs related to Change Proposal Request No. 5. The total area to be covered is approximately 2015 square foot based on a coverage height of 15 foot above grade. I have spoken with Mr. Bob Bridendolph of Sherwin Williams in order to get the pricing and coverage per gallon. The quantities below are based on the information from Bob. Urethane (B65WJ) 18 Gallons at $39.00 /Gallon (2 coats) 702.00 Block Filler (Kem Cati -Coat HS) 30 Gallons at $21.00 /Gallon 630.00 Labor to Install $2.00 /Sq. Ft. 4,030.00 OH & P 10% 535.00 5,897.00 Total Cost CPR No. 5for both tanks $11,794.00 Landmark does not recommend using Anti - Graffiti Coatings, because we found that it will discolor the concrete. Epoxy Block Filler will be "off- white" and this will not match the concrete. We recommend to leave the blasted concrete finish for one year and after that time determine if an anti - graffiti coating is necessary. Another consideration prior to applying a coating to the pedestal is that you will create an additional maintenance requirement. We know of only one of our tank pedestals that has been used by a graffiti artist after construction was complete; the graffiti in this case was removed by a light sandblast. Please let me know if you need any additional information on these items. Yours very truly, LANDMARK STRUCTURES, INC. Gary Moravits Project Manager /cm attachment Design Innova5on • Construction Excellence 1665 Harmon Road Fort Worth, Texas U.S.A. 76177 Tel: (817) 439 -8888 Fax: (817) 439 -9001 '.J J v t L j� C.d0r, WN. o Otter Pxk.a✓fmted Colors � °� A Clear 0 tJ 2 RPR - 14 -1999 09 5A01 SWD VOC ALIPHATIC URETHANE B65WJ SERIES CHABACCERISIICS A Ma corpora polyttredtane !K err an properly primed and/ee properly pained meet and tewo.vy metres. May 1M +POW ante epoxy and undue* coat/bp. The Clear erston 1. formula red with Odin e41itlsrs or exterior durability. Tlddc 90. Thin (1 60 Degou Coverage: 300 Spurt Feet per Gallon .'� 1.6 mllseel /2.0 lass 4ty Drying Moe ($SO%RH& To Tomb: 30 .porter To Ransom 11 Kees P141 Curt: 10 Days Vehklee Aliphatic Urethan. Volume Solids: 55.0% *1. Z% (Catalysed) Thelma Use only 044 Colorants weight per Gallon: 10.6 tie. per gallon V OC 324 Mb per .,,_t 10 00 wane per bee Reducer: Below 60 elf: Cylo1 Above 00 df: RIK111 PFC1F1CATIONS May be applied Wet properly primed ~feces. Somme auseesred yens. ace tut Miaow Sundt 1 Cone Rccontable Epory, 067 Seri. 2 Conn SWD VOC Aliphatic Urethane OR 1 Cost Arc Clad. B60 Series 2 Co. SWD VOC Miphade Ur.thww Mwp7: 1 Co.1 Epooy Ester M.•mvy FEW 2 Coate SWD VOC Anginadt Dr,. SURFACE PRFP *RATION Surface and aabtett temperatures nowt be ako.e 50 Deere. all the date of eppbcador. BLOCK. CINDER, AND CoNCRPTE - LYTERIOR OR INTERIOR. Surface. 000.1 be free nor din. I. or teems sooner, and dreo0d4y dry, Paatlm6 with • Wen peat any proceed in 10 dike. . Riker normal trying eon.i0o..a Rater.,.. 5.w 1. GALVANIZED METAL SURFACES - Anew la weather • aaoinYn of As (6) comb prior b coating. Solvent dean per SSPCSPI. dw1 prim. as rsa0irwl. When weathering is new possible .r Oat .utmeg lw been notated with chromasn or p1{calm, Rest whew dean per 9SPC-SP1 owd apply • ten area prating so t.g/0(P4 Nee punt to dry one week before ketu•0. If .dfrdon le poor, brtrk blaming la re asary as reamer dtae Q'0I 01 . Rakrenee SW to. PREVIOUSLY COATED SURFACES Ali erase contark..d.* suds as o1C crw tar.. palm..ill meta. dirt, ford0t miner. io.ti 10041 redden. morose. coin...,.. and staler. .rust be retw.d to .sere • sound hoadlht to the dd.dy alhring 041 paint (:loamy rarroo= of aid pain film amt he clean and dope before .epain0115 Spa( Prime litre area 01!10 the sppropri.te primer. Llrek for coep.6bllity of the pee0laualy palatal surf to with the tree comma( by •pN0Ung • tat area Recognise drat any eerfsee preparation sheen of eta1 reeacend or .14 .eadng .tatty coloprotelse the Denier ]carett of the system. Refere.or SW 11. 9?% VOCPOLV MM4 01200 5.401 SWD VOC ALIPHATIC URETHANE B65WJ SERIES APPUiCATION M 1 1» applied by break. Pollee or spray. AIRLESS SPRAY) Pinny Retie: Tip Sire: yhdd Premiere: Falter Screen: Jo:1 011 -.015 1500. 1600 PSI 100 numb CONVfNT1ONAL SPRAY: Cern Redo It TlpMeodke: 63063A Air Cap: 67PS AIr Premtar: 60-70 PSI Field Premiere: 15 -20 P51 CLEALYMIS ORJAT[ON 6.1eaa mob aid villa 1stnce atdy ell* MtIK nutty *tome. Fella• earanractur n bl/traetlota .hem Wog MEK or ocher odeen4 S PF.(, !Ii INSTRUCTIONS All Cpatda W aro:kee n '.toils twee exceeded the maximum recoils time suet be. mechanically abraded prior so applrinv .aditiohel C0.tin1, MTXTNG INSTRITCTIONS: M18a 4 parrs 6w Competent with 1 pert 860 V2 Convener by velum.- Mir veil and allow 5 slMlra bdac0on dam `prior to apptltaton. Redact wing the app.opri.l yducrt as rerratret Pot tire: 6 Hour. fy 75 degree, (AI rrroNs Do net apply blow SOF er sieve 120F. T?etod free. freetlnL See 1.bd for neat Yons Cautions_ Use only with sdeyurte venul•Rnn •td wear OSHA approved tapir•sary yrntec00n Ise not apply If humial tr is lbw 1514 SM19 104 f1NMATTQPj 865WJ1000 -L6 6402_16304 665W.11000 -19 6015 -10552 B65CJ1000 -16 6015 -10064 B65CJ1000 -19 6015. 10936 96501000 -27 6015.10720 Vt7CPOlY W 4 OS79/90 TOTRL F.93 May 18, 1999 8:40 AM From: Bob Bridendolph Fax #: (512) 238 -7032 Page 2 of 5 Industrial and Marine Coatings KEM CATI -COAT HS EPDXY FILLER/SEALER is a high performance. interior /exterior, VOC compliant, epoxy block filler. Designed for tenacious adhesion to masonry substrates while filling voids and crevices to smooth the surface. Excel- lent resistance to moisture, humidity, impact, and abrasion. • Suitable for use in USDA inspected facilities • Chemical resistant • Long pot life • Resurfaces spatted and deteriorated concrete Finish: Color: Volume Solids: Weight Solids: Flat Off White 72% ± 2%, mixed 84% ± 2%, mixed PRODUCT IN VOC (EPA Method 24): Unreduced: 184g/L. 1.501b /gal mixed Reduced 1214%:305 g/L; 2.54 lb/gal Mix Ratio: 2 components, 1:1 by volume Recommended Spreading Rate per coat: Wet mils: 14.0 - 28.0 Dry mils: 10.0 - 20.0 Coverage: 60 - 115 sq ft/gal approximate Spreading rale dependent on surface profile and porosity. NOTE: Brush or roll application may require multyle coals to achieve maximum f ilm thickness and un fortuity of appearance. Drying Schedule 0 15.0 mils wet @ 50% RH: @ 77 °F To touch: 1 -3 hours To recoat: minimum: 18 hours maximum: - 30 days N maximum recast time is exceeded, abrade surface before recasting. Drying time is temperature, humidity, and film thickness dependent. Pot Life: 8 hours @ 77 °F, 50% RH Sweat -In -time: 30 minutes @ 77 °F, 50% RH Shell Lite: 12 months. unopened, at 77°F Flash Point 103 °F, PMCC, mixed Reducer /Clean Up: Reducer 6145, R7K145 FORMATION For use over prepared concrete and masonry surfaces, in areas such as: Secondary containment Chemical plants Power plants Tunnels Schools Prisons Equipment foundations System Tested: (unless otherwise indicated) Substrate: Concrete Surface Preparation: Clean, dry, sound Finish: 1 ct. Kern Cati -Coat HS @ 15.0 mils dft Adhesion: Method: ASTM 03359. Method B Resu tt: 5B, 100% retention Flame Spread Rating: Method: ASTM E -84 Tunnel Test Result: Class A on noncombustible surfaces Direct Impact Resistance: Method: TTC -555B, 4.4.4 Result: Minimum resistance at 6 in. lbs. Freeze/Thaw: Method: ASTM 02246. 20 cycles Result: Passes Dry Heat Resistance: Method: ASTM 02485 Result: 250 ° F, 275 °F intermittent Flexibility (cold rolled steel): Method: TTC-555B, 4.4.3, 1° mandrel Result: Passes Humidity Resistance: Method: ASTM 02247, 100 °F, 1000 hours Result: Passes, no blistering or loss of adhesion Wind Driven Rain: Method: TTC -5558, 4.4.7 Result: Passes Revised 1/97 Epoxy coatings may darken or yellow following application and curing. Epoxy 4.21 2004553 PAITT A PART B 4.21 KEM CATI -COAL® HS EPDXY FILLER/SEALER B42W400 0' ' B42V401 t iDENER continued on back May 18,1999 8:40 AM From: Bob Bridendolph ILU Industrial and Marine Coatings Fax #: (512) 238 -7032 Page 3 of 5 PART A PART B 4.21 KEM CATI-COA1® HS EPDXY FILLER/SEALER B42W400 Q WHITE 642V401 WIDENER PRODUCT INFORMATION Concrete/Masonry: 1 -2 cts. Kem Cati -Coat HS Epoxy Filler /Sealer V7 10.0 -20.0 mils dlUct as required to fill voids and provide a continuous substrate. 1 -2 cts. Recommended topcoat Recommended Topcoats: Water Based Catalyzed Epoxy Sher -Tile HS Epoxy Armor -Tile 1 Polyester Epoxy Macropoxy HS Epoxy Hi- Solids Polyurethane Corothane 0 Polyurethane DTM Acrylic Coating Refer to the MSCS sheet before use. Publisned technical data and instructions are subject 10 change The systems listed above are representative of the product's without notice. Contact your Sherwin- Williams representative use. Other systems may be appropriate. for additional technical data and instructions. Surface must be clean, dry, and in sound condition. Remove all oil, dust, grease, dirt, loose rust, and other foreign material to ensure adequate adhesion. Refer to product Application Bulletin for detailed surface prepa- ration information. Minimum recommended surface preparation: Concrete /Masonry: Cured, clean, dry. sound Do not tint. Color; Off White Temperature: Relative humidity. 45 ° F minimum, 100 °F maximum (air, surface, and material) At least 5 °F above dew point 85% maximum Refer to product Application Bulletin for detailed application information. Packaging: Part A: Part B: Weight per gallon: 5 gallon containers 5 gallon containers 13.4 z 0.2 lb mixed May 18, 1999 8:40 AM Industrial and Marine Coatings Epoxy From: Bob Bridendolph Fax 5: (512) 238 -7032 Page 4 of 5 4.21A 2004553A PART A PART B 4.21 A KEM CATI-COA1® HS EPDXY FILLER/SEALER B42W400 Q WHITE B42V401 WRDENER APPLICATIO Surface must be clean, dry, and in sound condition. Remove all oil, dust, grease, dirt, loose rust. and other foreign material to ensure adequate adhesion. Masonry and Block Surfaces should be thoroughly clean and dry- Concrete and mortar must be cured at least 28 days ® 75 °F. Remove all loose mortar and foreign material. Surface must be free of laitance, concrete dust. dirt, form release agents, moisture cur- ing membranes, loose cement and hardeners. Poured Concrete New Surface must be clean, dry, sound, and offer sufficient profile to achieve adequate adhesion. Minimum substrate cure is 28 days at 75 °F. Remove all form release agents, curing com- pounds, salts. efflorescence. laitance, and other foreign mat- ter by sandblasting, shotblasting, mechanical scarification, or suitable chemical means, such as muriatic acid etch, refer to ASTM D4260. Rinse thoroughly to achieve a final pH between 6.0 and 10.0. Allow to dry thoroughly prior to coating. Old Surface preparation is done in much the same manner as new concrete; however, if the concrete is contaminated with oils, grease, chemicals, etc -, they must be removed by cleaning with a strong detergent. Refer to ASTM D4258. Form release agents. hardeners. etc. must be removed by sandblasting, shot - blasting, mechanical scarification, or suitable chemical means. If surface deterioration presents an unacceptably rough sur- face, Kem Cati -Coat HS Epoxy Filler /Sealer is recommended to patch and resurface damaged concrete. Fill all cracks. voids and bugholes with ArmorSeal Crack Filler. Always follow the ASTM methods listed below: ASTM 04258 Standard Practice for Cleaning Concrete. ASTM D4259 Standard Practice for Abrading Concrete. ASTM D4260 Standard Practice for Etching Concrete. ASTM D4263 Plastic Sheet Method for Checking Moisture in Concrete. N BULLETIN Temperature: Relative humidity 85% maximum 45 °F minimum, 100 °F maximum (air. surface, and material) At least 5° above dew point The following is a guide. Changes in pressures and hp sizes may be needed for proper spray characteristics. Always purge spray equipment before use with listed reducer. Any reduction must be compatible with the existing environmental and appli- cation conditions. ReducedClean Op Reducer #145. R7K145 Revised 1/97 Airless Spray Pump 30:1 Hose 3/8' ID Tip 019' - .023' Reduction as needed up to 12k% by volume Brush Brush Natural Bristle Reduction as needed up to 1216% by volume Roller Cover 3/8 -1/2' woven with phenolic core Reduction as needed up to 125% by volume Squeegee Reduction as needed up to 12'5% by volume If specific application equipment is listed above, equivalent equipment may be substituted. continued on back May 18,1999 8:40 AM From: Bob Bridendolph Industrial and Marine Coatings Fax #: (512) 238 -7032 Page 5 of 5 PART A B42W400 PART B B42V401 N BULLETIN 4.21 A KEIVI CATI -COAT° HS EPDXY FILLER/SEALER CP WHITE HRDENER APPLICATIO Surface preparation most be completed as indicated. Mixing Instructions: Mix contents of each component thor- oughly with power agitation. Make certain no pigment remains on bottom of can. Then combine 1 part by volume of part A with 1 part by volume of Part B. Thoroughly agitate the mix- ture. Allow material to sweat -in as indicated. Re -stir before using. If reducer solvent is used, add only after both components have been thoroughly mixed, after sweat -in. Apply paint to the recommended film thickness and spreading rate as indicated below: Recommended Spreading Rate per coat: Wet mils: 14.0 - 28.0 Dry mils; 10.0 - 20.0 Coverage; 60 - 115 sq ft/gal approximate Spreading rate dependent on surface profile and porosity. Drying Schedule ® 15.0 mils wet @ 50% RH: 77 °F To touch: 1 -3 hours To recoat; minimum: 18 hours maximum: 30 days ff maximum recoat time is exceeded, abrade surfacebefore recoating. Drying time Is temperature, humidity, and film thickness dependent Pot Life: 8 hours ® 77°F, 50% RH Sweat- in-time: 30 minutes ® 77°F, 50% RH Application of coating above maximum or below minimum rec- ommended spreading rate may adversely affect coating per- formance. Clean spills and spatters immediately with Reducer 4145. R7K145. Clean tools immediately after use with Reducer 8145, R7K145. Follow manufacturers safety recommendations when using any solvent. When using spray application, use a 50% overlap with each pass of the gun to avoid holidays, bare areas, and pinholes. If necessary, cross spray at a right angle. Spreading rates are calculated on volume solids and do not include an application Icss factor due to surface profile, rough- ness or porosity of the surface, skill and technique of the ap- plicator, method of application, various surface irregularities, material lost during mixing, spillage, overthinning, climaticcon- ditions, and excessive film build. Excessive reduction of material can affect film build, appear- ance, and adhesion. Do not apply the material beyond recommended pot life. Do not mix previously catalyzed material with new. Depending on condition of substrate, more than one mat may be required. Do not apply under 50 sq ft/gal or mudcracking may occur. Not recommended for previously painted surfaces. Temperatures above 77'F will shorten pot life. For best results, apply by airless spray and immediately back roll. Do not apply over moisture, or below 45 °F. Refer to Product Information sheet for additional performance characteristics and properties. Refer to the MSDS sheer before use. Published technical data and instructions are subject to change without notice. Contact your Sherwin- Williams representative for additional technical data and instructions. 06/21/99 14:49 COO DI Project Nbme: City of Round Rock Water System Improvements Contract No.1 Elevated Water Storage Reservoirs Fraiect o -no, City of Round Rock Hop prvRct No.: 07225-036-036-01 COntract0 Landmark Structures, Inc. Attention: The following change in the contract on this project is proposed. A breakdown of cost SHALL be attached. - work shall not commence until authorized by the Owner. Description of the Proposed Change: Provide atl labor, materials, and equipment to add or delete the Work identified below. Provide proposal identifying costs associated with labor and materials separated with Contractor's Overhead and Profit for the Work denoted separately as well. - 1. Delete all HMAC paving associated with the site plan for the Chisholm Valley elevated tank. Provide only surface preparation and flexible base course installed . nd comps d Air the specifications. All work shall be in accordance with the terms, stipulations, and conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: lncretted _ Decrev00d Uncna ^gad by calendar days. This change will: _ ado r:30e0d0l - NO1 Cnangc MgnaralCo tre 001c FOAM 111 - 5010_] (Jun 901 Cvpyri3hl Ip91 Hbk Enrineerag. bra. p Z13 bbb;1 rLIjLbt IlU1(1'0 o.•nei a proie0' No. N sopli003'0i N/A IfI JUU4/ UU4 Change Proposal Request No.6 (Not a Change Order) egulatery Agency Projcet N0- 111 aeeliceblel: NIA klat°O or iouc: 5125199 X Engi^ea■ Contractor 6 HOR Recommendation: mnmend end d c apt nc By: HMO Engin r ^ l g. 199 oat Mate Task 5010 , O / )ner's Action: Accepted _Not :.cce � - {)VA , 6y: Owner 111.5010 -3 XV3 SCI6D IHA 66 /BT /90 June 3, 1999 Sent via Facsimile (512) 912 -5166 Original to follow by mail. HDR Engineering 2211 S. IH -35, Suite 300 Austin, Texas 78741 Attn: Mr. Brad Castleberry Re: Water System Improvements Contract No 1 — Elevated Water Storage Reservoirs City of Round Rock, Texas Dear Sir: Per your request, we have compiled a proposal for deleting the HMAC Paving at the Chisholm Valley Site, per Change Proposal Request No. 6. In Change Proposal Request No 1, Item #2, there was 25 If. of HMAC deleted leaving approximately 135 If. x 15 If. remaining (2025 sf.). A credit of $1,630.00 will be issued for this Change Proposal Request. If there are any questions, please contact me. Yours very truly, LANDMARK STRUCTURES, INC. Gary Moravits Project Manager /cm attachment Design Innovation Construction Excellence LANDMARK 1665 Harmon Road Fort Worth, Texas U.S.A. 76177 Tel: (817) 439 -8888 Fax: (817) 439 -9001 DATE: July 2, 1999 SUBJECT: City Council Meeting — July 8, 1999 ITEM: 10.C.2. Consider a resolution authorizing the Mayor to execute Change Order No. 2 for the new Chisholm Valley Elevated Standpipe. Changes include the modification of the tank overflow outfall structure and adding a protective coating on the outside of the tank for future ease of cleaning and the deletion of paving inside the tank site since TU Electric is planning further construction near the tank. The total increase is $13,424.00. Staff Resource Person: Jim Nuse, Public Works Director.