R-99-07-08-10C2 - 7/8/1999CPR No.
Item and Description of Changes
Contract Price
Contract Time
Decrease
Increase
Decrease
Increase
4
Provide modifications to overflow structure at
Chisholm Valley elevated tank.
0
0
0
0
5
Provide anti - graffiti coating at base of each elevated
tank.
0
11,794.00
0
5
6
Delete remaining HMAC paving at Chisholm Valley
elevated tank site.
1,630.00
0
0
0
Sub - Total
Difference Net
1,630.00
11,794.00
0
5
10,164.00
5
hD: 1
Project Name:
City of Round Rock Water System Improvements
Contract No. 1 — Elevated Water Storage Reservoirs
Project Owner: (Name, Address)
City of Round Rock, Texas
2008 Enterprise Dr.
Round Rock, Texas 78664
Project Contractor: (Name. Address)
Landmark Structures, Inc.
1665 Harmon Road
Fort Worth, Texas 76177
It is agreed to modify the Contract referred to above as follows:
Summary: It is agreed to modify the Contract referred to above as follows:
Contract Price prior to this Change Order
1 $2,709,673.00
Net Increase (decrease) of this Change Order
1 $10,164.00
Revised Contract Price with all approved Change Orders
1 $2,719,837.00
Approved for Owner by:
Distribution:
I O Owner 1
'Contractor
HDR Project No
07225 - 036 - 036 - 02
Owner's Project No.:
N/A
Date of Issuance: June 22, 1999
Date of contracr: December 10, 1998
Contra« Period: 480 Days
Change Order No. 2
Contract Time prior to this Change Order
(February 9, 2000 (480 days/
Net Increase (decrease) of this Change Order
15 days
Revised Contract Time with all approved Change Orders
F February 14, 2000 (485 days)
The changes included in this Change Order are to be accomplished In accordance with the terms, stipulations and conditions of the
original Contract as though included therein.
f N�C0tal4 C h .S�iu�.ro 1 — � 51g9
Accepted 5 r nVactor bY: Date
(7
Appr4fal Bf (NOR Engineering, Inc.) Date
Attest Date
Approved: (Other - when required) Date
'Office
'Field
'Other
FORM 111.5020-2 (Version 1.0 Oct 90) Task 5020 HI-5020-2
Copyright 1991 HDR Engineering. Inc.
azw
1
1
1
1
A
Project Name:
City of Round Rock Water System Improvements
Contract No.1 Elevated Water Storage Reservoirs
Project owner: City of Round Rock
NOR Projact No.: 07225 -036- 036 -01
Contractor:
Landmark Structures, Inc.
Attention:
The following change in the contract on this project is proposed.
A breakdown of cost SHALL be attached.
• Work shall not commence until authorized by the Owner.
Description of the Proposed Change:
Provide all labor, materials, and equipment to add or delete the Work identified below. Provide proposal
identifying costs associated with labor and materials separated with Contractor's Overhead and Profit for
the Work denoted separately as well
t. For the Chisholm Valley site, replace Detail 1 and Secti A as s
1 and Section A as shown on the attached Figure 1. �
By
All work shall be in accordance with the terms, stipulations, and
conditions of the original Contract Documents. If the work herein
provided for is Approved by Change Order, the time of completion
will be:
_
Increased _ Decreased )(Unchanged
by lJ calendar days.
This change will: _ Ada oeduci 14 Not Change
FORM III -5010-3 Von 90)
Copyright 1991 HDR Engineering. Inc.
Owner's Project No. 01 applicable): NIA
Regulatory Agency Project No. lit applicable): NIA
initiated by:
X Engineer Contractor
HDR Recommendation:
Change Proposal
Request No.4
(Not a Change Order)
�c'iiecomrnen e
Acceptance
1 By: HDR Eng 1,00.
/l 9
Task 5010
Date
O wn s Action:
V A
n Plan Sheet 3P03 with Detail
A1 R Offend
— cce O
ce.ted
ct
(Date: 04/20199
■bJ UUG /U114
111 - 5010 -3
8 - 6' -0 6--.. 1
1a' Dv. ac wsrAL
A �: C az' ANO PLUG n - r n
ERO (09 00556(1105 I I I
TO BE MADE OY OTHER
B -i2 rHicK
916RA
0 o o �
d
�
� �
�
•
. 000
0 8
NEE R -4040 SERIES
OR APPRW[ EQUAL
1
I
yy
ry
1
1
I
ALE I
VALK 1
!�^
W6' FL.FL•W
PPE
Is
R ESTRUNE. h
JOmI
16 OVE pFLOW/ 5
DRAI E
L1GNT DD1Y GMTE.
_ 1,.:1.
srzm TO nl e6u END
Or 1a Dla acP t u��� LL�LI�I
C
VW
.p.:1.
4 FLAP v N.VE ` � I f F
� DR
• FL. EL.NJ
wall PIPE 1
og
$o „1
(9)9-Vc) 1
( S
�n� 0.., °SPD3 c°
NO
-
(2141.)
2 SCH. B0 N
PYL DR,N -
2' SCH. 80
PVC ORAN
REGRADE AND
REVECETATE
HDR Engineering, Inc.
VIJ :1/01 - CAC JIKVI,IUKt L)UAIL 1
SCALE: 1/0 - 1 " -0' 3003
16' FL.FT.NJ
WALL PIPE
e
A001110.µ STEEL Al
OPENING. SEE OELUL
INSTALL 2116 DELL
END FLUSH
H
TOP OF SUB
6" MIN. CONPACTEO
GRANULAR FILL
LE. 840.00
EOM
CHISHOLM VALLEY
DISCHARGE STRUCTURE
PROVIDE 12 GAUGE
55T 14E50 RODENT
SCREEN BETWEEN FIANCES
111
OC. E. (TM)
16" FLAP VALVE
18" DIA. ASTM C76
GASKETED RCP BY
HANSON OR EQUAL
DISCHARGE STRUCTURE SECTION A
SCALE. 1/4 - 1 -0" 3PO3
SPO-
12
-ADDITIONAL STEEL AT
OPENING. SEE DETAIL
EIZEI
3 /a" C (r1P.
ALL (XPOSEO CORNERS)
16 OV82102/
02.53 PPE
CITY OF ROUND ROCK, TEXAS
CONTRACT NO. 1, ELEV. WATER STORAGE RESERVOIRS
TOP OE 5158
TOP OF SLAB
fig ure
1
34
31
CL ELEV. = 847.50
HIGH PT. - 046.25
L0w PT. = 646.15
04/20/99
riJA
Contractor:
Landmark Structures, Inc.
FORM 111- 5010 -3 (lun 90)
Copyright 1991 HDR Engineering. loc.
(PRIVATE )Project Name:
City of Round Rock Water System Improvements
Contract No.1 Elevated Water Storage Reservoirs
Project owner: City of Round Rock
HOE Project No.: 07225- 036 - 036 -01
O
Attention:
The following change in the contract on this project is proposed.
• A breakdown of cost SHALL be attached.
• Work shall not commence until authorized by the Owner.
Description of the Proposed Change:
Provide all labor, materials, and equipment to add or delete the Work identified below. Provide proposal
identifying costs associated with labor and materials separated with Contractor's Overhead and Profit for
the Work denoted separately as well.
1. Provide a protective "anti - graffiti" coating to be applied as a clear coat on the bottom 15 -feet around
the circumference of the concrete base of each elevated water tank. Coating to be applied on all
concrete and ferrous surfaces. The coating shall be Sherwin Williams product SWD VOC Aliphatic
Urethane B65WJ Series as indicated on the attached material product sheet. Application shall be
such that the product is placed in two (21 coats, with each coat bet 1.5- ils DFT or being applied
at a rate of lgal /200 -sf.
All work shall be in accordance with the terms, stipulations, and
conditions of the original Contract Documents. If the work herein
provided for is Approved by Change Order, the time of completion
will be:
Increased - Decreased - Unchanged
by � calendar days.
Date
This change will: J_` Add _ Deduct _ Not Change Owner's Action:
/ I
<,(1=S P '"
Gin {al ConRy'e4 t L By Owner
� r .
Ioaro 'ZD A (j (Date
Task 5010
wner's Project No Ed aPPlicaele■: N/A
Regulatory Agency Project No. 01 applicable): N/A
Initialed by:(PRIVATE )
X Engineer Contractor
HDR Recommendation:
Raeomr +endee
Accepts L
C.�
9y: H0R E09ineerin9, Ir
0 11 / 9 �
( zk
Change Proposal
Request No.5
(Not a Change Order)
of Recommend
lance
Date: 4/19/99
111 - 5010 -3
P
J
V
l L
Color: WNee. Other Nebo.✓rimed Colon
a Clear
0
2
RPR - 14 - 1999 09;45
97%
P. 01
5.401
SWD
VOC ALIPHATIC URETHANE
B65WJ SERIES
(-8A_uACTERU ICS
A ewe component polyurethane Nor use an
prop.rly printed and/or property palmed
metal and .money magas.. May be •ppbd
wee epoxy and urethane coming. lie Clear
erelun V formula and with new eabithen
" or exterior durability.
F4udr: 90. Urrt. @ 60 Dever
Cnverage: 300 Square Feet per (hUon
4314 mdla vet /2.0 ae0a dry
Drying Tithe
4,1 S0% R8 t T/F:
To Trade
To Ramat
MI COM
30 minnow
11 Hogs
10 Dmya
Vehicle_ Aliphatic Uretha.•
Volume Solids: 17.0% •1.2% (Catdyted)
Midair U.c only 041 Colorants
Wright per Gallen: 10.6 tb. per gallon
VOC. 3.24 I. per eaiJ340 gram. per Ira
Reducer:
Below 00 df: Kylol
Above 00 dr; R7K132
SPFCIFICATIONS
May 1r .pplk4 ever pteperty primed
malacca. Sere .0 dead eyst.r a.•
u Sodom,
Steel:
1 Coat Recoaablc Epory, 967 Seria
2 Coati SWD VOC Aliphatic Urethane
OR
1 Coat Zino Clad, 9AS Scrim
2 Cosa SWD VOC Aliphatic Urethrae
Ma ter$:
l Coat Epe y Eater Masonry Filler
2 Coma SWD VOC Aliphatic Urethane
SURFACE PRF'PARATION
Surface end ambient te.tperateres mutt be
above 50 Deg. at drr tar of
epppcadmw
BLOCK CINDER AND CONCRETE -
LXTERIOR OR INTERIOR- Surface.
sari be fiat [ma dirt lore or eaceaa
ma +ar, and OwcomMy dty. Painting with
a laces paint may proceed in 30 days
wider normal drying condition.
R.fentom S.W 1
GALVANIZED META. SURFACES -
A9ow R .sadsr • commew of At (6)
coda pilot 10 mating. Saloon dean
per SSPC-5PI. dhm prune u regnit.i
When weathering is not poa.We ar the
,0611.e kat ban treated Mth chromate*
o r siRcaim, ernesolvate dean per
SSPCSP1 and apply • rear anti pfl i g
M te(OIIw4 Are. paint to dry one weak
Irian hating. 1/ adl.aket V poor. brash
Ws/Wegls mweetary 0e remove these
mamma Ro(errce S 10.
PREVIOUSLY COATED SURFACES
All madam coanadmoban sods w all,
r o. 0. lams palm mill wale. dirt
foreign matter. ide. mold. Midew.
morose, rllbrmoemc. an/ .raters 06064 be
reread to .acre • snood bonding to the
dgntiy adhering old paint Clam
.maw. or old paint fiba mat be clean
srd dull hef repainting, Spot prime
here arms with the appropriate prince
C1cck (or eoap.tib3ty of the po.00oedy
painted surfer .Hh the .coo eo0dng by
*preying • ten area Recotrta a that any
madame preparation ahem or total rcaaooal
or rid comfort why compromise Ate
an-Wm length of the nester. Rsferwtor
S-W 11.
VOCPOLY VN(4 0629■66
May 18, 1999 8:40 AM From: Bob Bridendolph
Industrial and Marine
Coatings
Epoxy
Sweat-In-time:
Shelf Life:
Flash Point:
Reducer /Clean Up;
KEM CATI -COAT HS EPDXY FILLER/SEALER is a high
performance, interior /exterior, VOC compliant, epoxy block
filler. Designed for tenacious adhesion to masonry substrates
while filling voids and crevices to smooth the surface. Excel-
lent resistance to moisture, humidity, impact, and abrasion.
• Suitable for use in USDA inspected facilities
• Chemical resistant
• Long pot life
• Resurfaces spelled and deteriorated concrete
Finish:
Color:
Volume Solids:
Weight Solids:
VOC (EPA Method 24):
mixed
MIS Ratio:
PRODUCT IN
Flat
Off White
72% s 2%, mixed
84% ± 2%, mixed
Unreduced: 184 g /L; 1.501b/gal
Reduced 1214 %:305 g/L; 2.54 lb /gal
2 components, 1:1 by volume
Recommended Spreading Rate per coat:
Wet mils: 14.0 - 28.0
Dry mils: 10.0 -20.0
Coverage: 60 - 115 sq ft /gal approximate
Spreading rate dependent on surface profile and porosity.
NOTE: Brush or roll application may require multiple coals to achieve
maximum film thickness and uniformity of appearance.
Drying Schedule ® 15.0 mils wet ® 50% RH:
77 °F
To touch: 1 -3 hours
To recoat: minimum: 18 hours
maximum: • 30 days
If maximum recoat time is exceeded, abrade surface before recoating.
Drying time is temperature, humidity, and film thickness dependent.
Pot Life: 8 hours 8 77°F, 50% RH
30 minutes ® 77°F, 50% RH
12 months, unopened, at 77 °F
103 °F, PMCC, mixed
Reducer 4145, R7K145
FORMATION
For use over prepared concrete and masonry surfaces, in
areas such as:
• Secondary containment
• Chemical plants
• Power plants
• Tunnels
• Schools
• Prisons
• Equipment foundations
System Tested: (unless otherwise indicated)
Substrate: Concrete
Surface Preparation: Clean, dry, sound
Finish: 1 ct. Kem Cati -Coat HS ® 15.0 mils rift
Adhesion:
Method: ASTM 03359, Method 8
Result: 5B, 100% retention
Flame Spread Rating:
Method: ASTM E -84 Tunnel Test
Result: Class A on noncombustible surfaces
Direct Impact Resistance:
Method: TTC -5558, 4.4.4
Result: Minimum resistance at 6 in. lbs.
Freeze/Thaw:
Method: ASTM D2246, 20 cycles
Result: Passes
Dry Heat Resistance:
Method: ASTM 02485
Result: 250 °F, 275 °F intermittent
Flexibility (cold rolled steel):
Method: TTC-555B, 4.4.3, 1 • mandrel
Resu tt: Passes
Humidity Resistance:
Method: ASTM D2247, 100 °F, 1000 hours
Result: Passes, no blistering or loss of adhesion
Wind Driven Raln:
Method: TTC-555B, 4.4.7
Result: Passes
Revised 1/97
Epoxy coatings may darken or yellow following application
and curing.
4.21 2004553
Fax #: (512) 238 -7032 Page 2 of 5
PART A
PART B
4.21
KEM CATI-COAT® HS
EPDXY FILLER/SEALER
042W400 ilk WHITE
B42V401 WIDENER
continued on back
May 18, 4999 8:40 AM From: Bob Bridendolph Fax #: (512) 238 -7032 Page 4 of 5
(
CE
Industrial and Marine
1 611 5
Coatings
Epoxy
4.21A 2004553A
4.21 A
KEM CATI-COA1® HS
EPDXY FILLER/SEALER
PART A B42W400 43k WHITE
PART B B42V401 WIDENER
APPLICATIO
Surface must be clean, dry, and In sound condition. Remove
all oil, dust, grease, dirt, loose rust, and other foreign material
to ensure adequate adhesion.
Masonry and Block
Surfaces should be thoroughly clean and dry. Concrete and
mortar must be cured at least 28 days @ 75 ° F. Remove all
loose mortar and foreign material. Surface must be free of
laitance, concrete dust, dirt, form release agents, moisture cur-
ing membranes, loose cement and hardeners.
Poured Concrete
New
Surface must be clean, dry, sound, and offer sufficient profile
to achieve adequate adhesion. Minimum substrate cure Is 28
days at 75 ° F. Remove all form release agents, curing com-
pounds, salts, efflorescence, laitance, and other foreign mat-
ter by sandblasting, shotblasting, mechanical scarification, or
suitable chemical means, such as muriatic acid etch, refer to
ASTM 04260. Rinse thoroughly to achieve a final pH between
6.0 and 10.0. Allow to dry thoroughly prior to coating.
Old
Surface preparation is done in much the same manner as new
concrete; however, if the concrete is contaminated with oils,
grease, chemicals, etc., they must be removed by cleaning
with a strong detergent. Refer to ASTM D4258. Form release
agents, hardeners, etc. must be removed by sandblasting, shot -
blasting, mechanical scarification, or suitable chemical means.
If surface deterioration presents an unacceptably rough sur-
face, Kem Cati -Coat HS Epoxy Filler /Sealer Is recommended
to patch and resurface damaged concrete.
Fill all cracks, voids and bugholes with ArmorSeal Crack Filler.
Always follow the ASTM methods listed below:
ASTM D4258 Standard Practice for Cleaning Concrete.
ASTM 04259 Standard Practice for Abrading Concrete.
ASTM D4260 Standard Practice tor Etching Concrete.
ASTM D4263 Plastic Sheet Method for Checking Moisture in
Concrete.
N BULLETIN
Revised 1/97
Temperature:
Relative humidity. 85% maximum
45 °F minimum, 100 °F maximum
(air, surface, and material)
At least 5° above dew point
The following is a guide. Changes In pressures and hp sizes
may be needed for proper spray characteristics. Always purge
spray equpment before use with listed reducer. Any reduction
must be compatible with the existing environmental and appli-
cation conditions.
Reducer /Clean Up Reducer *145, R7K145
Airless Spray
Pump 30:1
Hose 3/8' ID
Tip 019' - .023'
Reduction as needed up to 12Ya% by volume
Brush
Brush Natural Bristle
Reduction as needed up to 121% by volume
Roller
Cover 318 -1/2' woven with phenolic core
Reduction as needed up to 121/2 by volume
Squeegee
Reduction as needed up to 121% by volume
If specific application equipment is listed above, equivalent
equipment may be substituted.
continued on back
^00 al
Uo / Ai/ y0 14:40 'Ca - Clo ado()
(Neje. Name:
City of Round Rock Water System improvements
Contract No.1 Elevated Water Storage Reservoirs
Praieet o - ner: City of Round Rock
HoR Prpicct No 07225- 036- 036 -01
Contractor:
Landmark Structures, Inc.
Attention:
The following change in the contract on this project is proposed.
• A breakdown of cost SHALL be attached.
• work shall not commence until authorized by the Owner. — - -- -
Description of the Proposed Change:.
Provide all labor, materials, and equipment to add or delete the Work identified below. Provide proposal
identifying costs associated with labor and materials separated with Contractor's Overhead and Profit for
the Work denoted separately as well.
1. Delete all HMAC paving'associated with the site plan for the Chisholm Valley elevated tank. Provide
only surface preparation and flexible base course installed nd compel d:r the specifications.
All work shall be in accordance with the terms, stipulations. and
conditions of the original Contract Documents. If the work herein
provided for is Approved by Change Order, the time of completion
will be:
incricapdd Decreased Y Unchenoad
by calendar days.
This change will: Add Deduct _ Not Cnen30
5 o 3(0
General Contractor
FOAM 11)4010.5 (Pm 90)
Cepydyat leaf HUB Entineering. Ere.
rUDLIt. 11Ultn3
OWnci a Praiem No. or epaceeolel: NIA
RcOulatory AAe■y Prelcc No - (u epo0caofer: N/A
nirieua Sy:
X Engineer Convecror
HDR Recommendation:
end d
Ac eptpnce
By; F100 Engin . na
1 (i 4) 1/,
Date
owDCi s Action:
_ Accepted
J
Br Owner
Task 5010
Change Proposal
Request No.6
(Not a Change Order)
i Oou: 5125199
mmend
111.501
Xv3 SC:60 IAA 66/91/00
RESOLUTION NO. R- 99- 07- 08 -10C2
WHEREAS, the City of Round Rock has previously entered into a
contract ( "Contract ") with Landmark Structures, Inc. for improvements
to the Chisholm Valley elevated tank, and
WHEREAS, it has been determined that it is necessary to change
said Contract in accordance with the attached Contract Change Order No.
2, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Contract Change Order No. 2 to the Contract with
Landmark Structures, Inc. for improvements to the Chisholm Valley
elevated tank.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended, and the Act.
RESOLVED
ATTEST:
� a./YVV ti G7 ""v ' `^o L-
K. \WPOOCS \RESOLUTI\R90708C2. WPD /s =y
this 8th day of July, 1999.
E LAND, City Secretary
R' A. STLUKA, Q}t., Mayor
City of Round Rock, Texas
CPR No.
Item and Description of Changes
Contract Price
Contract Time
Decrease
Increase
Decrease
Increase
4
Provide modifications to overflow structure at
Chisholm Valley elevated tank.
0
0
0
0
5
Provide anti - graffiti coating at base of each elevated
tank.
0
11,794.00
0
5
6
Delete remaining HMAC paving at Chisholm Valley
elevated tank site.
1,630.00
0
0
0
Sub •Total
Difference Net
1,630.00
11,794.00
0
5
10,164.00
5
Project Name:
City of Round Rock Water System Improvements
Contract No. 1 — Elevated Water Storage Reservoirs
Project Owner: (Name, Address)
City of Round Rock, Texas
2008 Enterprise Dr.
Round Rock, Texas 78664
Project Contractor: (Name, Address]
Landmark Structures, Inc.
1665 Harmon Road
Fort Worth, Texas 76177
It is agreed to modify the Contract referred to above as follows:
Summary: It is agreed to modify the Contract referred to above as follows:
Contract Price prior to this Change Order
1 52,709,673.00
Net Increase (decrease) of this Change Order
1 610,164.00
Revised Contract Price with all approved Change Orders
1 52,71 9,837.00
Distribution:
FORM 111 - 5020 -2 (Version 1.0 Oc: 90)
Copyright 1991 HDR Engineering, Inc.
9 (HDR Engineering, Inc.)
Task 5020
HDR Project No.:
07225 036 - 036 - 02
Owner's Project No.:
N/A
Date of Issuance: June 22, 1999
Date of Contract: December 10, 1998
Contract Period, 480 Days
Change Order No. 2
Contract Time prior to this Change Order
1 February 9, 2000 (480 days)
Net Increase (decrease) of this Change Order
1 5 days
Revised Contract Time with all approved Change Orders
1 February 14, 2000 (485 days)
The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions of the
original Contract as though included therein.
Accepted or Contractor by: -
4 / 2. 091
Date
— zz -9y
Date
111- 5020 -2
1
1
1
1
1
14: 415 Yl - 01O 0000
rUVLlt, IYV19t5J
Project Name:
City of Round Rock Water System Improvements
Contract No.1 Elevated Water Storage Reservoirs
Project Owner: City of Round Rock
9011 Project on 07225 - 03 6- 036 -01
Contractor:
Landmark Structures, Inc.
Attention:
The following change in the contract on this project is proposed.
• A breakdown of cost SHALL be attached.
• Work shall not commence until authorized by the Owner.
Description of the Proposed Change:
Provide all labor, materials, and equipment to add or delete the Work identified below. Provide proposal
identifying costs associated with labor and materials separated with Contractor's Overhead and Profit for
the Work denoted separately as well.
1. For the Chisholm Valley site, replace Detail 1 and Secti A as s
1 and Section A as shown on the attached Figure 1.
All work shall be in accordance with the terms, stipulations. and
conditions of the original Contract Documents. If the work herein
provided for is Approved by Change Order, the time of completion
will be:
_ Increased _ Decreased Y. Unchanged
by (5 calendar days.
This change will: _ Add _ Deduct Not Change
1
0.0o
9�7• elry� yl1:
al Contractor or
FORM III - 5010 -3 (Jon 90)
Copyright 1991 1-1130 Enginecring. Inc.
Owner's Project No. lit applicable): N/A
Regulatory Agency Project No. lit epplicablel: N/A
Initiated by: (Date: 04/20/99
X Engineer Contractor
B
Task 5010
NOR Recommendation:
Owrys Action:
Accepted
By: Owner
Dale (p ( kg
lt/JUUZ /004
Change Proposal
Request No.4
(Not a Change Order)
Plan Sheet 3P03 with Detail
111 - 5010 -3
May 11, 1999
Sent via Facsimile (512) 912 -5166
Original to Follow in Mail.
HDR Engineering
2211 S. IH -35, Suite 300
Austin, Texas 78741
Attn: Mr. Brad Castleberry
Re: Water System Improvements
Contract No. 1 — Elevated Water Storage Reservoirs
City of Round Rock, Texas
Dear Sir:
Per your request after reviewing Change Proposal Request No, 4, I find that there will be
no cost or credit applied to this CPR.
Yours very truly,
LANDMARK STRUCTURES, INC.
Gary Moravits
Project Manager
/cm
Design Innovation . Construction. Excellence
LANDMARK
1665 Harmon Road
Fort Worth, Texas
U.S.A. 76177
Tel: (817) 439 -8888
Fax: (817) 439 -9001
2' SCH. 80
PVC DRAIN-
L_
2• SCH. 80
PVC DRAIN
RECRADE AND
REVECETATE
yi-em/
HDR Engineering, Inc.
18' Du RCP. P:STALL
GRADE AND P n T1
—
END FOR CONNECTOR I II
TD BE LURE BY OTHERS �1 I
JU O
0008
DISCHARGE STRUCTURE DETAIL I rTh
I
SCALE 3003
1/4• - 1' -0"
000111ON, STEEL AT
OPENING. SEE OETUL
INSTALL PIPE BELL
END FLUSH W1TH
TOP OF SLAB
6 NW_ COMPACTED
S
GRANU LL
EMU
PROVIDE 12 GAUGE
SST MESH ROOMY
SCREEN BETWEEN FIANCES
I.E. 040.00
12' -0
CHISHOLM VALLEY
DISCHARGE STRUCTURE
3003
3003
16' FLAP VALVE
R5 BARS AT 10
O.C. E.W. (TYP)
16 FLuRxMJ
WALL PIPE
I8 DA... ASTM C26
GASHETED RCP BY
HANS05 OR EOUAL
DISCHARGE STRUCTURE SECTION
SCALE: /4 - 1' -0" 3003
300'
12"
° 0 0 0 0 0
OL
— ADDITIONAL STEEL AT
OPENING. SEE DETAIL
(F-12- THICK
ELM
3/4 CHw1ER (1Y0.
ALL ELYROSE0 CORNERS)
16' OVERFLOW/
DRVN PIPE
CITY OF ROUND ROCK, TEXAS
CONTRACT NO. 1, ELEV. WATER STORAGE RESERVOIRS
TOP OF SLAB
3003
3003
CL ELEV. = 847.50
HIGH PT. - 846.25
TOP OF SLAB
LOW PT. = 846.15
Dole
04/20/99
1g e
1
1
NEEnw R -4040 SERIES
OR APPROVED ECU,
1
I
I
1 n I 44
I I
II
I
FLAP
VALVE
rl
1 /(:1
I
I
I
I
I
wµLFPIP( W
15
RESTRAINED n
JOINT
16 OVERFLOW /
DRAIN MIRE
LIGHT DU, RATE, ■
∎
I� C
° FLOOR
DRAM uvE
Is
SIZED TO FIT BELL END
OF 18 Du. RCP T1■ ■
�
�� .7
Fr 00*40
r u
II C7 * .f. =
I
a' FL4F1.414-1
WALL PIPE
2' SCH. 80
PVC DRAIN-
L_
2• SCH. 80
PVC DRAIN
RECRADE AND
REVECETATE
yi-em/
HDR Engineering, Inc.
18' Du RCP. P:STALL
GRADE AND P n T1
—
END FOR CONNECTOR I II
TD BE LURE BY OTHERS �1 I
JU O
0008
DISCHARGE STRUCTURE DETAIL I rTh
I
SCALE 3003
1/4• - 1' -0"
000111ON, STEEL AT
OPENING. SEE OETUL
INSTALL PIPE BELL
END FLUSH W1TH
TOP OF SLAB
6 NW_ COMPACTED
S
GRANU LL
EMU
PROVIDE 12 GAUGE
SST MESH ROOMY
SCREEN BETWEEN FIANCES
I.E. 040.00
12' -0
CHISHOLM VALLEY
DISCHARGE STRUCTURE
3003
3003
16' FLAP VALVE
R5 BARS AT 10
O.C. E.W. (TYP)
16 FLuRxMJ
WALL PIPE
I8 DA... ASTM C26
GASHETED RCP BY
HANS05 OR EOUAL
DISCHARGE STRUCTURE SECTION
SCALE: /4 - 1' -0" 3003
300'
12"
° 0 0 0 0 0
OL
— ADDITIONAL STEEL AT
OPENING. SEE DETAIL
(F-12- THICK
ELM
3/4 CHw1ER (1Y0.
ALL ELYROSE0 CORNERS)
16' OVERFLOW/
DRVN PIPE
CITY OF ROUND ROCK, TEXAS
CONTRACT NO. 1, ELEV. WATER STORAGE RESERVOIRS
TOP OF SLAB
3003
3003
CL ELEV. = 847.50
HIGH PT. - 846.25
TOP OF SLAB
LOW PT. = 846.15
Dole
04/20/99
1g e
1
Contractor:
"Da
Landmark Structures, Inc.
Attention:
The following change in the contract on this project is proposed.
• A breakdown of cost SHALL be attached.
• Work shall not commence until authorized by the Owner.
Description of the Proposed Change:
CUD, 1 1101h.
Owner's Project No. (if applicable': N/A
Regulatory Agency Project No. Of applicable): N/A
Initiated by:(PRiVATE
X Engineer Contractor
Change Proposal
Request No.5
(Not a Change Order)
{PRIVATE )Project Name:
City of Round Rock Water System Improvements
Contract No.1 Elevated Water Storage Reservoirs
Project owner: City of Round Rock
HOR Project No.: 07225- 036 - 036 -01
IDele: 4119/99
Provide all labor, materials, and equipment to add or delete the Work identified below. Provide proposal
identifying costs associated with labor and materials separated with Contractor's Overhead and Profit for
the Work denoted separately as well.
t. Provide a protective "anti- graffiti" coating to be applied as a clear coat on the bottom 15 -feet around
the circumference of the concrete base of each elevated water tank. Coating to be applied on all
concrete and ferrous surfaces. The coating shall be Sherwin Williams product SWD VOC Aliphatic
Urethane B65WJ Series as indicated on the attached material product sheet. Application shall be
such that the product is placed in two (2) coats, with each coat bei 1.5- its DFT or being applied
at a rate of lgal /200 -sf.
All work shall be in accordance with the terms, stipulations, and
conditions of the original Contract Documents. If the work herein
provided for is Approved by Change Order, the time of completion
will be:
by � calendar days.
This change will:° Add Deduct Not Change
Gn Comrayw v `ct )` S
1 000 SO -11
7 T_cr (—av1 C
FORM 10- 5010 -3 (Jun 90)
Copyright 1991 HDR Fsginccring, Inc.
k ( " *T-.
ray
MR Recommendation:
/ Recom'
Accepta ce
By: HOR ginee g, 1 .
Date
Owner's Action:
(ce pled
r�alwY (1 rt.,. irci
,Date
at Recommend
anea
1
NopV�Cepted
II I..
t(JUVJ /004
Task 5010 111-500-3
May 20, 1999
Sent via Facsimile (512) 912 -5166
Original to Follow in Mail.
HDR Engineering
2211 S. IH -35, Suite 300
Austin, Texas 78741
Attn: Mr. Brad Castleberry
Re: Water System Improvements
Contract No. 1 — Elevated Water Storage Reservoirs
City of Round Rock, Texas
Dear Sir:
LAN ID MAR K
Per your request, I am providing a breakdown of costs related to Change Proposal
Request No. 5.
The total area to be covered is approximately 2015 square foot based on a coverage
height of 15 foot above grade. I have spoken with Mr. Bob Bridendolph of Sherwin
Williams in order to get the pricing and coverage per gallon. The quantities below are
based on the information from Bob.
Urethane (B65WJ) 18 Gallons at $39.00 /Gallon (2 coats) 702.00
Block Filler (Kem Cati -Coat HS) 30 Gallons at $21.00 /Gallon 630.00
Labor to Install $2.00 /Sq. Ft. 4,030.00
OH & P 10% 535.00
5,897.00
Total Cost CPR No. 5for both tanks $11,794.00
Landmark does not recommend using Anti - Graffiti Coatings, because we found that it
will discolor the concrete. Epoxy Block Filler will be "off- white" and this will not match the
concrete.
We recommend to leave the blasted concrete finish for one year and after that time
determine if an anti - graffiti coating is necessary. Another consideration prior to applying
a coating to the pedestal is that you will create an additional maintenance requirement.
We know of only one of our tank pedestals that has been used by a graffiti artist after
construction was complete; the graffiti in this case was removed by a light sandblast.
Please let me know if you need any additional information on these items.
Yours very truly,
LANDMARK STRUCTURES, INC.
Gary Moravits
Project Manager
/cm
attachment
Design Innova5on • Construction Excellence
1665 Harmon Road
Fort Worth, Texas
U.S.A. 76177
Tel: (817) 439 -8888
Fax: (817) 439 -9001
'.J
J
v
t L
j� C.d0r, WN. o Otter Pxk.a✓fmted Colors
� °� A Clear
0
tJ
2
RPR - 14 -1999 09
5A01
SWD
VOC ALIPHATIC URETHANE
B65WJ SERIES
CHABACCERISIICS
A Ma corpora polyttredtane !K err an
properly primed and/ee properly pained
meet and tewo.vy metres. May 1M +POW
ante epoxy and undue* coat/bp. The Clear
erston 1. formula red with Odin e41itlsrs
or exterior durability.
Tlddc 90. Thin (1 60 Degou
Coverage: 300 Spurt Feet per Gallon
.'� 1.6 mllseel /2.0 lass 4ty
Drying Moe
($SO%RH&
To Tomb: 30 .porter
To Ransom 11 Kees
P141 Curt: 10 Days
Vehklee Aliphatic Urethan.
Volume Solids: 55.0% *1. Z% (Catalysed)
Thelma Use only 044 Colorants
weight per Gallon: 10.6 tie. per gallon
V OC 324 Mb per .,,_t 10 00 wane per bee
Reducer:
Below 60 elf: Cylo1
Above 00 df: RIK111
PFC1F1CATIONS
May be applied Wet properly primed
~feces. Somme auseesred yens. ace
tut Miaow
Sundt
1 Cone Rccontable Epory, 067 Seri.
2 Conn SWD VOC Aliphatic Urethane
OR
1 Cost Arc Clad. B60 Series
2 Co. SWD VOC Miphade Ur.thww
Mwp7:
1 Co.1 Epooy Ester M.•mvy FEW
2 Coate SWD VOC Anginadt Dr,.
SURFACE PRFP *RATION
Surface and aabtett temperatures nowt be
ako.e
50 Deere. all the date of
eppbcador.
BLOCK. CINDER, AND CoNCRPTE -
LYTERIOR OR INTERIOR. Surface.
000.1 be free nor din. I. or teems
sooner, and dreo0d4y dry, Paatlm6 with
• Wen peat any proceed in 10 dike.
. Riker normal trying eon.i0o..a
Rater.,.. 5.w 1.
GALVANIZED METAL SURFACES -
Anew la weather • aaoinYn of As (6)
comb prior b coating. Solvent dean
per SSPCSPI. dw1 prim. as rsa0irwl.
When weathering is new possible .r Oat
.utmeg lw been notated with chromasn
or p1{calm, Rest whew dean per
9SPC-SP1 owd apply • ten area prating
so t.g/0(P4 Nee punt to dry one week
before ketu•0. If .dfrdon le poor, brtrk
blaming la re asary as reamer dtae
Q'0I 01 . Rakrenee SW to.
PREVIOUSLY COATED SURFACES
Ali erase contark..d.* suds as o1C
crw tar.. palm..ill meta. dirt,
ford0t miner. io.ti 10041 redden.
morose. coin...,.. and staler. .rust be
retw.d to .sere • sound hoadlht to the
dd.dy alhring 041 paint (:loamy
rarroo= of aid pain film amt he clean
and dope before .epain0115 Spa( Prime
litre area 01!10 the sppropri.te primer.
Llrek for coep.6bllity of the pee0laualy
palatal surf to with the tree comma( by
•pN0Ung • tat area Recognise drat any
eerfsee preparation sheen of eta1 reeacend
or .14 .eadng .tatty coloprotelse the
Denier ]carett of the system. Refere.or
SW 11.
9?%
VOCPOLV MM4 01200
5.401
SWD
VOC ALIPHATIC URETHANE
B65WJ SERIES
APPUiCATION
M 1 1» applied by break. Pollee or
spray.
AIRLESS SPRAY)
Pinny Retie:
Tip Sire:
yhdd Premiere:
Falter Screen:
Jo:1
011 -.015
1500. 1600 PSI
100 numb
CONVfNT1ONAL SPRAY:
Cern Redo It
TlpMeodke: 63063A
Air Cap: 67PS
AIr Premtar: 60-70 PSI
Field Premiere: 15 -20 P51
CLEALYMIS ORJAT[ON
6.1eaa mob aid villa 1stnce atdy
ell* MtIK nutty *tome. Fella•
earanractur n bl/traetlota .hem Wog
MEK or ocher odeen4
S PF.(, !Ii INSTRUCTIONS
All Cpatda W aro:kee n '.toils twee
exceeded the maximum recoils time suet be.
mechanically abraded prior so applrinv
.aditiohel C0.tin1,
MTXTNG INSTRITCTIONS:
M18a 4 parrs 6w Competent with 1 pert
860 V2 Convener by velum.- Mir
veil and allow 5 slMlra bdac0on dam
`prior to apptltaton. Redact wing the
app.opri.l yducrt as rerratret
Pot tire: 6 Hour. fy 75 degree,
(AI rrroNs
Do net apply blow SOF er sieve 120F.
T?etod free. freetlnL
See 1.bd for neat Yons Cautions_
Use only with sdeyurte venul•Rnn •td
wear OSHA approved tapir•sary
yrntec00n
Ise not apply If humial tr is lbw 1514
SM19 104 f1NMATTQPj
865WJ1000 -L6 6402_16304
665W.11000 -19 6015 -10552
B65CJ1000 -16 6015 -10064
B65CJ1000 -19 6015. 10936
96501000 -27 6015.10720
Vt7CPOlY W 4 OS79/90
TOTRL F.93
May 18, 1999 8:40 AM From: Bob Bridendolph Fax #: (512) 238 -7032 Page 2 of 5
Industrial and Marine
Coatings
KEM CATI -COAT HS EPDXY FILLER/SEALER is a high
performance. interior /exterior, VOC compliant, epoxy block
filler. Designed for tenacious adhesion to masonry substrates
while filling voids and crevices to smooth the surface. Excel-
lent resistance to moisture, humidity, impact, and abrasion.
• Suitable for use in USDA inspected facilities
• Chemical resistant
• Long pot life
• Resurfaces spatted and deteriorated concrete
Finish:
Color:
Volume Solids:
Weight Solids:
Flat
Off White
72% ± 2%, mixed
84% ± 2%, mixed
PRODUCT IN
VOC (EPA Method 24): Unreduced: 184g/L. 1.501b /gal
mixed Reduced 1214%:305 g/L; 2.54 lb/gal
Mix Ratio: 2 components, 1:1 by volume
Recommended Spreading Rate per coat:
Wet mils: 14.0 - 28.0
Dry mils: 10.0 - 20.0
Coverage: 60 - 115 sq ft/gal approximate
Spreading rale dependent on surface profile and porosity.
NOTE: Brush or roll application may require multyle coals to achieve
maximum f ilm thickness and un fortuity of appearance.
Drying Schedule 0 15.0 mils wet @ 50% RH:
@ 77 °F
To touch: 1 -3 hours
To recoat: minimum: 18 hours
maximum: - 30 days
N maximum recast time is exceeded, abrade surface before recasting.
Drying time is temperature, humidity, and film thickness dependent.
Pot Life: 8 hours @ 77 °F, 50% RH
Sweat -In -time: 30 minutes @ 77 °F, 50% RH
Shell Lite: 12 months. unopened, at 77°F
Flash Point 103 °F, PMCC, mixed
Reducer /Clean Up: Reducer 6145, R7K145
FORMATION
For use over prepared concrete and masonry surfaces, in
areas such as:
Secondary containment
Chemical plants
Power plants
Tunnels
Schools
Prisons
Equipment foundations
System Tested: (unless otherwise indicated)
Substrate: Concrete
Surface Preparation: Clean, dry, sound
Finish: 1 ct. Kern Cati -Coat HS @ 15.0 mils dft
Adhesion:
Method: ASTM 03359. Method B
Resu tt: 5B, 100% retention
Flame Spread Rating:
Method: ASTM E -84 Tunnel Test
Result: Class A on noncombustible surfaces
Direct Impact Resistance:
Method: TTC -555B, 4.4.4
Result: Minimum resistance at 6 in. lbs.
Freeze/Thaw:
Method: ASTM 02246. 20 cycles
Result: Passes
Dry Heat Resistance:
Method: ASTM 02485
Result: 250 ° F, 275 °F intermittent
Flexibility (cold rolled steel):
Method: TTC-555B, 4.4.3, 1° mandrel
Result: Passes
Humidity Resistance:
Method: ASTM 02247, 100 °F, 1000 hours
Result: Passes, no blistering or loss of adhesion
Wind Driven Rain:
Method: TTC -5558, 4.4.7
Result: Passes
Revised 1/97
Epoxy coatings may darken or yellow following application
and curing.
Epoxy
4.21 2004553
PAITT A
PART B
4.21
KEM CATI -COAL® HS
EPDXY FILLER/SEALER
B42W400 0'
'
B42V401 t iDENER
continued on back
May 18,1999 8:40 AM From: Bob Bridendolph
ILU
Industrial and Marine
Coatings
Fax #: (512) 238 -7032 Page 3 of 5
PART A
PART B
4.21
KEM CATI-COA1® HS
EPDXY FILLER/SEALER
B42W400 Q WHITE
642V401 WIDENER
PRODUCT INFORMATION
Concrete/Masonry:
1 -2 cts. Kem Cati -Coat HS Epoxy Filler /Sealer V7 10.0 -20.0
mils dlUct as required to fill voids and provide a
continuous substrate.
1 -2 cts. Recommended topcoat
Recommended Topcoats:
Water Based Catalyzed Epoxy
Sher -Tile HS Epoxy
Armor -Tile 1 Polyester Epoxy
Macropoxy HS Epoxy
Hi- Solids Polyurethane
Corothane 0 Polyurethane
DTM Acrylic Coating
Refer to the MSCS sheet before use.
Publisned technical data and instructions are subject 10 change
The systems listed above are representative of the product's without notice. Contact your Sherwin- Williams representative
use. Other systems may be appropriate. for additional technical data and instructions.
Surface must be clean, dry, and in sound condition. Remove
all oil, dust, grease, dirt, loose rust, and other foreign material
to ensure adequate adhesion.
Refer to product Application Bulletin for detailed surface prepa-
ration information.
Minimum recommended surface preparation:
Concrete /Masonry: Cured, clean, dry. sound
Do not tint.
Color; Off White
Temperature:
Relative humidity.
45 ° F minimum, 100 °F maximum
(air, surface, and material)
At least 5 °F above dew point
85% maximum
Refer to product Application Bulletin for detailed application
information.
Packaging:
Part A:
Part B:
Weight per gallon:
5 gallon containers
5 gallon containers
13.4 z 0.2 lb mixed
May 18, 1999 8:40 AM
Industrial and Marine
Coatings
Epoxy
From: Bob Bridendolph Fax 5: (512) 238 -7032 Page 4 of 5
4.21A 2004553A
PART A
PART B
4.21 A
KEM CATI-COA1® HS
EPDXY FILLER/SEALER
B42W400 Q WHITE
B42V401 WRDENER
APPLICATIO
Surface must be clean, dry, and in sound condition. Remove
all oil, dust, grease, dirt, loose rust. and other foreign material
to ensure adequate adhesion.
Masonry and Block
Surfaces should be thoroughly clean and dry- Concrete and
mortar must be cured at least 28 days ® 75 °F. Remove all
loose mortar and foreign material. Surface must be free of
laitance, concrete dust. dirt, form release agents, moisture cur-
ing membranes, loose cement and hardeners.
Poured Concrete
New
Surface must be clean, dry, sound, and offer sufficient profile
to achieve adequate adhesion. Minimum substrate cure is 28
days at 75 °F. Remove all form release agents, curing com-
pounds, salts. efflorescence. laitance, and other foreign mat-
ter by sandblasting, shotblasting, mechanical scarification, or
suitable chemical means, such as muriatic acid etch, refer to
ASTM D4260. Rinse thoroughly to achieve a final pH between
6.0 and 10.0. Allow to dry thoroughly prior to coating.
Old
Surface preparation is done in much the same manner as new
concrete; however, if the concrete is contaminated with oils,
grease, chemicals, etc -, they must be removed by cleaning
with a strong detergent. Refer to ASTM D4258. Form release
agents. hardeners. etc. must be removed by sandblasting, shot -
blasting, mechanical scarification, or suitable chemical means.
If surface deterioration presents an unacceptably rough sur-
face, Kem Cati -Coat HS Epoxy Filler /Sealer is recommended
to patch and resurface damaged concrete.
Fill all cracks. voids and bugholes with ArmorSeal Crack Filler.
Always follow the ASTM methods listed below:
ASTM 04258 Standard Practice for Cleaning Concrete.
ASTM D4259 Standard Practice for Abrading Concrete.
ASTM D4260 Standard Practice for Etching Concrete.
ASTM D4263 Plastic Sheet Method for Checking Moisture in
Concrete.
N BULLETIN
Temperature:
Relative humidity 85% maximum
45 °F minimum, 100 °F maximum
(air. surface, and material)
At least 5° above dew point
The following is a guide. Changes in pressures and hp sizes
may be needed for proper spray characteristics. Always purge
spray equipment before use with listed reducer. Any reduction
must be compatible with the existing environmental and appli-
cation conditions.
ReducedClean Op Reducer #145. R7K145
Revised 1/97
Airless Spray
Pump 30:1
Hose 3/8' ID
Tip 019' - .023'
Reduction as needed up to 12k% by volume
Brush
Brush Natural Bristle
Reduction as needed up to 1216% by volume
Roller
Cover 3/8 -1/2' woven with phenolic core
Reduction as needed up to 125% by volume
Squeegee
Reduction as needed up to 12'5% by volume
If specific application equipment is listed above, equivalent
equipment may be substituted.
continued on back
May 18,1999 8:40 AM From: Bob Bridendolph
Industrial and Marine
Coatings
Fax #: (512) 238 -7032 Page 5 of 5
PART A B42W400
PART B B42V401
N BULLETIN
4.21 A
KEIVI CATI -COAT° HS
EPDXY FILLER/SEALER
CP WHITE
HRDENER
APPLICATIO
Surface preparation most be completed as indicated.
Mixing Instructions: Mix contents of each component thor-
oughly with power agitation. Make certain no pigment remains
on bottom of can. Then combine 1 part by volume of part A
with 1 part by volume of Part B. Thoroughly agitate the mix-
ture. Allow material to sweat -in as indicated. Re -stir before
using.
If reducer solvent is used, add only after both components
have been thoroughly mixed, after sweat -in.
Apply paint to the recommended film thickness and spreading
rate as indicated below:
Recommended Spreading Rate per coat:
Wet mils: 14.0 - 28.0
Dry mils; 10.0 - 20.0
Coverage; 60 - 115 sq ft/gal approximate
Spreading rate dependent on surface profile and porosity.
Drying Schedule ® 15.0 mils wet @ 50% RH:
77 °F
To touch: 1 -3 hours
To recoat; minimum: 18 hours
maximum: 30 days
ff maximum recoat time is exceeded, abrade surfacebefore recoating.
Drying time Is temperature, humidity, and film thickness dependent
Pot Life: 8 hours ® 77°F, 50% RH
Sweat- in-time: 30 minutes ® 77°F, 50% RH
Application of coating above maximum or below minimum rec-
ommended spreading rate may adversely affect coating per-
formance.
Clean spills and spatters immediately with Reducer 4145.
R7K145. Clean tools immediately after use with Reducer 8145,
R7K145. Follow manufacturers safety recommendations when
using any solvent.
When using spray application, use a 50% overlap with each
pass of the gun to avoid holidays, bare areas, and pinholes. If
necessary, cross spray at a right angle.
Spreading rates are calculated on volume solids and do not
include an application Icss factor due to surface profile, rough-
ness or porosity of the surface, skill and technique of the ap-
plicator, method of application, various surface irregularities,
material lost during mixing, spillage, overthinning, climaticcon-
ditions, and excessive film build.
Excessive reduction of material can affect film build, appear-
ance, and adhesion.
Do not apply the material beyond recommended pot life.
Do not mix previously catalyzed material with new.
Depending on condition of substrate, more than one mat may
be required.
Do not apply under 50 sq ft/gal or mudcracking may occur.
Not recommended for previously painted surfaces.
Temperatures above 77'F will shorten pot life.
For best results, apply by airless spray and immediately back
roll.
Do not apply over moisture, or below 45 °F.
Refer to Product Information sheet for additional performance
characteristics and properties.
Refer to the MSDS sheer before use.
Published technical data and instructions are subject to change
without notice. Contact your Sherwin- Williams representative
for additional technical data and instructions.
06/21/99 14:49
COO DI
Project Nbme:
City of Round Rock Water System Improvements
Contract No.1 Elevated Water Storage Reservoirs
Fraiect o -no, City of Round Rock
Hop prvRct No.: 07225-036-036-01
COntract0
Landmark Structures, Inc.
Attention:
The following change in the contract on this project is proposed.
A breakdown of cost SHALL be attached.
- work shall not commence until authorized by the Owner.
Description of the Proposed Change:
Provide atl labor, materials, and equipment to add or delete the Work identified below. Provide proposal
identifying costs associated with labor and materials separated with Contractor's Overhead and Profit for
the Work denoted separately as well. -
1. Delete all HMAC paving associated with the site plan for the Chisholm Valley elevated tank. Provide
only surface preparation and flexible base course installed . nd comps d Air the specifications.
All work shall be in accordance with the terms, stipulations, and
conditions of the original Contract Documents. If the work herein
provided for is Approved by Change Order, the time of completion
will be:
lncretted _ Decrev00d Uncna ^gad
by calendar days.
This change will: _ ado r:30e0d0l - NO1 Cnangc
MgnaralCo tre
001c
FOAM 111 - 5010_] (Jun 901
Cvpyri3hl Ip91 Hbk Enrineerag. bra.
p Z13 bbb;1
rLIjLbt IlU1(1'0
o.•nei a proie0' No. N sopli003'0i N/A
IfI JUU4/ UU4
Change Proposal
Request No.6
(Not a Change Order)
egulatery Agency Projcet N0- 111 aeeliceblel: NIA
klat°O or iouc: 5125199
X Engi^ea■ Contractor
6
HOR Recommendation:
mnmend
end d
c apt nc
By: HMO Engin
r ^ l g. 199
oat
Mate
Task 5010
, O / )ner's Action:
Accepted _Not :.cce
� - {)VA ,
6y: Owner
111.5010 -3
XV3 SCI6D IHA 66 /BT /90
June 3, 1999
Sent via Facsimile (512) 912 -5166
Original to follow by mail.
HDR Engineering
2211 S. IH -35, Suite 300
Austin, Texas 78741
Attn: Mr. Brad Castleberry
Re: Water System Improvements
Contract No 1 — Elevated Water Storage Reservoirs
City of Round Rock, Texas
Dear Sir:
Per your request, we have compiled a proposal for deleting the HMAC Paving at the Chisholm
Valley Site, per Change Proposal Request No. 6. In Change Proposal Request No 1, Item #2,
there was 25 If. of HMAC deleted leaving approximately 135 If. x 15 If. remaining (2025 sf.). A
credit of $1,630.00 will be issued for this Change Proposal Request.
If there are any questions, please contact me.
Yours very truly,
LANDMARK STRUCTURES, INC.
Gary Moravits
Project Manager
/cm
attachment
Design Innovation Construction Excellence
LANDMARK
1665 Harmon Road
Fort Worth, Texas
U.S.A. 76177
Tel: (817) 439 -8888
Fax: (817) 439 -9001
DATE: July 2, 1999
SUBJECT: City Council Meeting — July 8, 1999
ITEM: 10.C.2. Consider a resolution authorizing the Mayor to execute Change Order
No. 2 for the new Chisholm Valley Elevated Standpipe. Changes
include the modification of the tank overflow outfall structure and
adding a protective coating on the outside of the tank for future ease of
cleaning and the deletion of paving inside the tank site since TU Electric
is planning further construction near the tank. The total increase is