Loading...
R-99-07-08-10C5 - 7/8/1999 RESOLUTION NO. R-99-07-08-1005 WHEREAS, the City of Round Rock has duly advertised for bids for the construction of the Sam Bass Road curve realignment, and WHEREAS, Austin Bridge and Road has submitted the lowest and best bid, and WHEREAS, the City Council wishes to accept the bid of Austin Bridge and Road, Now Therefore, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Austin Bridge and Road for the construction of the Sam Bass Road curve realignment. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 8th day of July, 1999. 1° RO A. STLUKA, J Mayor AT EST: � City of Round Rock, Texas J E LAND, City Secretary K:\WPDOCS\RESOD l\R907OBC5.WPD/.c THE CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED PUBLIC WORKS DEPARTMENT 2008 Enterprise Dr. BY; Billy Ortiz Round Rock, Texas. 78664 DATE: 6/16199 (512)218-5555 BID TABULATION SHEET 1 OF 1 CONTRACT: Sam Bass Road Curve Realignment LOCATION: Sam Bass Road RGM Constructors,L.P. Austin Bridge&Road DATE: June 15,1999 Bid Bond?Yes Bid Bond?No Bid Bond?Yes APPROX UNIT UNIT UNIT ITEM UNIT QTY. PRICE COST PRICE COST PRICE COST Preparation Remove Concrete Excavation(Street) T'Excavation(Natural groan T.-Flex Base Nlilling Hot Asphaltic Hot Mix Asphaltic Concrete ype on 8.Hot NUx Asphaltic Concrete ype on 9.Concrete Curb&uutter thick oncrete siciewaix Concrete Sidewalk Ramps ncrete nveway Aprons Waterline Relocation Waterline Relocation Water Service Connection 53,9007 511,700.00 —STMnT--WTww W.Wet Connection, x Tee Gate Valve Gate Valve Fire Hydrant Assembly w Valve&Lead 0. evegetation Silt Fence c Control Devices(Barricades,Signs, Traffic HandIing,etc. Pavement rig;Paiint (Yellow) ermop as is Pavement Markings Base Bid Total: $320,687.50 $280,766.70 ALTERNATE BID ITEM ncre e i wa TOTAL: $367,273.90 $320,697.90 bidtab/bidtab y �POP �= Sam Bass Road Curve Realignment DATE: July 2,1999 SUBJECT: City Council Meeting—July 8,1999 ITEM: 10.C.5. Consider a resolution authorizing the Mayor to execute a contract with Austin Bridge and Road for the construction of the Sam Bass Road Curve Realignment The amount of the contract is $280,766.70 Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director.