R-99-07-08-10C5 - 7/8/1999 RESOLUTION NO. R-99-07-08-1005
WHEREAS, the City of Round Rock has duly advertised for bids for
the construction of the Sam Bass Road curve realignment, and
WHEREAS, Austin Bridge and Road has submitted the lowest and best
bid, and
WHEREAS, the City Council wishes to accept the bid of Austin
Bridge and Road, Now Therefore,
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City a contract with Austin Bridge and Road for the
construction of the Sam Bass Road curve realignment.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended, and the Act.
RESOLVED this 8th day of July, 1999.
1°
RO A. STLUKA, J Mayor
AT EST: � City of Round Rock, Texas
J E LAND, City Secretary
K:\WPDOCS\RESOD l\R907OBC5.WPD/.c
THE CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED
PUBLIC WORKS DEPARTMENT
2008 Enterprise Dr. BY; Billy Ortiz
Round Rock, Texas. 78664 DATE: 6/16199
(512)218-5555 BID TABULATION SHEET 1 OF 1
CONTRACT: Sam Bass Road Curve Realignment
LOCATION: Sam Bass Road RGM Constructors,L.P. Austin Bridge&Road
DATE: June 15,1999
Bid Bond?Yes Bid Bond?No Bid Bond?Yes
APPROX UNIT UNIT UNIT
ITEM UNIT QTY. PRICE COST PRICE COST PRICE COST
Preparation
Remove Concrete
Excavation(Street)
T'Excavation(Natural groan
T.-Flex Base
Nlilling Hot Asphaltic
Hot Mix Asphaltic Concrete ype on
8.Hot NUx Asphaltic Concrete ype on
9.Concrete Curb&uutter
thick oncrete siciewaix
Concrete Sidewalk Ramps
ncrete nveway Aprons
Waterline Relocation
Waterline Relocation
Water Service Connection 53,9007 511,700.00 —STMnT--WTww
W.Wet Connection, x Tee
Gate Valve
Gate Valve
Fire Hydrant Assembly w Valve&Lead
0. evegetation
Silt Fence
c Control Devices(Barricades,Signs,
Traffic HandIing,etc.
Pavement rig;Paiint (Yellow)
ermop as is Pavement Markings
Base Bid Total: $320,687.50 $280,766.70
ALTERNATE BID ITEM
ncre e i wa
TOTAL: $367,273.90 $320,697.90
bidtab/bidtab
y
�POP
�= Sam Bass Road Curve Realignment
DATE: July 2,1999
SUBJECT: City Council Meeting—July 8,1999
ITEM: 10.C.5. Consider a resolution authorizing the Mayor to execute a contract
with Austin Bridge and Road for the construction of the Sam Bass
Road Curve Realignment The amount of the contract is $280,766.70
Staff recommends approval. Staff Resource Person: Jim Nuse, Public
Works Director.