Loading...
R-99-08-12-10D2 - 8/12/1999RESOLUTION NO. R- 99- 08- 12 -10D2 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Nelson Lewis, Inc. for the South Creek Waterline Replacement Project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with Nelson Lewis, Inc. for the South Creek Waterline Replacement Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 12th day of August, 1999. ATTEST: NE LAND, City Secretary K: \WPDOCS \RESOLLTI \R90tl.2D2.WPD /Scg RO T A. STLUKA,£ R., Mayor City of Round Rock, Texas CITY OF ROUND CONSTRUCTION CHANGE DEPARTMENT: Public Works ROCK DATA ORDER PAGE 1 OF 1 7/21/99 NO: 2 adjustments PROJECT: Southcreek Waterline Replacements DATE: CHANGE ORDER ORIGINAL CONTRACT PRICE: $318,801.00 JUSTIFICATION: Final quantity PREVIOUS CHANGE ORDERS: $16,700.00 THIS CHANGE ORDER: CHANGE ORDERS TO DATE: CHANGE ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 1 Remove and replace existing long -side water service including street repair EA -20 $1,100.00 ($22,000.00) n/a 1A Remove and replace existing short-side water service EA -5 $700.00 ($3,500.00) n/a 2 Remove and replace concrete curb and gutter LF -150 $10.00 ($1,500.00) n/a 4 Remove and replace concrete sidewalk SF -2000 $3.00 ($6,000.00) n/a 5 Remove and replace concrete driveway SF -1200 $5.00 ($6,000.00) n/a CO1 Remove and replace short side quadruple service EA 1 $1,300.00 $1,300.00 n/a PREPARED BY: Alysha Girard TOTAL: 7/12/99 PERCENT OF ORIGINAL ($ =3 7 +MLOE) n/a CONTRACT PRICE ENGINEERING ASSISTANT CONT' '1, .7 : i N - -on awls, Inc. DATE THIS CHANGE ORDER: - 11.83% PREVIOUS CHANGE ORDER: 5.24% TOTAL % CHANGE: - 6.59% ,. _. ,ate 'For 41,PW ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $297,801.00 TITLE: :. ez,ld- ' � APPROV +: /elk � �7L .. sc co2/southcreek /project specs ' .11P ITY OF R s UND ROC `7 SOUTHCREEK WATERLINE REPLACEMENT PROJECT BY : DATE : Final Payment Tabulation SHEET: Alysha Girard 7/12/99 1 of 1 CONTRACT : SOUTHCREEK WATERLINE REPLACEMENT PROGRAM Nelson Lewis, Inc. Contract Values Actual Work Change Order Values CO #2 Final values TTEM UNIT APPROX. QTY. UNIT PRICE COST QTY. COST QTY. COST QTY. COST 1. Remove and replace existing long -side double water service including street repair. EA 118 $1,100.00 $129,800.00 87 $95,700.00 (20) ($22,000.00) 87 $95,700.00 1A. Remove and replace existing short-side double water service. EA 120 $700.00 $84,000.00 100 $70,000.00 (5) ($3,500.00) 100 $70,000.00 2. Remove and replace concrete curb and gutter. LF 1,500 $10.00 $15,000.00 1,350 $13,500.00 (150) ($1,500.00) 1,350 $13,500.00 4. Remove and replace concrete sidewalk. SF 20,000 $3.00 $60,000.00 18,000.0 $54,000.00 (2,000.0) ($6,000.00) 18,000.0 $54,000.00 5. Remove and replace concrete driveway. SF 6,000 $5.00 $30,000.00 4,800 $24,000.00 (1,200) ($6,000.00) 4,800 $24,000.00 6. Trench safety LS 1 $1.00 $1.00 1 $1.00 0 $0.00 1 $1.00 SUBTOTAL: ^! 1tt.'O '.x +:V $257,201.00 ($39,000.00) ! 8257,201.00 CO1: (1) long -side double water service EA -11 $1,100.00 ($12,100.00) 0 $0.00 0 $0.00 0 $0.00 CO1: (1A) short-side double water service EA -15 $700.00 ($10,500.00) 0 $0.00 0 $0.00 0 $0.00 CO1: Quad long service EA 11 $1,800.00 $19,800.00 11 $19,800.00 0 $0.00 11 t $19,800.00 CO1: Quad short service EA 15 $1,300.00 $19,500.00 16 $20,800.00 1 $1,300.00 16 t $20,800.00 TOTAL: $335,501.00 5297,801.00 $1,300.00 scpayment xis/southcreeklag DATE: August 6, 1999 SUBJECT: City Council Meeting — August 12, 1999 ITEM: 10.D.2. Consider a resolution authorizing the Mayor to execute Change Order No. 2 for the South Creek Waterline Replacement Project. Changes are for the reduction in quantities in preparation for final payment. The majority of reductions occurred in service replacement items. The total reduction is $37,700.00. The current contract amount is $335,501.00. The final amended contract amount is $297,801.00. This project is funded by the "Blue Tubing" Replacement Program. Staff Resource Person: Jim Nuse, Public Works Director.,