R-99-08-12-10D8 - 8/12/1999DATE: October 4, 1999
TO: Christine Martinez
Assistant City Secretary
FROM: Thomas E. Word, Jr., P.E.
Traffic Engineer
Funding Agreement with TxDOT for US 79 Construction Project
R- 99- 08- 12 -10D8
Attached for your files is the executed original of the Funding Agreement with TxDOT for the US
79 construction project from CR 195 to CR 110, and for Harrell Parkway. Please let me know if
you need any other information for this project.
Attachment Funding Agreement
il"
Texas Department of Transportation
CSJ: 0204 -01 -050, 0914 -01 -051
County: Williamson
Highway: US 79, etc.
Limits: 1.5 Mi. E. of FM 1460 to
3.8 Mi, E. of FM 1460
Mr. Thomas E. Word, Jr., P.E.
City Traffic Engineer
221 East Main Street
Round Rock, Texas 78664
Dear Mr. Word:
PO. DRAWER 15426 • AUSTIN, TEXAS 78761 -5426 • (512) 832 -7000
September 13, 1999
The above referenced project is currently scheduled for a December, 1999 bid opening. In
accordance with the project agreement, please transmit a check made payable to the Texas
Department of Transportation, attention Patsy Warren, in the amount of 8980,697.00, prior to
November 10, 1999. This total includes 20% of the construction costs for CSJ 0204 -01 -050 and
100% of the estimated construction costs plus 9.5% engineering & contingencies for project CSJ
0914 -05 -104.
Please keep in mind that this amount is an estimated project cost and any additional costs required
to complete the project, will be required, at the same percentage, after the project has been
constructed and an audit has been performed.
An original executed agreement is enclosed for your files.
If you have any questions, please feel free to contact me at 832 -7154.
Sincerely,
Enclosures
xc: Gerald Pohlmeyer
Danny Stabeno
An Equal Opportunity Employer
Patsy K. Warren
Engineering Specialist
THE STATE OF TEXAS
THE COUNTY OF TRAVIS §
FUNDING AGREEMENT
Strategic Priority Program
WITNESSETH
COUNTY :Williamson
CSJ :0204 -01- 050, 0914-05-912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
THIS AGREEMENT IS MADE BY AND BETWEEN the State of Texas, acting through the
Texas Department of Transportation, hereinafter called the State, and the City of Round Rock,
acting by and through its duly authorized officials, hereinafter called the Outside Entity.
WHEREAS, the Intermodal Surface Transportation Efficiency Act of 1991, ( "ISTEA) codified
under title 23 U.S.C. Section 101 et seq., establishes the National Intermodal Transportation
System that is economically efficient and environmentally sound, provides the foundation for the
nation to compete in the global economy, and will move people and goods in an energy efficient
manner; and
WHEREAS, Transportation Code §201 et. seq. and Transportation Code §221 authorizes the
State to lay out, construct, maintain, and operate a system of streets, roads, and highways that
comprise the State Highway System; and,
WHEREAS, Commission Minute Order Number 107707 authorizes the State to undertake and
complete various improvements generally described as the construction of a four -lane divided
highway along US 79 from County Road 195 to County Road 110, a distance of approximately
2.9 miles in the City of Round Rock, hereinafter called the Project; and,
WHEREAS, the Outside Entity has requested that the State allow the Outside Entity to
participate in said improvements by providing a portion of the costs required to construct the
Project, and
WHEREAS, the State has determined that such participation is in the best interest of the citizens
of the State; and,
1
COUNTY :Williamson
CSJ :0204-01-050, 0914-05-912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
NOW THEREFORE, in consideration of the premises and of the mutual covenants and
agreements of the parties hereto, to be by them respectively kept and performed as hereinafter set
forth, the State and the Outside Entity agree as follows:
ARTICLE 1. TIME PERIOD COVERED
AGREEMENT
This Agreement becomes effective when signed by the last party whose signature makes the
agreement fully executed, and said agreement shall be in full force and effect until the Project
described herein has been completed and accepted by all parties or until terminated as hereinafter
provided.
ARTICLE 2. PROJECT FUNDING
The State will authorize performance of those Project items and participate in funding, as
described within Attachment A, Payment Provisions and Work Responsibilities and Exhibit 1 to
Attachment A.
ARTICLE 3. TERMINATION
Without prejudice to any other legal or equitable right or remedy that either party would
otherwise possess hereunder or as a matter of law, each non - defaulting party, upon giving the
defaulting party five (5) days prior to written notice, shall be entitled to terminate this Agreement
in its entirety at any time for the following:
• If a party shall fail to remedy any default within ten (10) days after written notice thereof from
the non - defaulting party; or
• If either party commits a material default under any of the terms, provisions, conditions, or
covenants contained in this Agreement.
• Upon mutual written agreement and consent of both parties;
• By the State, upon thirty (30) days written notice to the Outside Entity, if the State determines
that completion of the Project is not in the best interest of the State; or
• By the Outside Entity, upon thirty (30) days written notice to the State, if the Outside Entity
determines that completion of the project is not in the best interest of the Outside Entity.
If the contract is terminated by the Outside Entity, the Outside Entity will be responsible for all
direct and indirect costs incurred by the State
2
ARTICLE 4. RIGHT OF ACCESS
ARTICLE 6. SOLE AGREEMENT
If the Outside Entity is the owner of any part of the Project site, the Outside Entity shall permit
the State or its authorized representative access to the site to perform any activities required to
execute the work contemplated in the Agreement. The Outside Entity will provide for all
necessary right -of -way and utility adjustments needed for performance of the work regardless of
ownership of the right -of -way or utility facility.
ARTICLE 5. RESPONSIBILITIES OF THE PARTIES
COUNTY :Williamson
CSJ :0204 -01- 050, 0914 -05 -912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
The Outside Entity acknowledges that while it is not an agent, servant, nor employee of the State,
it is responsible for its own acts and deeds and for those of its agents or employees during the
performance of the work on the Project. Additionally, the State acknowledges that while it is not
an agent, servant, nor employee of the Outside Entity, it is responsible for its own acts and deeds
and for those of its agents or employees during the performance of the work on the project.
In the event the terms of this Agreement are in conflict with the provisions of any other existing
agreements, between the Outside Entity and the State, the provisions of the most recently
executed agreement shall take precedence over the conflicting provisions contained in the other
agreements.
ARTICLE 7. SUCCESSORS AND ASSIGNS
This Agreement shall inure to the benefit of and be binding upon the parties and their respective
successors, executors, assigns, and administrators.
ARTICLE 8. AMENDMENTS
By mutual written consent of the parties, the scope of work and payment provisions of this
Agreement may be amended prior to the expiration of this contract. No amendment to this
Agreement shall be effective and binding until it is reduced to writing and signed by duly
authorized representatives of both parties.
3
ARTICLE 9. INTEREST
ARTICLE 10. INSPECTION AND CONDUCT OF WORK
COUNTY :Williamson
CSI :0204-01-050, 0914-05-912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
The State will not pay interest on funds provided by the Outside Entity. Funds provided by the
Outside Entity will be deposited into, and retained in, the State Treasury.
Unless otherwise specifically stated in Attachment A, Payment Provision and Work
Responsibilities, the State will supervise and inspect all work performed hereunder and provide
such engineering inspection and testing services as may be required to ensure that the construction
is accomplished in accordance with the approved plans and specifications. All correspondence
and instructions to the contractor performing the work will be the sole responsibility of the State.
Unless otherwise specifically stated in Attachment A to this Agreement, all work will be
performed in accordance with the "Standard Specifications for Construction and Maintenance of
Highways, Streets, and Bridges" adopted by the State and incorporated herein by reference, or
special specifications approved by the State.
ARTICLE 11. APPLICABLE LAWS AND REGULATIONS
All applicable State and Federal laws and regulations will be adhered to in the development and
construction of the Project.
4
ARTICLE 12. SIGNATORY WARRANTY
The signatories to this Agreement warrant that each has the authority to enter into this on behalf
of the organization they represent.
ARTICLE 13. PERFORMANCE
Performance and all matters related thereto shall be in Williamson County, Texas, United States
of America.
IN WITNESS WHEREOF, THE STATE AND THE OUTSIDE ENTITY have executed
duplicate counterparts to effectuate this Agreement, each of which shall be deemed an original for
all purposes.
THE STATE OF TEXAS
Certified as being executed for the purpose and effect of activating and/or carrying out the orders,
established policies, or work programs heretofore approved and authorized by the Texas
Transportation Commission under the authority of Minute Order 100002.
B Date
3wrenee3. Zatopek ._. ;it.- !i: -L:-(" ,<
Director, General Services Division
THE OUTSIDE ENTITY
Round Reck
gesd,- k',
F f /Y
C& Date F-
Typed or Printed Name and Title ,e.'T 4. 6 TL 1i ei, (TR.
Attest:
COUNTY :Williamson
CSJ :0204 -01- 050, 0914 -05 -912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
Title: y SeC.eE7Th y
For the purpose of this Agreement, the address of record for each party shall be as shown on the
following page.
5
For the Outside Entity:
City of Round Rock
211 East Main Street
Round Rock, Texas 78664
For the Texas Department of Transportation:
Texas Department of Transportation
Austin District
P. O. Drawer 15426
Austin, Texas 78761 -5426
COUNTY :Williamson
CSJ :0204-01-050, 0914-05-912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
6
1. Right of Way
3. Environmental Mitigation
COUNTY :Williamson
CSI :0204-01-050, 0914-05-912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
ATTACHMENT A
Payment Provision
and
Work Responsibilities
The Outside Entity shall prepare right of way maps, property descriptions and other data
needed, utilizing all applicable Federal and State laws governing the acquisition policies
for acquiring real property. The right of way maps and property descriptions shall be
submitted to the State for approval. Tracings of the maps shall be retained by the State
for its permanent records.
2. Utility Adjustments/Relocations
If the proposed construction along US 79 requires the adjustment, removal or relocation
of utility facilities, the Outside Entity and/or its consultant will establish the necessary
utility work and notify the appropriate utility company to design and schedule their
adjustments. The Outside Entity shall be responsible for ten percent (10 %) of all
reimbursable utility adjustments. Removal or relocation of such utility facilities shall be in
accordance with applicable State law, regulations, policies and procedures. Any additional
relocations associated with the reconstruction of Old Settlers Park Road, will be borne in
its entirety by the City of Round Rock.
A. The Outside Entity shall prepare the appropriate environmental documentation and
secure environmental clearance for the Project. Coordination of the
documentation will be through Mr. Mike Walker, TxDOT, 512/832 -7168.
B. To the extent required to complete the Project, the Outside Entity will be
responsible for the mitigation and remediation of any environmental problems
associated with the development of the Project.
7
C. All costs associated with the remediation of the environmental problems caused by
the negligence or willful conduct of the Outside Entity and/or the property owners
shall be the responsibility of the Outside Entity and/or property owners and not the
State of Texas.
4. Engineering Services
COUNTY :Williamson
CSJ :0204 -01 -050, 0914 -05 -912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
A. The Outside Entity shall prepare or cause to be prepared the engineering plans,
specifications, and estimates (P.S. &E.) necessary for the development of the
Project. The P.S. &E. shall be prepared in accordance with all applicable State and
Federal guidelines.
B. The Engineering plans shall be developed in accordance with the Highway Design
Division Operations and Procedures Manual, the 1993 Standard Specifications for
Construction and Maintenance of Highways, Streets. and Bridges and the Texas
Accessibility Standards.
C. The Outside Entity shall submit the completed P.S. &E. to the State for review and
approval, three (3) months prior to the anticipated bid opening date. Should the
State determine that revisions are required to the documents, the Outside Entity
shall make the necessary revisions, prior to the State's bid opening date.
5. Construction Responsibilities
A. After approval of the P.S. &E., the State shall advertise for construction bids, issue
bid proposals, receive and tabulate bids and award/reject a contract for
construction of the Project
B. The State shall supervise and inspect all work performed by the construction
contractor and will provide such engineering, inspection and testing services as
may be required to ensure that the construction of the Project is accomplished in
accordance with the approved P.S.&E.
8
6. Maintenance Responsibilities
Payment Provisions
COUNTY :Williamson
CSI :0204 -01- 050, 0914 -05 -912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
Upon completion of the Project, the State shall assume responsibility for the maintenance
of the completed facility.
The Outside Entity shall provide all preliminary engineering, environmental studies, right of way
(including any right of way for environmental mitigation) ten percent (10 %) of the reimbursable
utility adjustments and twenty percent (20 %) of the construction costs for the Project.
The State shall provide ninety percent (90 %) of the reimbursable utility adjustments, eighty
percent (80 %) of the construction costs and one hundred percent (100 %) of the construction
engineering costs required to complete the Project.
The Project costs are estimated at $3,152,000.00. The Outside Entity costs are estimated at
$630,400.00, with the remaining balance due by the State. The Outside Entity shall submit
payment to the State sixty (60) days prior to bid opening.
If the construction contract for the Project should overrun the estimated cost, the Outside Entity
will be responsible for twenty percent (20 %) of the additional costs. Payment will be due from
the Outside Entity when the Project is completed and an audit has been performed. All costs
remaining in the Project and due to the Outside Entity will be returned promptly.
The Outside Entity shall also be financially responsible for one hundred percent of the right of
way, utility relocation, construction and construction engineering costs for the reconstruction of
approximately 1600 ft. of Old Settlers Park Road.
The estimated cost for this work is $131,600.00 including 11% construction engineering. All
additional costs required to reconstruct this roadway will be the responsibility of the Outside
Entity. All remaining costs will be promptly returned.
9
COUNTY :Williamson
CSJ :0204-01-050, 0914-05-912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
Estimated Cost Summary — US 79 Project
Old Settlers Park Road Reconstruction
$3,152,000.00
$ 131,600.00
Total amount due from Outside Entity sixty (60) days prior to bid opening $630,400.00
131.600 00
$762,000.00
10
RESOLUTION NO. R- 99- 08- 12 -10D8
WHEREAS, Commission Minute Order 107707 authorizes the Texas
Department of Transportation ( "TxDOT ") to undertake and complete
highway improvements generally described as the construction of a
four -lane divided highway along US 79 from County Road 195 to
County Road 110, and
WHEREAS, TxDOT requires the City to participate in said
improvements by funding a portion of the improvements, and
WHEREAS, TxDOT has submitted a Funding Agreement for the
construction of a four -lane divided highway along US 79 from County
Road 195 to County Road 110, and
WHEREAS, the City wishes to enter into said Funding
Agreement, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City a Funding Agreement with TxDOT for the
construction of a four -lane divided highway along US 79 from County
Road 195 to County Road 110, a copy of said agreement attached
hereto and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice
of the date, hour, place and subject of the meeting at which this
Resolution was
K: \WPDOCS \RESOLUTI \R9OY12O8 _WPD /,,9
adopted was posted and that such meeting was open to
the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered
and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended, and the Act.
RESOLVED this 12th day of August, 1999.
ATTEST:
E LAND, City Secretary
ROB •T A. STLUKA, J,7., Mayor
City of Round Rock, Texas
2
THE STATE OF TEXAS §
THE COUNTY OF TRAVIS
FUNDING AGREEMENT
Strategic Priority Program
§
THIS AGREEMENT IS MADE BY AND BETWEEN the State of Texas, acting through the
Texas Department of Transportation, hereinafter called the State, and the City of Round Rock,
acting by and through its duly authorized officials, hereinafter called the Outside Entity.
WITNESSETH
COUNTY :Williamson
CSJ :0204 -01- 050, 0914 -05 -912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
WHEREAS, the Intermodal Surface Transportation Efficiency Act of 1991, ("ISTEA) codified
under title 23 U.S.C. Section 101 et seq., establishes the National Intermodal Transportation
System that is economically efficient and environmentally sound, provides the foundation for the
nation to compete in the global economy, and will move people and goods in an energy efficient
manner; and
WHEREAS, Transportation Code §201 et. seq. and Transportation Code §221 authorizes the
State to lay out, construct, maintain, and operate a system of streets, roads, and highways that
comprise the State Highway System; and,
WHEREAS, Commission Minute Order Number 107707 authorizes the State to undertake and
complete various improvements generally described as the construction of a four -lane divided
highway along US 79 from County Road 195 to County Road 110, a distance of approximately
2.9 miles in the City of Round Rock, hereinafter called the Project; and,
WHEREAS, the Outside Entity has requested that the State allow the Outside Entity to
participate in said improvements by providing a portion of the costs required to construct the
Project; and
WHEREAS, the State has determined that such participation is in the best interest of the citizens
of the State; and,
1
COUNTY :Williamson
CSJ :0204-01-050, 0914-05-912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
NOW THEREFORE, in consideration of the premises and of the mutual covenants and
agreements of the parties hereto, to be by them respectively kept and performed as hereinafter set
forth, the State and the Outside Entity agree as follows:
AGREEMENT
ARTICLE 1. TIME PERIOD COVERED
This Agreement becomes effective when signed by the last party whose signature makes the
agreement fully executed, and said agreement shall be in full force and effect until the Project
described herein has been completed and accepted by all parties or until terminated as hereinafter
provided.
ARTICLE 2. PROJECT FUNDING
The State will authorize performance of those Project items and participate in funding, as
described within Attachment A, Payment Provisions and Work Responsibilities and Exhibit 1 to
Attachment A.
ARTICLE 3. TERMINATION
Without prejudice to any other legal or equitable right or remedy that either party would
otherwise possess hereunder or as a matter of law, each non - defaulting party, upon giving the
defaulting party five (5) days prior to written notice, shall be entitled to terminate this Agreement
in its entirety at any time for the following:
• If a party shall fail to remedy any default within ten (10) days after written notice thereof from
the non - defaulting party; or
• If either party commits a material default under any of the terms, provisions, conditions, or
covenants contained in this Agreement.
• Upon mutual written agreement and consent of both parties;
• By the State, upon thirty (30) days written notice to the Outside Entity, if the State determines
that completion of the Project is not in the best interest of the State; or
• By the Outside Entity, upon thirty (30) days written notice to the State, if the Outside Entity
determines that completion of the project is not m the best interest of the Outside Entity.
If the contract is terminated by the Outside Entity, the Outside Entity will be responsible for all
direct and indirect costs incurred by the State.
2
COUNTY :Williamson
CSJ :0204 -01 -050, 0914 -05 -912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
ARTICLE 4. RIGHT OF ACCESS
If the Outside Entity is the owner of any part of the Project site, the Outside Entity shall permit
the State or its authorized representative access to the site to perform any activities required to
execute the work contemplated in the Agreement. The Outside Entity will provide for all
necessary right -of -way and utility adjustments needed for performance of the work regardless of
ownership of the right -of -way or utility facility.
ARTICLE 5. RESPONSIBILITIES OF THE PARTIES
The Outside Entity acknowledges that while it is not an agent, servant, nor employee of the State,
it is responsible for its own acts and deeds and for those of its agents or employees during the
performance of the work on the Project. Additionally, the State acknowledges that while it is not
an agent, servant, nor employee of the Outside Entity, it is responsible for its own acts and deeds
and for those of its agents or employees during the performance of the work on the project.
ARTICLE 6. SOLE AGREEMENT
In the event the terms of this Agreement are in conflict with the provisions of any other existing
agreements, between the Outside Entity and the State, the provisions of the most recently
executed agreement shall take precedence over the conflicting provisions contained in the other
agreements.
ARTICLE 7. SUCCESSORS AND ASSIGNS
This Agreement shall inure to the benefit of and be binding upon the parties and their respective
successors, executors, assigns, and administrators.
ARTICLE 8. AMENDMENTS
By mutual written consent of the parties, the scope of work and payment provisions of this
Agreement may be amended prior to the expiration of this contract. No amendment to this
Agreement shall be effective and binding until it is reduced to writing and signed by duly
authorized representatives of both parties.
3
COUNTY :Williamson
CSJ :0204 -01 -050, 0914 -05 -912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
ARTICLE 9. INTEREST
The State will not pay interest on funds provided by the Outside Entity. Funds provided by the
Outside Entity will be deposited into, and retained in, the State Treasury.
ARTICLE 10. INSPECTION AND CONDUCT OF WORK
Unless otherwise specifically stated in Attachment A, Payment Provision and Work
Responsibilities, the State will supervise and inspect all work performed hereunder and provide
such engineering inspection and testing services as may be required to ensure that the construction
is accomplished in accordance with the approved plans and specifications. All correspondence
and instructions to the contractor performing the work will be the sole responsibility of the State.
Unless otherwise specifically stated in Attachment A to this Agreement, all work will be
performed in accordance with the "Standard Specifications for Construction and Maintenance of
Highways, Streets, and Bridges" adopted by the State and incorporated herein by reference, or
special specifications approved by the State.
ARTICLE 11. APPLICABLE LAWS AND REGULATIONS
All applicable State and Federal laws and regulations will be adhered to in the development and
construction of the Project.
4
ARTICLE 12. SIGNATORY WARRANTY
The signatories to this Agreement warrant that each has the authority to enter into this on behalf
of the organization they represent.
ARTICLE 13. PERFORMANCE
Performance and all matters related thereto shall be in Williamson County, Texas, United States
of America.
IN WITNESS WHEREOF, THE STATE AND THE OUTSIDE ENTITY have executed
duplicate counterparts to effectuate this Agreement, each of which shall be deemed an original for
all purposes.
TIIE STATE OF TEXAS
Certified as being executed for the purpose and effect of activating and/or carrying out the orders,
established policies, or work programs heretofore approved and authorized by the Texas
Transportation Commission under the authority of Minute Order 100002.
By Date
Lawrence J. Zatopek
Director, General Services Division
THE OUTSIDE ENTITY
The -C-it • f Rou i d '
As
Typed or Printed Name an. Title 486.er . 65Ti_uf4 , .
Attest:
AzAtdi
COUNTY :Williamson
CSJ :0204 -01 -050, 0914 -05 -912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
Date is -99
Title: &/7 cSE4 Z67RQi
For the purpose of this Agreement, the address of record for each party shall be as shown on the
following page.
5
For the Outside Entity:
City of Round Rock
211 East Main Street
Round Rock, Texas 78664
For the Texas Department of Transportation:
Texas Department of Transportation
Austin District
P. O. Drawer 15426
Austin, Texas 78761 -5426
COUNTY :Williamson
CSJ :0204-01-050, 0914-05-912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
6
COUNTY :Williamson
CSJ :0204-01-050, 0914-05-912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
ATTACHMENT A
Payment Provision
and
Work Responsibilities
1. Right of Way
The Outside Entity shall prepare right of way maps, property descriptions and other data
needed, utilizing all applicable Federal and State laws governing the acquisition policies
for acquiring real property. The right of way maps and property descriptions shall be
submitted to the State for approval. Tracings of the maps shall be retained by the State
for its permanent records.
2. Utility Adjustments/Relocations
If the proposed construction along US 79 requires the adjustment, removal or relocation
of utility facilities, the Outside Entity and/or its consultant will establish the necessary
utility work and notify the appropriate utility company to design and schedule their
adjustments. The Outside Entity shall be responsible for ten percent (10 %) of all
reimbursable utility adjustments. Removal or relocation of such utility facilities shall be in
accordance with applicable State law, regulations, policies and procedures. Any additional
relocations associated with the reconstruction of Old Settlers Park Road, will be borne in
its entirety by the City of Round Rock.
3. Environmental Mitigation
A. The Outside Entity shall prepare the appropriate environmental documentation and
secure environmental clearance for the Project. Coordination of the
documentation will be through Mr. Mike Walker, TxDOT, 512/832 -7168.
B. To the extent required to complete the Project, the Outside Entity will be
responsible for the mitigation and remediation of any environmental problems
associated with the development of the Project.
7
COUNTY :Williamson
CSJ :0204 -01 -050, 0914 -05 -912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
C. All costs associated with the remediation of the environmental problems caused by
the negligence or willful conduct of the Outside Entity and/or the property owners
shall be the responsibility of the Outside Entity and /or property owners and not the
State of Texas.
4. Engineering Services
A. The Outside Entity shall prepare or cause to be prepared the engineering plans,
specifications, and estimates (P.S. &E.) necessary for the development of the
Project. The P.S. &E. shall be prepared in accordance with all applicable State and
Federal guidelines.
B. The Engineering plans shall be developed in accordance with the Highway Design
Division Operations and Procedures Manual, the 1993 Standard Specifications for
Construction and Maintenance of Highways. Streets, and Bridges and the Texas
Accessibility Standards.
C. The Outside Entity shall submit the completed P.S. &E. to the State for review and
approval, three (3) months prior to the anticipated bid opening date. Should the
State determine that revisions are required to the documents, the Outside Entity
shall make the necessary revisions, prior to the State's bid opening date.
5. Construction Responsibilities
A. After approval of the P.S. &E., the State shall advertise for construction bids, issue
bid proposals, receive and tabulate bids and award/reject a contract for
construction of the Project
B. The State shall supervise and inspect all work performed by the construction
contractor and will provide such engineering, inspection and testing services as
may be required to ensure that the construction of the Project is accomplished in
accordance with the approved P.S. &E.
8
COUNTY :Williamson
CSJ :0204 -01- 050, 0914 -05 -912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
6. Maintenance Responsibilities
Upon completion of the Project, the State shall assume responsibility for the maintenance
of the completed facility.
Payment Provisions
The Outside Entity shall provide all preliminary engineering, environmental studies, right of way
(including any right of way for environmental mitigation) ten percent (10 %) of the reimbursable
utility adjustments and twenty percent (20 %) of the construction costs for the Project.
The State shall provide ninety percent (90 %) of the reimbursable utility adjustments, eighty
percent (80 %) of the construction costs and one hundred percent (100 %) of the construction
engineering costs required to complete the Project.
The Project costs are estimated at $3,152,000.00. The Outside Entity costs are estimated at
$630,400.00, with the remaining balance due by the State. The Outside Entity shall submit
payment to the State sixty (60) days prior to bid opening.
If the construction contract for the Project should overrun the estimated cost, the Outside Entity
will be responsible for twenty percent (20 %) of the additional costs. Payment will be due from
the Outside Entity when the Project is completed and an audit has been performed. All costs
remaining in the Project and due to the Outside Entity will be returned promptly.
The Outside Entity shall also be financially responsible for one hundred percent of the right of
way, utility relocation, construction and construction engineering costs for the reconstruction of
approximately 1600 ft. of Old Settlers Park Road.
The estimated cost for this work is $131,600.00 including 11% construction engineering. All
additional costs required to reconstruct this roadway will be the responsibility of the Outside
Entity. All remaining costs will be promptly returned.
9
COUNTY :Williamson
CSJ :0204-01-050, 0914-05-912
HIGHWAY :US 79
LIMITS :1.5 Mi E of FM 1460 to
3.8 Mi E of FM 1460
Estimated Cost Summary — US 79 Project
Old Settlers Park Road Reconstruction
Total amount due from Outside Entity sixty (60) days prior to bid opening $630,400.00
131,600.00
$762,000.00
10
$3,152,000,00
$ 131,600.00
C4
14
W
4,10
naP I
-4
as
f_
s � I' COr�TYR�AD1�3 —�
1 5 Si�I ig•
f L11 T I Zl I 1 nN 2
J
MN
Is
ma la I, To.
1
MUM
. --
=t,
1�
.11k I 7i1
U.S. 79 IMPROVEMENTS
a o
RFSnC
cre
DATE: August 6, 1999
SUBJECT: City Council Meeting — August 12, 1999
ITEM: 10.D.8. Consider a resolution authorizing the Mayor to enter into a Funding
Agreement with the Texas Department of Transportation for the
construction of a four lane divided highway along US 79 from
County Road 195 to County Road 110. The City of Round Rock and
the Texas Department of Transportation (TxDOT) are working in
partnership to construct a four lane divided highway along US 79 from
County Road 195 to County Road 110. The City's participation in the
project was approved through the adoption of Resolution No. R- 99 -01-
14-14A3. This Funding Agreement establishes in writing the fiscal
and contracting arrangement that the City and TxDOT will use in
implementing this project. The terms included in the Funding
Agreement are consistent with those the City Council agreed to
through Resolution No. R- 99- 01- 14 -14A3. The project is being
funded from the %z cent sales tax for transportation. Staff Resource
Person: Jim Nuse, Public Works Director.