Loading...
R-99-09-09-10E2 - 9/9/1999Mayor Robert A. Stluka, Jr. Mayor Pro-tem Martha A. Chavez Council Members Tom Nielson Ear! M. Hairston Rick Stewart Ear! Palmer Jimmy Joseph City Manager Robert L Bennett, Jr. City Attorney Stephan L Sheets CITY OF ROUND ROCK September 27, 1999 Mr. Greg T. Swoboda, P. E. Camp, Dresser & McKee, Inc. 9111 Jollyville Road, Suite 105 Austin, Texas 78759 Dear Mr. Swoboda: The Round Rock City Council approved Resolution No. R- 99- 09 -09- 10E2 at their regularly scheduled meeting on September 9, 1999. This resolution approves change order no. 2 to the contract with Cunningham Constructors and Associates for a Disinfection Basin and Washwater Recovery Pump Station at the Water Treatment Plant. Enclosed is a copy of the resolution and change order for your files. If you have any questions, please do not hesitate to contact Steve Miller at 218 -6601. Sincerely, Joanne Land Assistant City Manager/ City Secretary cc: Cunningham Constructors Fax: 512 -218 -7097 1. 800 - 735 -2989 TDD 1- 800 - 735 -2988 Voice www.ci.round- rock.tx.us 221 East Main Street Round Rock, Texas 78664 512-218-5400 Mayor Robert A. Stluka, Jr. Mayor Pro-tem Martha A. Chavez Council Members Tom Nielson Earl M. Hairston Rick Stewart Earl Palmer Jimmy Joseph City Manager Robert L Bennett, Jr City Attorney Stephan L Sheets CITY OF ROUND ROCK September 27, 1999 Cunningham Constructors, Inc. P.O. Box 2237 Georgetown, Texas 78627 Dear Sir: Sincerely, Joanne Land Assistant City Manager/ City Secretary Enclosures Fax: 512-218-7097 Zq/vtoc- 1. 800 - 735 -2989 TDD 1 -800- 735 -2988 Voice www.ci.round- mck.tx.us 221 East Main Street Round Rock. Texas 78664 512- 218 -5400 The Round Rock City Council approved Resolution No. R-99- 09-09- 10E2 at their regularly scheduled meeting on September 9, 1999. This resolution approves change order no. 2 to the contract for a Disinfection Basin and Washwater Recovery Pump Station at the Water Treatment Plant. Enclosed is a copy of the resolution and change order for your files. If you have any questions, please do not hesitate to contact Steve Miller at 218 -6601. RESOLUTION NO. R- 99- 09- 09 -10E2 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Cunningham Constructors & Associates for a Disinfection Basin and a Washwater Recovery Pump Station at the Water Treatment Plant, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with Cunningham Constructors & Associates for a Disinfection Basin and a Washwater Recovery Pump Station at the Water Treatment Plant. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 9th day of Septe E LAND, City Secretary x: \wvmcs \xasoauxx \a9osa9ea. weu /scg City of Round Rock, Texas CITY OF ROUND ROCK Date: Sheet: CONTRACT CHANGE ORDER NO.: 2 7-Jul-99 ADDED TIME DAYS 1 of 1 Contract: WTP Disinfection Basin & Washwater Recovery Improvements Owner: City of Round Rock, 221 East Main Street, Round Rock, Texas 78664 TO Cunningham Constructors & Associates, Inc. (Contractor) You are hereby requested to comply with the following changes from the Contract Plans and Specifications: Description of Changes (SupplmnHd Plana and Specification Attached) 1.0 Conductor size Unmet. to match proposed circuit breaker (ref: lever dated 6/18/99) 2.0 Installation of clean-out on sludge line (ref: letter dated 6/24/99) 3.0 Replace portion on 6' A-C anew/ DI type (ref: letter dated 6/24/99) Decrease Increase $4,943.68 11,199.21 $1,413.84 0 0 0 J USTIFICATION: Improvements identified during the course of construction: //1 is to eliminate the possibility of experiencing low amperage, 92 is to address possible backup problems and 03 is the replacement of a section of ebeatas -cement waterline. ORIGINAL CONTRACT AMT: Dollars [ $ $1,994,800.00 ] ] ] ] 1 THIS CHANGE ORDER (C.O.) AMT.: Dollars [ $ $7,556.73 PREVIOUS CHANGE ORDER AMT: Dollars [ $ $347,489.73 CHANGE ORDERS TO -DATE AMT: Dollars [ $ $355,046.46 ORIGINAL CONTRACT PLUS C.O.'S Dollars [ $ $2,349,846.46 TOTAL PERCENT CHANGE PERCENT %: 15.11 This document will become a supplement to the contract and all provisions will apply hereto: A A s — a• .L..r l / /9q :.. p, Dress & McKee Engineer Date — 21 C O 17 Date ■ :m, to Contractor 9 19 r City 7 ' ound Rock Owner Date ro/form.6ak DATE: September 3, 1999 SUBJECT: City Council Meeting — September 9, 1999 ITEM: 10.E.2. Consider a resolution authorizing the Mayor to execute Change Order No. 2, for the Water Treatment Plant Disinfection Basin & Washwater Recovery Improvements with Cunningham Constructors & Associates, Inc. These changes involve increasing electrical conductor size, replacing existing AC type pipe with DI pipe, and installing a cleanout arrangement on a sludge drain line. The cost associated with these changes is $7,556.73, which increases the contract amount to $2,349,846.46. Staff Resource Person: Jim Nuse, Public Works Director.