September 27, 1999
Mr. James K. Haney, P.E.
Executive Vice President
HDR Engineering, Inc.
2211 S. IH 35, Suite 300
Austin, Texas 78741
Dear Myan y:
221 East Main Street
Round Rock, Texas 78664
512 -218 -5400
The Round Rock City Council approved Resolution No. R- 99- 09 -09-
10E3 at their regularly scheduled meeting on September 9, 1999. This
resolution approves Amendment No. 2 to the contract for the West
Transmission Water Pipeline Design Services to provide for changes in
the proposed route alignment north of FM 620 along Wyoming Springs
Road.
Enclosed is a copy of the resolution and Amendment No. 2 for your
files. If you have any questions, please do not hesitate to contact Jim
Nuse at 218 -5555.
Sincerely,
Joanne Land
Assistant City Manager/
City Secretary
Enclosures
Fax: 512- 218 -7097
1-800-735-2989 TDD 1- 800 - 735 -2988 Voice
www.ci.rou.nd-rock.tx.us
RESOLUTION NO. R- 99- 09- 09 -10E3
WHEREAS, the City of Round Rock has previously entered into a
contract for engineering services ( "Contract ") with HDR Engineering,
Inc. for the West Transmission Water Pipeline, Design Services, and
WHEREAS, HDR Engineering, Inc. has submitted Amendment No. 2 to
the Contract to provide for changes in proposed route alignment north
of FM 620 along Wyoming Springs Road, and
WHEREAS, the City Council desires to enter into said Amendment
No. 2 to the Contract with HDR Engineering, Inc., Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Amendment No. 2 to the Contract with HDR
Engineering, Inc. to provide for changes in proposed route alignment
north of FM 620 along Wyoming Springs Road, a copy of said Amendment
being attached hereto and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended, and the Act.
R: \WPDOCS \RESOLUTI \R90909E3. WPD /eCg
ATTEST:
RESOLVED this 9th day of September, 1999.
(ANNE LAND, City Secretary
2
ROBERT A. STLUKA, Mayor
City of Round Rock, Texas
AMENDMENT No. 2
to the
CONTRACT FOR ENGINEERING SERVICES between
THE CITY OF ROUND ROCK and
HDR ENGINEERING, INC.
Dated March 25, 1999
This constitutes an Amendment to the Contract for Engineering Services — West Transmission
Water Pipeline, Design for PROFESSIONAL SERVICES between the City of Round Rock
"City" and HDR Engineering, Incorporated, of Austin, Texas (HDR) to perform environmental
services for the preparation of bidding documents. HDR will retain Baker - Aicklen & Associates
Inc. to complete additional survey work to address state and federal environmental regulatory
issues. Specific tasks include the survey of an alternative pipeline alignment to avoid a
significant cave found on the original pipeline alignment. Baker - Aicklen & Associates Inc. is
prepared to complete survey services for the West Transmission Water Pipeline project described
above on a not -to- exceed Per Diem basis in the amount of Three Thousand Four Hundred and
Fifty Five Dollars ($3,455.00). The original contract total fees are Two Hundred Sixty Eight
Thousand Two Hundred Dollars ($268,200.00). The new contract total fees including
AMENDMENT No. 1 and 2 are Two Hundred Eighty Thousand Six Hundred Fifty Five Dollars
($280,655.00).
The term of this Amendment shall commence on the signing date and continue in effect until
such time as terminated in writing by either party.
The undersigned signatory or signatories for the Engineer hereby represent and warrant that
the signatory is an officer of the organization for which he or she has executed this Contract and that
he or she has full and complete authority to enter into this Contract on behalf of the firm. The
above - stated representations and warranties are made for the purpose of inducing the City to enter
into this Contract.
IN WITNESS HEREOF, the City and the Engineer have executed these presents in duplicate.
Executive Vice President
n I
ert St uka, Mayor
R
Date: - - 9 9
GENERAL
SIGNATORY WARRANTY
Attachments: Scope of Services letter to be provided by Baker - Aicklen Associates, Inc dated
August 18, 1999.
Client
HDR ENGINEERING
Project No.
285 -710
Project
24" Diameter West Transmission Line
Contract Date
3/10990
Subject of Additional Services
Additional Topo, Utility Location & Easement along Wyoming Springs Rd. for new
alignment
Additional Services Project No.
285 - 710 -11
1. On the ground survey sufficient to prepare a topographic map with utility locations in AutoCad14 and furnish one description for one
permanent 20' easement, as depicted by attached Exhibit "A ". Sketches that accompany easement description shall depict temporary
workspace easement graphically, if required. Please specify if temporary workspace shall be required.
Reason For Change
Client Request
Compensation:
X Hourly charge plus reimbursable expense basis, as defined in the
PROFESSIONAL SERVICES AGREEMENT, and
for these ADDITIONAL SERVICES are
the PROFESSIONAL SERVICES AGREEMENT,
for these ADDITIONAL SERVICES are to
In addition to the compensation for BASIC SERVICES. Total charges
estimated to be approximately S 3 455.00 .
Lump sum charge basis plus reimbursable expenses, as defined in
and In addition to the compensation for BASIC SERVICES. Total charges
be ;__
Estimated Date of Completion:
PROPOSED BY: BAKER -AICK EN & ASSOCIATES, INC.
A. illiam Waeitz, P.E., Branch anager Date
APPROVED BY:
Client:
Date
Title:
(Sign, keep Client's copy & return all others.)
08/18/99 OED 11:19 I'AA 0120449923 waxer- A1cKien /tK
7i I Baker- Aicklen
-� & Associates, Inc.
Engineers /Surveyors
ADDITIONAL SERVICES AUTHORIZATION
Date 8/17/99
411 VU
Proposal No. 99 - 5079
/10 / 'olio 1J : 4V rein. 01c444
navel - -ni �nicn� .s.%
Effective August 1, 1998, the following rates are recommended for work performed on an hourly - charge basis.
Rates include company overhead and profit for services accomplished during regular working hours.
DIRECT LABOR
OFFICE PERSONNEL SERVICES
STANDARD RATE SCHEDULE
(Labor Rate Table 34)
Classification Rates
Project Engineer $100.00 per hour
Staff Engineer $85.00 per hour
Project Surveyor $80.00 per hour
Project Designer /Coordinator $70.00 per hour
Staff Surveyor /Engineering Assistant/GPS Processor $65.00 per hour
Senior Engineering /Surveying CAD Technician/Designer $55.00 per hour
Engineering /Surveying CAD Technician/Designer $50.00 per hour
CAD Draftsman/Field Representative $45.00 per hour
Secretary $45.00 per hour
Expert Witness/Testimony /Deposition Services Two Times Rates
Principal (as appropriate) $120.00 per hour
FIELD PARTY SERVICES Rates
1 -Man Field Party $65.00 per hour
2 -Man Field Party $90.00 per hour
3 -Man Field Party $110.00 per hour
4 -Man Field Party $130.00 per hour
GPS Field Unit with Operator (Note 5) $100.00 per hour
GPS Field Unit without Operator (Note 5) $60.00 per hour
DIRECT EXPENSES
Transportation:
By Firm's Passenger Vehicles (Note 1) $ 0.35 per mile
By Firm's Survey Trucks (Notes 1, 2, 3 & 4) $ 0.35 per mile
Subsistence of out -of -city work $100.00 per day
Reproduction & Printing by Firm, Prevailing Com-
Survey Stakes, Lathes, Iron Rods mercial Rates Or
and other Direct Expense Cost, Plus 10%
Notes:
1. A mileage charge will be billed for projects exceeding a 50 -mile radius of the base office only.
2, Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes,
lathes, etc., used such as during the construction phase of a project will be charged as indicated.
3. A minimum of two (2) hours field party time charge will be made for show -up time and return to office,
resulting from inclement weather conditions, etc.
4. Field Party stand -by time will be charged for at the above -shown appropriate rates.
5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field
party rates.
6. The firm's professional liability is limited to the total amount of compensation associated with a specific
project up to a maximum of $50,000.
�
, Baker-Aicklen
, � & Associates, Inc.
Engineers /Surveyors
. 0
, \
U1
0
W.1.7
A TER rEE
E
OAKCREEK S.
CAB. VI SLD
, r 01'1
DATE: September 3, 1999
SUBJECT: City Council Meeting — September 9, 1999
ITEM: 10.E.3. Consider a resolution authorizing the Mayor to execute Contract
Amendment No. 2 with HDR Engineering, Inc. for the West
Transmission Water Pipeline Project. This contract amendment is for
surveying services for the changes in the proposed route alignment
north of FM 620 along Wyoming Springs Road. The new alignment
will shift the pipeline route away from a known karst feature and cave
area. The amendment cost is $3,455.00 increasing the total
engineering contract to $280,655.00. Staff Resource Person: Jim Nuse,
Public Works Director.