Loading...
R-99-09-23-10D2 - 9/23/1999)-( . CITY OF ROUND ROCK tt t y NiiiN t t Mayor Robert A. Maim, Jr Mayor Pro-tem Martha A. Chavez Council Members Tom Nilson Earl M. Hairston Rick Stewart Earl Palmer Jimmy Joseph City Manager Robert L Bennett, Jr. City Attorney Stephan L Sheets October 7, 1999 Mr. Greg Ward C. P. Snider Construction Co. P.O. Box 743636 Austin, Texas 78709 -0818 Dear Mr. Ward: 221 East Main Street Round Rock, Texas 78664 512- 218 -5400 The Round Rock City Council approved Resolution No. R- 99 -09- 23 -10D2 at their regularly scheduled meeting on September 23, 1999. This resolution approves Change Order No. 2 for the Library Addition and Remodel Project. Enclosed is a copy of the resolution and Change Order for your files. If you have any questions, please do not hesitate to contact Larry Madsen at 218- 5555. Sincerely, Enclosures Fax: 512 -218 -7097 Joanne Land Assistant City Manager/ City Secretary 1 -800- 735 -2989 TDD 1- 800 - 735 -2988 Voice www.ci.round- rock.tx.us Mayor Robert A. Volta, Jr. Mayor Pro -tem Manta A. Chavez Council Members Tom Nielson Earl M. Hairston Rick Stewart Earl Palmer Jimmy Joseph City Manager Robert L Bennett, Jr City Attorney Stephan L Sheets CITY OF ROUND ROCK October 7, 1999 Mr. Ray Gill R. Gill & Associates P.O. Box 217 Round Rock, Texas 78680 -0217 Dear 221 East Main Street Round Rock, Texas 78664 512 -218 -5400 The Round Rock City Council approved Resolution No. R- 99- 09- 23 -10D2 at their regularly scheduled meeting on September 23, 1999. This resolution approves Change Order No. 2 to the contract with C. P. Snider Construction Co., Inc. for the Library Addition and Remodel Project. Enclosed is a copy of the resolution and Change Order for your files. If you have any questions, please do not hesitate to contact Larry Madsen at 218- 5555. Sincerely, ca"i4w k4/76' Joanne Land Assistant City Manager/ City Secretary Enclosures Fax: 512- 218 -7097 1 -800- 735 -2989 TDD 1- 800 - 735 -2988 Voice www.ci.round- rock.tx.us RESOLUTION NO. R- 99- 09- 23 -10D2 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with C.P. Snider Construction Co., Inc. for the Library Addition and Remodel Project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with C.P. Snider Construction Co., Inc. for the Library Addition and Remodel Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 23rd day of Sept mhP , 1999. ANNE LAND, City Secretary K;\ WPDOCS \RESOI.UTI \R9092SD2.WPO /scg ROT A. STLUKA, 4R., Mayor City of Round Rock, Texas PROJECT: (name, address) TO (Contractor): ARCHITECT R. GILL & ASSOCIATES POB 217 Round - - ck, 786 6 %Ii. CHANGE ORDER Round Rock Public Library CHANGE ORDER NUMBER: 06 City of Round Rock 221 East Main Street Round Rock, TX. 78664 C.P. Snider Construction Co. P.O. Box 743636 Austin, Texas 78709 -0818 CONTRACTOR C. P. Snider Construction Co. P.O. B,, 743636 0217 Austi X. 78709 -0 INITIATION DATE: Sept. 8, 1999 ARCHITECTS PROJECT NO: 2086 CONTRACT FOR: CONTRACT DATE: Distribution to OWNER ARCHITECT CONTRACTOR FIELD OTHER x X X LJ C $2,860.000.00 January 13, 1998 You are directed to make the following changes in this Contract: 116 Calender days are hereby added to the Contract. Reference the attached letter from the City of Round Rock. ADD for additional furr downs and relocations of existing fire extinguisher cabinets Proposal Request No. 31 ADD for additional light fixtures at the second floor Proposal Request No. 34 ADD for concrete curbs at the front of the building Proposal Request No. 35 ADD for relocation of the fire alarm panel Proposal Request No. 36 ADD for additional mechanical work due to insufficient ceiling clearances Proposal Request No. 37 ADD for additional electrical work to comply with city requirements Proposal Request No. 38 ADD for additional exit devices at two exits doors Proposal Request No. 39 ADD for additional signage Proposal Request No. 40 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) was Net change by previously authorized Change Orders The (Contract Sum) prior 10 this Change Order was The (Contract Sum) will be (increased) (decreased) (unchanged) by this Change Order The new (Contract Sum) including this Change Order will be The Contract Time will be (increased) (decreased) (unchanged) by The Date of Substantial Completion as of the date of this Change Order there is OWNER City of Round Rock 2 - ■gain Street $1,917.00 $2,588.00 $1,332.00 $1,764.00 $3,890.00 $1,314.00 $1,408.00 $1,411.00 615,624.00 $2,860,000.00 $10,435.00 $2,870,435.00 $15,624.00 $2,886,059.00 (116) Days. October 17, 1999 Authorized: . II " a7,_.l A CITY OF ROUND ROCK p �y eIII Mayor Robert A. Stluka, Jr Mayor Pro -tem Martha A. Ch,,' Council Members Tom Nielson Earl M. Hairston Rick Stewart Earl Palmer Jimmy Joseph City Manager Robert L Bennett, Jr. City Attorney Stephan L Sheets June 23, 1999 C.P. Snider Construction Company P.O. Box 90818 Austin, Texas 78704 -0818 RE: Public Library Addition & Remodel This letter is notification of extension of time for the contract for the Library Project. The new date of substantial completion will be October 17, 1999. These days are accumulation of changes made from the betterment fund allowance and other changes to plans. This includes delays for structural steel, electrical changes, Matrix tile selections, addition of Masonry Wall footing and request from library to move back the move in date on the new addition due to scheduling of library programs. With kindest regards, Dale Ricklefs, Library Director 41 Larry Madsen Public Works Construction Manager librakr /hn/vm Fax: 512 -2)8 -7097 221 East Main Street Round Rock. Texas 78664 512 -218 -5400 1- 800 - 735 -2989 TDD 1 -800- 735 -2988 Voice www.ci.round- rock.lx.us $ C. P. SNIDER CONSTRUCTION COMPANY GENERAL CONTRACTOR PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: MAY 25, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 31 DESCRIPTION OF CHANGE OF THE WORK: PROVIDE FURR DOWNS (50 LF) AND RELOCATE FEC NOTES: 1. WORK REQUESTED REQUIRES THREE (3) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM ITEM CHANGE ORDER PROPOSAL FORM QUAN COST SUB MATERIAL LABOR TOTAL READ TOTAL AMOUNT OF LABOR /MATERIALS/SUBCONTRACTOR.... INSURANCE AND PAYROLL TAXES OF $426.00 X 0.40% 170.4 SUBTOTAL 1758.4 PLUS 5% FOR SUBCONTRACTOR WORK 52.75 PLUS 15% FOR PRIME CONTRACTOR WORK 105.51 ADJUSTMENT 0.34 TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL OWNER R SENTATI C. P. DER CONSTRNCTION COMPANY 65 ; L - --3- Q 71 f ✓/1 /2(') 5 y9 APPROViD DATE GREGORY L. WARD DATE ; � R / ( j/ VICE PRESIDENT Page 1 (512) 28816030 P.O. BOX 90818 AUSTIN. TEXAS 78709091e FAX (512) 288 1588 $ 1,917.00 I 0 0 0 0 0 0 METAL STUDS 260 0 39 41 80 DRYWALL 0 38 25 63 PAINT 1055 0 0 1055 RELOCATE FEC 12 0 0 360 360 BOND PREMIUM 0 30 0 30 0 0 0 0 0 0 SUBTOTALS 1055 107 426 1588 $ C. P. SNIDER CONSTRUCTION COMPANY GENERAL CONTRACTOR PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: MAY 25, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 31 DESCRIPTION OF CHANGE OF THE WORK: PROVIDE FURR DOWNS (50 LF) AND RELOCATE FEC NOTES: 1. WORK REQUESTED REQUIRES THREE (3) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM ITEM CHANGE ORDER PROPOSAL FORM QUAN COST SUB MATERIAL LABOR TOTAL READ TOTAL AMOUNT OF LABOR /MATERIALS/SUBCONTRACTOR.... INSURANCE AND PAYROLL TAXES OF $426.00 X 0.40% 170.4 SUBTOTAL 1758.4 PLUS 5% FOR SUBCONTRACTOR WORK 52.75 PLUS 15% FOR PRIME CONTRACTOR WORK 105.51 ADJUSTMENT 0.34 TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL OWNER R SENTATI C. P. DER CONSTRNCTION COMPANY 65 ; L - --3- Q 71 f ✓/1 /2(') 5 y9 APPROViD DATE GREGORY L. WARD DATE ; � R / ( j/ VICE PRESIDENT Page 1 (512) 28816030 P.O. BOX 90818 AUSTIN. TEXAS 78709091e FAX (512) 288 1588 $ 1,917.00 I $ C. P. SNIDER CONSTRUCTION COMPANY ITEM PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: JUNE 22, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 34 DESCRIPTION OF CHANGE OF THE WORK: PROVIDE FOUR NEW LIGHT FIXTURES AT SECOND FLOOR NOTES: 1. WORK REQUESTED REQUIRES FIVE (5) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM OWNER PRESENT T GENERAL. CONTRACTOR f--/-?f P RRVED DATE K;(,./0 Airne 040 CHANGE ORDER PROPOSAL FORM QUAN COST SUB MATERIAL LABOR TOTAL TOTAL AMOUNT OF LABORIMATERIALS !SUBCONTRACTOR.... 2460.08 INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% SUBTOTAL PLUS 5% FOR SUBCONTRACTOR WORK PLUS 15% FOR PRIME CONTRACTOR WORK ADJUSTMENT TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL Page 1 0. P. ER CONSTRj1CTION COMPANY GREGORY L. WARD VICE PRESIDENT (512) 288-6030 P.O. BOX 90818 AUSTIN. TEXAS 78709-0818 FAX (512) 288b440 0 2460.08 120.504 7.5 -0.08 Ls 2,588.001 7 -z. - 99 DATE rtcuv 0 0 0 0 0 0 0 0 0 0 ELECTRICAL 2410.08 0 0 2410.08 0 0 0 0 0 0 0 0 BOND PREMIUM 0 50 0 50 0 0 0 0 0 0 SUBTOTALS 2410.08 50 0 2460.08 $ C. P. SNIDER CONSTRUCTION COMPANY ITEM PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: JUNE 22, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 34 DESCRIPTION OF CHANGE OF THE WORK: PROVIDE FOUR NEW LIGHT FIXTURES AT SECOND FLOOR NOTES: 1. WORK REQUESTED REQUIRES FIVE (5) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM OWNER PRESENT T GENERAL. CONTRACTOR f--/-?f P RRVED DATE K;(,./0 Airne 040 CHANGE ORDER PROPOSAL FORM QUAN COST SUB MATERIAL LABOR TOTAL TOTAL AMOUNT OF LABORIMATERIALS !SUBCONTRACTOR.... 2460.08 INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% SUBTOTAL PLUS 5% FOR SUBCONTRACTOR WORK PLUS 15% FOR PRIME CONTRACTOR WORK ADJUSTMENT TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL Page 1 0. P. ER CONSTRj1CTION COMPANY GREGORY L. WARD VICE PRESIDENT (512) 288-6030 P.O. BOX 90818 AUSTIN. TEXAS 78709-0818 FAX (512) 288b440 0 2460.08 120.504 7.5 -0.08 Ls 2,588.001 7 -z. - 99 DATE $ C. P. SNIDER CONSTRUCTION COMPANY GENERAL CONTRACTOR PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: JUNE 22, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 35 DESCRIPTION OF CHANGE OF THE WORK: ADDITIONAL CONCRETE AT FRONT OF BUILDING NOTES: 1. WORK REQUESTED REQUIRES THREE (3) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM ITEM OWNER R AAPPR" °� D��' CHANGE ORDER PROPOSAL FORM QUAN COST SUB MATERIAL LABOR TOTAL REQD TOTAL AMOUNT OF LABOR /MATERIALS /SUBCONTRACTOR INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% SUBTOTAL PLUS 5% FOR SUBCONTRACTOR WORK PLUS 15% FOR PRIME CONTRACTOR WORK ADJUSTMENT TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL Page 1 (512) 288-8030 P.O. BOX 90818 AUSTIN. TEXAS 78709-0818 FAX (512) 288-8440 1266 0 1266 62 3.9 0.1 $ 1,332.001 C. P. p IDER CONSTR TION COMPANY DATE GR ORY L. WARD DATE VICE PRESIDENT 0 0 0 0 0 0 0 0 0 0 CONCRETE 1240 0 0 1240 0 0 0 0 0 0 0 0 BOND PREMIUM 0 26 0 26 0 0 0 0 0 0 SUBTOTALS 1240 26 0 1266 $ C. P. SNIDER CONSTRUCTION COMPANY GENERAL CONTRACTOR PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: JUNE 22, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 35 DESCRIPTION OF CHANGE OF THE WORK: ADDITIONAL CONCRETE AT FRONT OF BUILDING NOTES: 1. WORK REQUESTED REQUIRES THREE (3) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM ITEM OWNER R AAPPR" °� D��' CHANGE ORDER PROPOSAL FORM QUAN COST SUB MATERIAL LABOR TOTAL REQD TOTAL AMOUNT OF LABOR /MATERIALS /SUBCONTRACTOR INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% SUBTOTAL PLUS 5% FOR SUBCONTRACTOR WORK PLUS 15% FOR PRIME CONTRACTOR WORK ADJUSTMENT TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL Page 1 (512) 288-8030 P.O. BOX 90818 AUSTIN. TEXAS 78709-0818 FAX (512) 288-8440 1266 0 1266 62 3.9 0.1 $ 1,332.001 C. P. p IDER CONSTR TION COMPANY DATE GR ORY L. WARD DATE VICE PRESIDENT OWNER ITEM J P " R RE ESSEENTATIVE O APPROVED nsi 44 attie awl? GENERAL CONTRACTOR CHANGE ORDER PROPOSAL FORM TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL DATE Page 1 $ C. P. SNIDER CONSTRUCTION COMPANY INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% P /SNIDER CONSTRICTION COMPANY (512) 288-6030 P.O. BOX 90818 AUSTIN. TEXAS 78709-0818 FAX (512) 288-6440 PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: JUNE 29, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 36 DESCRIPTION OF CHANGE OF THE WORK: RELOCATE FIRE ALARM PANEL PER OWNERS DIRECTION NOTES: 1. WORK REQUESTED REQUIRES FIVE (5) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM QUAN COST SUB MATERIAL LABOR TOTAL REQD TOTAL AMOUNT OF LABOR /MATERIALS /SUBCONTRACTOR.... 1677.02 0 SUBTOTAL 1677.02 PLUS 5% FOR SUBCONTRACTOR WORK 82.151 PLUS 15% FOR PRIME CONTRACTOR WORK 5.1 ADJUSTMENT -0.27 $ 1,764.00 I C A � - z ?V GREGORY L. WARD DATE VICE PRESIDENT 0 0 0 0 0 0 0 0 0 0 ELECTRICAL 1238.02 0 0 1238.02 PAINTING 405 0 0 405 0 0 0 0 BOND PREMIUM 0 34 0 34 0 0 0 0 0 0 SUBTOTALS 1643.02 34 0 1677.02 OWNER ITEM J P " R RE ESSEENTATIVE O APPROVED nsi 44 attie awl? GENERAL CONTRACTOR CHANGE ORDER PROPOSAL FORM TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL DATE Page 1 $ C. P. SNIDER CONSTRUCTION COMPANY INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% P /SNIDER CONSTRICTION COMPANY (512) 288-6030 P.O. BOX 90818 AUSTIN. TEXAS 78709-0818 FAX (512) 288-6440 PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: JUNE 29, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 36 DESCRIPTION OF CHANGE OF THE WORK: RELOCATE FIRE ALARM PANEL PER OWNERS DIRECTION NOTES: 1. WORK REQUESTED REQUIRES FIVE (5) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM QUAN COST SUB MATERIAL LABOR TOTAL REQD TOTAL AMOUNT OF LABOR /MATERIALS /SUBCONTRACTOR.... 1677.02 0 SUBTOTAL 1677.02 PLUS 5% FOR SUBCONTRACTOR WORK 82.151 PLUS 15% FOR PRIME CONTRACTOR WORK 5.1 ADJUSTMENT -0.27 $ 1,764.00 I C A � - z ?V GREGORY L. WARD DATE VICE PRESIDENT S C. P. SNIDER CONSTRUCTION COMPANY GENERAL CONTRACTOR CHANGE ORDER PROPOSAL FORM PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: JULY 13, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 37 DESCRIPTION OF CHANGE OF THE WORK: ADDITIONAL WORK DUE TO INSUFFICIENT CLG CLEARANCE NOTES: 1. WORK REQUESTED REQUIRES FIVE (5) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM ITEM OWNER PRESENTATIVE d7 41 PR D�� DATE l /5... at *" ova QUAN COST SUB MATERIAL LABOR TOTAL REQD TOTAL AMOUNT OF LABOR/MATERIALS /SUBCONTRACTOR.... INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% SUBTOTAL 3698 PLUS 5% FOR SUBCONTRACTOR WORK 181 PLUS 15% FOR PRIME CONTRACTOR WORK 11.7 ADJUSTMENT -0.7 TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL Page 1 NIDER CONSTRUPTION COMPANY (512) 2886030 P.O. BOX 90818 AUSTIN, TEXAS 78709-0818 FAX (512) 288-6440 3698 0 1 $ 3,890.00 t 47 z' -99 GREGORY L. WARD DATE VICE PRESIDENT 0 0 0 0 0 0 0 0 0 0 MECHANICAL 3620 0 0 3620 0 0 0 0 0 0 0 0 BOND PREMIUM 0 78 0 78 0 0 0 0 0 0 SUBTOTALS 3620 78 0 3698 S C. P. SNIDER CONSTRUCTION COMPANY GENERAL CONTRACTOR CHANGE ORDER PROPOSAL FORM PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: JULY 13, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 37 DESCRIPTION OF CHANGE OF THE WORK: ADDITIONAL WORK DUE TO INSUFFICIENT CLG CLEARANCE NOTES: 1. WORK REQUESTED REQUIRES FIVE (5) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM ITEM OWNER PRESENTATIVE d7 41 PR D�� DATE l /5... at *" ova QUAN COST SUB MATERIAL LABOR TOTAL REQD TOTAL AMOUNT OF LABOR/MATERIALS /SUBCONTRACTOR.... INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% SUBTOTAL 3698 PLUS 5% FOR SUBCONTRACTOR WORK 181 PLUS 15% FOR PRIME CONTRACTOR WORK 11.7 ADJUSTMENT -0.7 TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL Page 1 NIDER CONSTRUPTION COMPANY (512) 2886030 P.O. BOX 90818 AUSTIN, TEXAS 78709-0818 FAX (512) 288-6440 3698 0 1 $ 3,890.00 t 47 z' -99 GREGORY L. WARD DATE VICE PRESIDENT OWNEB,REPRESENTATIVE APP /ED (° wadi/ CII [ OPT C. P. SNIDER CONSTRUCTION COMPANY ITEM GENERAL CONERACIDR CHANGE ORDER PROPOSAL FORM PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: JULY 21, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 38 DESCRIPTION OF CHANGE OF THE WORK: ADDITIONAL ELECTRICAL WORK FOR CITY REQUIREMENTS NOTES: 1. WORK REQUESTED REQUIRES ONE (1) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM QUAN COST SUB MATERIAL LABOR TOTAL REQD TOTAL AMOUNT OF LABOR/MATERIALS /SUBCONTRACTOR.... 1249.43 INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% SUBTOTAL PLUS 5% FOR SUBCONTRACTOR WORK PLUS 15% FOR PRIME CONTRACTOR WORK ADJUSTMENT TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL Page 1 C. P /SUIDER CONSTRJICTION COMPANY (512) 288-6030 P.O. BOX 90818 AUSTIN, TEXAS 78709-0818 FAX (512) 288 -6440 0 1249.43 61.5215 2.85 0.2 � $ 1,314.00) 7- z 99 DATE GREGORY L. WARD DATE VICE PRESIDENT 0 0 0 0 0 0 0 0 0 0 ELECTRICAL 930.43 0 0 930.43 PAINTING 300 0 0 300 0 0 0 0 BOND PREMIUM 0 19 0 19 0 0 0 0 0 0 SUBTOTALS 1230.43 19 0 1249.43 OWNEB,REPRESENTATIVE APP /ED (° wadi/ CII [ OPT C. P. SNIDER CONSTRUCTION COMPANY ITEM GENERAL CONERACIDR CHANGE ORDER PROPOSAL FORM PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: JULY 21, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 38 DESCRIPTION OF CHANGE OF THE WORK: ADDITIONAL ELECTRICAL WORK FOR CITY REQUIREMENTS NOTES: 1. WORK REQUESTED REQUIRES ONE (1) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM QUAN COST SUB MATERIAL LABOR TOTAL REQD TOTAL AMOUNT OF LABOR/MATERIALS /SUBCONTRACTOR.... 1249.43 INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% SUBTOTAL PLUS 5% FOR SUBCONTRACTOR WORK PLUS 15% FOR PRIME CONTRACTOR WORK ADJUSTMENT TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL Page 1 C. P /SUIDER CONSTRJICTION COMPANY (512) 288-6030 P.O. BOX 90818 AUSTIN, TEXAS 78709-0818 FAX (512) 288 -6440 0 1249.43 61.5215 2.85 0.2 � $ 1,314.00) 7- z 99 DATE GREGORY L. WARD DATE VICE PRESIDENT OWNER PRESENTATIVE P ROWED ? &/ a+? O12.1C- C. P. SNIDER CONSTRUCTION COMPANY GENERAL CONTRACTOR CHANGE ORDER PROPOSAL FORM PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: JULY 21, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 39 DESCRIPTION OF CHANGE OF THE WORK: PROVIDE TWO EXIT DEVICES AT STOREFRONT NOTES: 1. WORK REQUESTED REQUIRES ONE (1) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM ITEM QUAN COST SUB MATERIAL LABOR TOTAL REQD TOTAL AMOUNT OF LABOR/MATERIALS /SUBCONTRACTOR INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% SUBTOTAL PLUS 5% FOR SUBCONTRACTOR WORK PLUS 15% FOR PRIME CONTRACTOR WORK ADJUSTMENT TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL DATE Page 1 DER CONSTR CTION COMPANY (512) 2886020 P.O. BOX 90618 AUSTIN. TEXAS 78709-0618 FAX (512) 2886440 1336 0 1336 64.45 7.05 0.5 1 $ 1,408.00 I %7 7- 2e ?� GREGORY L. WARD DATE VICE PRESIDENT 0 0 0 0 0 0 0 0 0 0 STOREFRONT@ DOOR 32 600 0 0 600 STOREFRONT @ DOOR 12 500 0 0 500 CUT THRESHOLDS FOR TILE 189 0 0 189 BOND PREMIUM 0 47 0 47 0 0 0 0 0 0 SUBTOTALS 1289 47 0 1336 OWNER PRESENTATIVE P ROWED ? &/ a+? O12.1C- C. P. SNIDER CONSTRUCTION COMPANY GENERAL CONTRACTOR CHANGE ORDER PROPOSAL FORM PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: JULY 21, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 39 DESCRIPTION OF CHANGE OF THE WORK: PROVIDE TWO EXIT DEVICES AT STOREFRONT NOTES: 1. WORK REQUESTED REQUIRES ONE (1) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM ITEM QUAN COST SUB MATERIAL LABOR TOTAL REQD TOTAL AMOUNT OF LABOR/MATERIALS /SUBCONTRACTOR INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% SUBTOTAL PLUS 5% FOR SUBCONTRACTOR WORK PLUS 15% FOR PRIME CONTRACTOR WORK ADJUSTMENT TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL DATE Page 1 DER CONSTR CTION COMPANY (512) 2886020 P.O. BOX 90618 AUSTIN. TEXAS 78709-0618 FAX (512) 2886440 1336 0 1336 64.45 7.05 0.5 1 $ 1,408.00 I %7 7- 2e ?� GREGORY L. WARD DATE VICE PRESIDENT PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: AUGUST 23, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 40 DESCRIPTION OF CHANGE OF THE WORK: PROVIDE ADDITIONAL SIGNAGE NOTES: 1. WORK REQUESTED REQUIRES TWO (2 ) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM $ C. P. SNIDER CONSTRUCTION COMPANY GENERAL CONTRACTOR ITEM OWNE EPRESENTATIVE ItVED CHANGE ORDER PROPOSAL FORM QUAN COST SUB MATERIAL LABOR TOTAL REQD TOTAL AMOUNT OF LABOR /MATERIALS /SUBCONTRACTOR INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% SUBTOTAL 1227.35 PLUS 5% FOR SUBCONTRACTOR WORK 0 PLUS 15% FOR PRIME CONTRACTOR WORK 184.1025 ADJUSTMENT -0.45 TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL Page 1 C. P. pADER CONSTRUC ION COMPANY (512) 288$030 P.O. BOX 90818 AUSTIN, TEXAS 78709 -0818 FAX (572) 288 -6440 0 $ 1,411.00 774, 71 AO ? DATE G EGORY L. WARD DATE VICE PRESIDENT 0 0 0 0 0 0 0 0 0 0 SIGNAGE 0 1200.35 0 1200.35 0 0 0 0 0 0 0 0 BOND PREMIUM 0 27 0 27 0 0 0 0 0 0 SUBTOTALS 0 1227.35 0 1227.35 PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: AUGUST 23, 1999 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 40 DESCRIPTION OF CHANGE OF THE WORK: PROVIDE ADDITIONAL SIGNAGE NOTES: 1. WORK REQUESTED REQUIRES TWO (2 ) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDITIONAL ITEM $ C. P. SNIDER CONSTRUCTION COMPANY GENERAL CONTRACTOR ITEM OWNE EPRESENTATIVE ItVED CHANGE ORDER PROPOSAL FORM QUAN COST SUB MATERIAL LABOR TOTAL REQD TOTAL AMOUNT OF LABOR /MATERIALS /SUBCONTRACTOR INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% SUBTOTAL 1227.35 PLUS 5% FOR SUBCONTRACTOR WORK 0 PLUS 15% FOR PRIME CONTRACTOR WORK 184.1025 ADJUSTMENT -0.45 TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL Page 1 C. P. pADER CONSTRUC ION COMPANY (512) 288$030 P.O. BOX 90818 AUSTIN, TEXAS 78709 -0818 FAX (572) 288 -6440 0 $ 1,411.00 774, 71 AO ? DATE G EGORY L. WARD DATE VICE PRESIDENT DATE: September 17, 1999 SUBJECT: City Council Meeting — September 23, 1999 ITEM: 10.D.2. Consider a resolution authorizing the Mayor to execute Change Order No. 2, for the Library Building & Remodel Project with C.P. Snider Construction Company. The change order is in the amount of an additional $15,624.00 to the contract and is funded from the GO Bond Projects. These additions include additional fury downs for fire extinguishers, additional light fixtures, added concrete curbs, relocation of fire alarm panel, additional mechanical and electrical work, two additional exit devices at exterior doors, and proposal for additional signage. The breakdown of these items are shown on the change order form provided by the architect for the project and signed for approval by architect and contractor. Staff Resource Person: Dale Ricklefs, Library Director.