R-99-09-23-10E8 - 9/23/1999Mayor
Robert A. Srhtka, Jr
Mayor Pro-tem
Martha A. Chavez
Council Members
Tom Nielson
Earl M. Hairston
Rick Stewart
Earl Palmer
Jimmy Joseph
City Manager
Robert L. Bennett, Jr.
City Attorney
Stephan L. Sheets
CITY OF ROUND ROCK
October 7, 1999
Matous Construction, Co., Ltd.
P.O. Box 5258
Temple, Texas 76505
Dear Sirs:
The Round Rock City Council approved Resolution No. R- 99- 09- 23 -10E8 at their
regularly scheduled meeting on September 23, 1999. This resolution approves Change
Order No. 1 to the contract for the Southeast Elevated Tank Pump Station and Site
Improvements, Contract No. 2.
Enclosed is a copy of the resolution and Change Order for your files. If you have any
questions, please do not hesitate to contact Steve Miller at 218 -5555.
Sincerely,
oanne Land
Assistant City Manager/
City Secretary
Enclosures
Fax: 512- 218 -7097
221 East Main Street
Round Rock. Texas 78664
512 -218 -5400
1 -800- 735 -2989 TDD 1 -800- 735 -2988 Voice
www.ci.rouad- rock.tx.us
CITY OF ROUND ROCK
Mayor
Robert A. Muhl. Jr.
Mayor Pro-tem
Martha A. Chavez
Council Members
Tom Nielson
Earl M. Hairston
Rick Stewart
Earl Palmer
Jimmy Joseph
City Manager
Robert L Bennett, Jr
City Attorney
• Stephan L Sheets
October 7, 1999
HDR Engineering, Inc.
2211 South IH 35. Ste 300
Austin, TX 78738
Dear Sirs:
The Round Rock City Council approved Resolution No. R- 99- 09- 23 -10E8 at
their regularly scheduled meeting on September 23, 1999. This resolution
approves Change Order No. 1 to the contract with Matous Construction
Company for the Southeast Elevated Tank Pump Station and Site
Improvements, Contract No. 2.
Enclosed is a copy of the resolution and Change Order for your files. If you
have any questions, please do not hesitate to contact Steve Miller at 218 -5555.
Sincerely, nw c j�
6 4. ., 4
J oanne Land
Assistant City Manager/
City Secretary
Enclosures
Fax; 512- 218 -7097
221 East Main Street
Round Rock, Texas 78664
512 -218 -5400
1- 800 - 735 -2989 TDD 1- 800 - 735 -2988 Voice
www.ci.round- rock.tx.us
RESOLVED this 23rd day of Se , � u:•r, 19.9
RO: RT A. STLUKA, 9. , Mayor
A EST: City of Round Rock, Texas
/10 44 JL f.. ii i
RESOLUTION NO. R- 99- 09- 23 -10E8
WHEREAS, the City of Round Rock has previously entered into a
contract ( "Contract ") with Matous Construction Company for the
Southeast Elevated Tank Pump Station & Site Improvements, Contract No.
2, and
WHEREAS, it has been determined that it is necessary to change
said Contract in accordance with the attached Contract Change Order No.
1, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Contract Change Order No. 1 to the Contract with
Matous Construction Company for the Southeast Elevated Tank Pump
Station & Site Improvements, Contract No. 2.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended, and the Act.
E LAND, City Secretary
K = \WPDCCS \RESOLtrr \R90923E0 WP0 /scg
CPR No.
Item and Description of Changes
Contract Price
Contract Time
Decrease
Increase
Decrease
Increase
1
No -Go proposal to perform modifications at Well Site
No. 9.
0
0
0
0
2
Modify overflow piping at 81 North Standpipe.
0
532.00
0
1
sub -Total
Difference Net
0
532.00
0
1
0
532.00
0
1
Protect Name:
City of Round Rock Water System Improvements
Contract No. 2 — Southeast Elevated Pump Station
Project Owner: (Name, Address)
City of Round Rock, Texas
2008 Enterprise Dr.
Round Rock, Texas 78664
Project Contractor: (Name. Address)
Matous Construction Co., Ltd.
P.O. Box 5258
Temple, Texas 76505
It is agreed to modify the Contract referred to above as follows:
1 5515,000.00
Net Increase (decrease) of this Change Order
1 5532.00
Revised Contract Price with all approved Change Orders
1 5515, 532.00
Accepted for Contractor by:
Recommendgd for Ap
Approved for 0 nor b y'.
Distribution:
FORM 111 - 5020 -2 (Version 1,0 Dct 90)
Copyright 1991 HDR Gginceriag, Inc.
Engineering. Inc.)
hen reguiredl
L _ J Dwner
'Contractor
HDR Project No.:
07225 036 - 036 - 02
Owner's Project No.:
N/A
Date of Issuance: August 18, 1999
Date of Contract: March 11, 1999
Contract Period: 180 Days
Change Order'No. 1
Summary: It is agreed to modify the Contract referred to above as follows:
Contract Price prior to this Change Order Contract Time prior to this Change Order
The changes included in this Change Order ere to be accomplished in accordance with the terms, stipulations and conditions of the
origins Contract as hou inclu therein.
(October 7, 1999 (180 days)
Net Increase (decrease) of this Change Order
11 days
Revised Contract Time with all approved Change Orders
(October 8, 1999 (181 days)
Task 5020
g — zy -9q
Date
Attest Date
kOrld 9 - 1 3 - 99 I
Date
lOflice 1 (Field
I 9.z.9y
Date
I I
'Other
111 - 5020 -2
Matous Construction Co., Ltd.
P.O. Box 5258
Tcmple, Texas 76SOS
All work snarl be in aceordunce with the terms, stipulatlenc and
conditions of the original Contract Documents. It the work herein
provided for is Approved be Change Order. the time Of completion
will be:
of: _ Decreased _ unchanged
b k calendar days.
ppr74 pwolo-]
.p ,wt sow F eaeMr„ We,
9
task tela
Mined bv:
. Prop. no. le eeoauelel;
AIWA/wry Agerns Project No. (al sr,lde.fe�el:
: tngineet _ Con,r.c,e,
HOA Recommendation:
This change will_ f' Ado _ Deduct _ Net Orange OWr S Action:
S +pia. ?I's. _ Ac, yrcd we
MA1 i' Gw+sT, LTV' 1 45 1
Dtncml Contractor eyi Owner
Ir"w CO_ 2( -9q ( P 1
Change Proposal
Request No. 2
(Not a Change Order)
P.eicat Nome.
City of Round Rock Water System Imp.
Contract No. 2 Southeast Elevated Pump Station
& Site Improvements
vrolecr a.m.; City of Round Rock, Texas
HOA Proian No.: 07225. 036 -036-02 c , f/
Owner
roc
Attention:
The felrowinp change in the convect on this oreiee;t in prepesed_
A breakdown of cost SHALL ha attached.
- Work shell not commence until authorized by tho Owner.
Description or the Propoced Change:
Provide all labor, materials, and equipment to add or delete the Work identified within this CPR. Provide
proposal identifying costs associated with labor, materiels, Contractor's Overhead and Profit all separately
i dentified.
1. Modify the existing overflow piping at the 81 N Standpipe to direct flow in a more downward direction
and at the energy dissipating splash pad that has been constructed. Consider angle deflection on
piping to ensure that flap gate will continue to seat fully and not pose a problem with gapping. After
welding has been completed, prepare surface of steel and reeoat in accordance with Section 09906 -
color to match tank as Tnemee - Cloud. Coordinate thin ork withCity's field representative.
DATE: September 17, 1999
SUBJECT: City Council Meeting — September 23, 1999
ITEM: 10.E.8. Consider a resolution authorizing the Mayor to execute Change
Order No. 1, for the Contract No. 2 — Southeast Elevated Pump
Station project by Matous Construction Company. This project
installed a bypass PRV valve at the North 81 Standpipe, during the
course of this construction the overflow pipe discharge end was
modify to empty overflow water closer to the ground. The amount of
the change order is $532.00 with an additional 1 -day extension. Staff
recommends approval. Staff Resource Person: Jim Nuse, Public Works
Director.