R-99-10-28-10E4 - 10/28/1999 HOT
HOT INSPECTION SERVICES,INC. P.O.Box 1208 Round Rock,Tx 78680
Welding Consultants&inspection Specialists (512)244-2523 FAX(512)244-0607
�ri„ sE°°•
STRUCTURAL STEEL INSPECTION PROPOSAL
ROUND ROCK EXPRESS STADIUM AND CONVENTION CENTER
The following proposal is for services to be provided to the City of Round Rock for
performing the structural inspection of the referenced project. All inspections will be
performed on an as needed basis to maintain pace with the fabrication and erection
schedule. John H.Konzen,CWI-NDE level III will conduct all of the inspections on behalf
of HOT Inspection Services,Inc.
To insure compliance with the standard building code,AISC,contract specifications and
AWS the following scope of services will be provided.
1. Visual inspections of all bolted and welded connections.
2. Mil Test reports on the structural steel are required for all structural steel.
3. Detailed structural drawings stamped by a registered professional engineer shall be
available to the inspector at the jobsite.
4. .hou and Fidd Welders shall be qualified in accordance with AWS D1.1 and AWS
D1.3. Proper documentation(WQR's)shall be submitted for review and approval prior
to any welding on the project.
5. Unless specified otherwise by contract specifications or design drawings,joists will
meet SJI(Steel Joist Institute)specifications and a letter of certification from
the manufacturer will be required.
6. Visual inspections of the welding will require proper weld preparation and cleaning.
7. Any full penetration weldments shall be approved by HOT upon completion of fit-up
and then Non destructively tested in accordance with the engineering specifications or at
a minimum of 25%of the total welded connections. The testing shall be conducted by
an approved Testing Laboratory other than HOT Inspection Services.
8. Any deviation from the design drawings and job specifications shall require written
approval from the Engineer of Record.
COSTOF SERVICE........................................................................................$16,400.00
The above scope of services and cost includes:
1.6 site visits to the fabricator's shop in Waco,Texas.
2.64 site visits to the stadium site in Round Rock,Texas.
3.Travel time and mileage to Waco,Texas.
4.All visual inspection and bolting required by standard code.
5.Verbal communication with building inspection dept.and R.D.Sneed.
6.Inspection reports as deemed necessary for reporting compliance issues.
7.Final inspection report at completion of structural project.
tt ed b Accepted by:
o nzen Ma or o rt tl ,Jr.
H pecti ices,Inc. City of Round Rock
���
A��
ttP rip
r ' CITY OF ROUND ROCK
�', i � 221 Eas[Main Street
0* Round Rock,Texas 78664
�.y H�ptt 512-218-5400
December 1,1999
Mr.John H.Konen,CWI,President
Hot Inspection Services,Inc.
P.O.Box 1208
Round Rock,Texas 78680
Dear N*Wen:
The Round Rock City Council approved Resolution No. R-99-10-28-10E4 at
their regularly scheduled meeting on October 28, 1999. This resolution
authorizes a Structural Steel Inspection Agreement for the Convention Center
Complex/Stadium Project.
Enclosed is a copy of the resolution and proposal for your files. If you have
any questions,please do not hesitate to call Jim Nuse at 218-5555.
Sincerely,
J anne Land
Assistant City Manager/
City Secretary
Mayor
Robert A.Stfuka,Jr
Mayor Pro-ter
Mnha A.cha— Enclosures
council Merbers
Tam Nielson
Earl M.Hairston
Rick Stewart
Earl Palmer
Jimmy Joseph
City Manager -
Robert L Bennett,Jr.
City Attorney Fax:512-218-7097 1-800-735-2989 TDD I-800-735-2988 Voice
an
Steph L Sheets www.ci.round-rock.tx.us
RESOLUTION NO. R-99-10-28-10E4
WHEREAS, the City of Round Rock desires to retain inspection
services in connection with the Convention Center Project, and
WHEREAS, HOT Inspection Services, Inc. has submitted an
inspection proposal to provide said services, and
WHEREAS, the City Council desires to approve said proposal, Now
Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City an inspection proposal with HOT Inspection Services,
Inc. for inspection services in connection with the Convention Center
Project, a copy of said proposal being attached hereto and incorporated
herein for all purposes.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended, and the Act.
RESOLVED this 28th day of Oct 999.
RO RT A. STLUKA, Mayor
T T• City of Round Rock, Texas
J E LAND, City Secretary
K:\WRDOCS\RESOLI I\R9102084.WP/seg
HOT INSPECTION SERVICES,INC. P.O.Box 1208 Round Rock,Tx 78680
HOT welding Consultants&Inspection Specialists (512)244-2523 FAX(512)244-0607
STRUCTURAL STEEL INSPECTION PROPOSAL
ROUND ROCK EXPRESS STADIUM AND CONVENTION CENTER
The following proposal is for services to be provided to the City of Round Rock for
performing the structural inspection of the referenced project. All inspections will be
performed on an as needed basis to maintain pace with the fabrication and erection
schedule. John H.Konzen,CWI-NDE level III will conduct all of the inspections on behalf
of HOT Inspection Services,Inc.
To insure compliance with the standard building code,AISC,contract specifications and
AWS the following scope of services will be provided.
1. Visual inspections of all bolted and welded connections.
2. Mil Test reports on the structural steel are required for all structural steel.
3. Detailed structural drawings stamped by a registered professional engineer shall be
available to the inspector at the jobsite.
4. Shop and Field Welders shall be qualified in accordance with AWS D1.1 and AWS
D1.3. Proper documentation(WQR's)shall be submitted for review and approval prior
to any welding on the project.
5. Unless specified otherwise by contract specifications or design drawings,joists will
meet SA(Steel Joist Institute)specifications and a letter of certification from
the manufacturer will be required.
6. Visual inspections of the welding will require proper weld preparation and cleaning.
7. Any full penetration weldments shall be approved by HOT upon completion of fit-up
and then Non destructively tested in accordance with the engineering specifications or at
a minimum of 25°/o of the total welded connections. The testing shall be conducted by
an approved Testing Laboratory other than HOT Inspection Services.
8. Any deviation from the design drawings and job specifications shall require written
approval from the Engineer of Record.
COSTOF SERVICE........................................................................................$16,400.00
The above scope of services and cost includes:
1.6 site visits to the fabricator's shop in Waco,Texas.
2.64 site visits to the stadium site in Round Rock,Texas.
3.Travel time and mileage to Waco,Texas.
4.All visual inspection and bolting required by standard code.
5.Verbal communication with building inspection dept.and R.D.Sneed.
6.Inspection reports as deemed necessary for reporting compliance issues.
7.Final inspection report at completion of structural project.
A ;by'J n H.K zen ert .Stlulfd,Jr.
OT Ins ction Se ices,Inc. City of Round Rock
DATE: October 21,1999
SUBJECT: City Council Meeting—October 28,1999
ITEM: 10.11.4. Consider a resolution authorizing the Mayor to enter into a
Structural Steel Inspection Agreement with HOT Inspection
Services for the Convention Center Complex/Stadium Project.
Staff Resource Person:Jim Nuse,Public Works Director.