R-99-10-28-10E7 - 10/28/1999RESOLUTION NO. R- 99- 10- 28 -10E7 WHEREAS, in order to increase electrical services for the new pump station planned for the Lake Georgetown raw water intake structure, the City of Round Rock wishes to relocate electric lines and facilities at this location, and, WHEREAS, the City desires to enter into a Relocate Facilities Contract with Pedernales Electric Cooperative, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a Relocate Facilities Contract with Pedernales Electric Cooperative, Inc., to relocate electric lines and facilities at the Lake Georgetown raw water intake structure, a copy of said contract being attached hereto and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. K:\ WPOOCS \RESOLUTI \R9102EE].WPD /seg RESOLVED this 28th day of October, 1999. E LAND, City Secretary 2 City of Round Rock, Texas 1I, ■6'bewe i4.s1ler—liwriEl∎ -f.er he City of Round Rock, agreesto pay the estimated cost of $5,657.09 for relocating Pedernales Electric Cooperative, Inc. lines and facilities provided that conditions of the Line Extension Policy are met. I understand these facilities will be relocated at the option of the Cooperative according to the following policy: "Service to other consumers, both present and prospective, will not be adversely affected. Easements on the Cooperative's standard form covering rights -of -way for the relocated lines or facilities are granted to the Cooperative. The consumer pays in advance to the Cooperative the total estimated cost of removing the existing lines and facilities and replacing them with lines and facilities in the new location. The cost will be based on the standard unit cost as reflected by the most current construction cost records of the Cooperative. The amount to be so paid shall be nonrefundable." All of the facilities to be installed shall be owned and controlled solely by the Cooperative. ST:js C09 -GL /3 W.O. No. RELOCATE FACILITIES CONTRACT P.O. Box 449 Bertram, Texas 78605 -0449 (512)355 -2131 •1-888 -554 -4732 /D -.2s- 99 Date Date Bertram • Canyon Lake • Cedar Park • Dripping Springs • Johnson City • Kyle /Buda • Lake Creek • Lake Travis • Manchaca • Marble Falls Pedernales Electric ti P.O. Box 449 Bertram, Texas 78605 -0449 (512) 355 -2131 • 1- 888 -554 -4732 October 1, 1999 Mr. Steve Miller P.E. City of Round Rock 2008 Enterprise Dr. Round Rock, Texas 78664 Dear Mr. Miller: Your recent request for line alterartion is covered by the Cooperative's Line Extension Policy. This policy provides service to all applicants, even when the investment in lines and equipment is greater than the return will justify. It is necessary that the consumer requesting such service pay a portion of the costs. Please complete the enclosed Relocate Facilities Contract, and return it with your payment of $5,657,09 in the envelope provided. Construction will begin within 90 days and will take approximately 5 days to complete. The Cooperative appreciates the opportunity to serve you. If you have any questions, please call the Bertram office at (512) 355 -2131 or 1- 888 -554 -4732. Sincerely, Sandra Tayl Northern District Engineering Coordinator ST:js C07/3 Enclosures Bertram • Canyon Lake • Cedar Park • Dripping Springs • Johnson City • Kyle /Buda • Lake Creek • Luke Travis • Manchaca • Marble Falls DATE: October 21, 1999 SUBJECT: City Council Meeting — October 28, 1999 ITEM: 10.E.7. Consider a resolution authorizing the Mayor to execute an agreement with Pedernales Electric Cooperative, Inc. for relocation of facilities at the Lake Georgetown raw water intake structure. The contract is for $5,657.00 and is to increase the electrical service for the new pump station planned for this location. Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director.