Loading...
R-99-12-09-13E5 - 12/9/1999RESOLUTION NO. R- 99- 12- 09 -13E5 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Westport Group, Inc. for the construction of Fire Station No. 5, Deepwood Site, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with Westport Group, Inc. for the construction of Fire Station No. 5, Deepwood Site. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 9th day of Dec , 1999. A. STLUKA(,/ JR., Mayor ST: City of Round Rock, Texas E LAND, City Secretary K:\ WPUOCS \RESOLUTI \R91209ES.WPO /sc Change Order AIA Document G701 - Electronic Format THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. PROJECT: (name, address) Round Rock Fire Station Number Five 400 Deepwood Drive Round Rock, Texas 78681 TO CONTRACTOR: (name, address) We Group.. Inc. 13740 Research Blvd. Suite A -1 Austin, Texas 78750 The Contract is changed as follows: Delete Asphalt Paving at Parking and Drives per CCD #3 Not valid until signed by the Owner, Architect and Contractor. The original (Contract Sum) ( was $ 847,381,00 Net change by previously authorized Change Orders $ 0.00 The (Contract Sum) ( ) prior to this Change Order was $ 847 381.00 The (Contract Sum) ) will be (used) (decreased) (nnellanged) by this Change Order in the amount of $ - 17,000.00 The new (Contract Sum) ( ) including this Change Order will be $ 830.381.00 The Contract Time will be (increased) () (unchanged) by Zero (0 ) days. The Date of Substantial Completion as of the date of this Change Order therefore is NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed maximum Price which have been authorized by Construction Change Directive, ARCHITECT CONTRACTOR J. Michael Faulk Architects Westport Group, Inc. Address Address 8905 Joachim Lane 13740 Research Blvd. S e Round Rock, Texas 7 17 Austi BY1 c� BY: DATE: 11/10Alct DA _ / % , / ,Jd OWNER ARCHITECT CONTRACTOR FIELD OTHER CHANGE ORDER NUMBER: One (1) DATE: 11/30/99 ARCHITECT S PROJECT NO: 840 CONTRACT DATE: 5/27/99 CONTRACT FOR: General Construction OWNER City of Round Rock, Texas Address 221 DATE: in Stree [x] [X] [X [1 [1 AIA DOCUMENT 0701 • CHANGE ORDER • 1987 EDITION • AIA • COPYRIGHT 1987 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C., 20006 -5292. WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the ALA and can be reproduced without violation until the date of expiration as noted below. Electronic Format - G701 -1987 User Document: G701.CON -- 12/1/1999. AIA License Number 105784, which expires on 8/6/2000 -- Page #1 DATE: December 3, 1999 SUBJECT: City Council Meeting — December 9, 1999 ITEM: 13.E.5. Consider a resolution authorizing the Mayor to execute a Contract Change Order No. 1 for Fire Station #5 with Westport Group, Inc. A deduction of $17,000 for the deletion of asphalt paving and base material for the driveways. Asphalt paving is being replaced with concrete paving as it is felt the concrete paving will stand up better to fire truck traffic and we will not have a maintenance problem with the driveways. Architect, Mike Faulk, has reviewed this deduction and agrees with the amount. Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director.