Loading...
CM-2015-803 - 6/5/2015STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: Klotz Associates, Inc. ("Engineer") ADDRESS: 901 South Mom Expressway Building V, Suite 220, Austin, TX 78746 PROJECT: Cypress Boulevard Reconstruction This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Klotz Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 28th day of March, 2013 for the Cypress Boulevard Reconstruction Project in the amount of $212,156.45; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on September 12, 2014 to amend the scope of services and to increase the compensation by $24,930.72 to a total of $237,087.17; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $5,360.00 to a total of $242,447.17; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. II. Article 2, Engineering e�enmg Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Supplemental Contract Rev. 12/01/08 0199.1365; 00335469 94275 Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $5,360.00 the lump sum amount payable under the Contract for a total of $242,447.17, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. KLOTZ ASSOCIATES, INC. Date CITY O,yRO"ROC APP O EDA TO F RM: Adan ITIc6ra , r LA&, -7 ttsZlk, CayStep n 1. Sheets, City Attorney Date Supplemental Contract Rev. 12/01/08 0199.1365;00335469 84275 ADDENDUM TO EXHIBIT A City Services PROJECT DESCRIPTION Existing Facility The existing road section consists of a median divided four -lane section of asphalt concrete pavement with closed storm sewer drainage. The existing right-of-way is approximately 80' wide. Proposed Facility The proposed roadway will be a new location median divided four -lane section with 100' of Right of Way (ROW). The proposed road will include the improvement of the intersections of Cypress Cove and Sunrise Road at Eagles Nest Street. The drainage will be closed storm sewer drainage. The project will include the realignment of a portion of existing Cypress Boulevard and the demolition of the existing roadway that parallels the new location roadway. The project will be let for construction by the CITY. In conjunction with the services to be provided by the ENGINEER, as described in Exhibit B, the CITY shall provide the following, as available: I. CONSTRUCTION 1. CITY shall attend construction progress meetings and maintain general construction oversight. 2. CITY shall relay approvals for local, regional, state and federal agencies and provide assistance, as necessary, to obtain necessary data, information, and approvals from the various agencies and utility companies. ADDENDUM TO EXHIBIT B Engineering Services PROJECT STATEMENT Cypress Boulevard is a project being developed by the City of Round Rock (the "CITY"). PROJECT DESCRIPTION Existing Facility The existing road section consists of a median divided four -lane section of asphalt concrete pavement with closed storm sewer drainage. The existing right-of-way is approximately 80' wide. Proposed Facility The proposed roadway will be a new location median divided four -lane section with 100' of Right of Way (ROW). The proposed road will include the improvement of the intersections of Cypress Cove and Sunrise Road at Eagles Nest Street. The drainage will be closed storm sewer drainage. The project will include the realignment of a portion of existing Cypress Boulevard and the demolition of the existing roadway that parallels the new location roadway. The project will be let for construction by the CITY. The services listed below are in addition to the approved scope of services defined in the original contract executed on March 28, 2013 for the Cypress Boulevard Reconstruction Project. Site Visits. The ENGINEER will perform additional construction field visits and progress meetings required to complete the construction project. Construction time to complete the project has been extended approximately 4 months due to utility relocations which required additional progress meetings. Charges for these additional meetings include meeting time, preparation of meeting minutes, coordination with City and utility companies, review of pay estimates and travel charges beyond the original project budget allowance. ADDENDUM T4 EXHIBIT C Work Schedule Attached Behind This Page EXHIBIT C Work Schedule Project Schedule 2014 2015 Apr May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June Design Wastwater Utility Drawings Utility Coordination SCS Calculations SCS Report Misc - Specs/Estimates Final PS&E Package Submission A rovals Original Time Determination TCEQ - SCS CORR Construction Cypress Boulevard -City of Round Rock 5/21/15 Page I of 1 Exhibit C ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page EXHIBIT D FEESCHEDULE Cypress Boulevard Reconstruction - Supplemental City of Round Rock Cypress Boulevard - City of Round Rock 5/21/2015 Page I of 1 Exhibit D FEE SUMMARY DESCRIPTION KLOTZ ASSOCIATES LOCHNER INLAND TOTAL COSTS BY FC CONSTRUCTION PHASE SERVICES S5,000.00 $5,000.00 DIRECTEXPENSES $360 $360.00 LABOR EXPENSES SUBTOTAL 1 $5,360.00 $0.00 $0.00 1 $5,360.00 Cypress Boulevard - City of Round Rock 5/21/2015 Page I of 1 Exhibit D City of Round Rock Cypress Boulevard - Supplemental Klotz Associates Cypress Blvd. Supplemental - Klotz Associates Sr. Project Manager Project Manager Sr. Engineer Project Engineer I Err I CADD Tech Admin. Assistant Total Hours Total Fee Contract Rate $200.00 $175.00 $150.00 $130.00 $100.001 $85.00 1 $65.00 Construction Phase Services Attend Project Progress Meetings 6 12 18 _$2400.00 Prepare Project Progress Meeting Notes 1 6 7 $800.00 Review Pay Submittals 1 4 5 $600.00 Coordination with City Staff 2 8 10 $1,200.00 Subtotal Hoursl 10 1 0 1 0 1 0 1 30 0 0 40 Subtotal Cost 2,000.00 0.00 0.00 0.00 3,000.00 0.00 0.00 $5,000.00 Direct Expenses Mileage 11" x 17" Reproduction Construction Plans Total Direct Expenses Costs Total Manhour Costs Unit 500 200 Unit cost $0.56 $0.40 $360.00 $5,000.00 Total $280.00 $80.00 Klotz Associates Additional Services Project Costj 1 $5,360.00 5/21/2015 Page 1 City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 2 with Klotz Associates, Inc. for the Cypress Boulevard Reconstruction Project. Type: City Manager Item Governing Body: City Council Agenda Date: 6/5/2015 Dept Director: Gary D. Hudder Cost: Indexes: Attachments: SC#2 w -Klotz Associates - Cypress Blvd Reconstruction (00335469xA08F8) Department: Transportation Department Text of Legislative File CM -2015-803 City of Round Rock Page 1 Printed on 61512015 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Transportation Project Mgr/Resource: Bill Stablein Council Action: 0 ORDINANCE Agenda Wording F1 City Manager Approval Project Name: Cypress Boulevard Reconstruction ContractorNendor: Klotz Associates, Inc. RESOLUTION UVIA woraing Consider executing Supplemental Contract No. 2 with Klotz Associates, Inc. for the Cypress Boulevard Reconstruction Project. Attorney Approval [2(Attorney ` Date S12 ? /.� 0:IwdoxISCCInts10199113651MISC100335531.XLS Updated 6/3/08