Contract - Brown and Gay Engineers - 6/26/2014STATE OF TEXAS §
COUNTY OF WILLIAMSON §
SUPPLEMENTAL CONTRACT NO, 3
TO CONTRACT FOR ENGINEERING SERVICES
FIRM: BROWN & GAY ENGINEERS, INC. ("Engineer")
ADDRESS: 7000 N. Monae, Suite 330, Austin, TX 78731
PROJECT: Railroad Quiet Zone Study
This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between
the City of Round Rock, Texas, hereinafter called the "City" and Brown & Gay Engineers, Inc.,
hereinafter called the `Engineer".
WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract", on the.22nd day of March, 2012 for the Railroad Quiet Zone Study Project
in the amount of $149,900.00; and
WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on August 17, 2012
to amend the scope of services and to increase the compensation by $25,123.80 to a total of
$175,023.80; and
WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on June 13, 2013 to
arnend the scope of services and to increase the compensation by $141,700.51 to a total of
$316,724.31; and
WHEREAS, it has become necessary to amend the Contract to modify the provisions for the
scope of services and to increase the compensation by $19,950.00 to a total of $336,674.31;
NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract
is amended as follows:
I.
Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the
attached Addendum, To Exhibit A.
II.
Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set
forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as
set forth in the attached Addendum To Exhibit C.
supplen►ental Contract Rev.12/01/08
0199.1220;00299520 84275
R-2014-1514
Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by
$19,950.00 the lump sum amount payable under the Contract for a total of $336,674.31, as
shown by the attached Addendum to Exhibit D.
IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental
Contract in duplicate.
BROWN - Y ENGINEERS, INC.
By.
f'E�l�� F�✓�o�� r.PEc�R ��Ir'�te
,sly?/141
Date
CITY OWROUND ROCK
By: U M
Alan McGraw, Mayor
(p '2-41c;'l l
Date
Supplemental Contract
0194.1220;00299520
2
APP VED AS TO FORM:
Stepp L. Sheets, City Attorney
Rev. 12101/08
84275
ADDENDUM TO EXHIBIT A
City Services
The City will provide the following:
A. Any mapping or survey information available for the project area.
B. Timely reviews and decisions to maintain the project schedule.
C. Coordination with Union Pacific Railroad.
D. Electronic files for City's Standard Details.
ADDENDUM TO EXHIBIT B
Engineering Services
Preface
The scope of services for this Supplemental Contract No. 3 is to assist the City with
the design of fencing along Bagdad Road- in the vicinity of the Burnet Street railroad
crossing, in connection with fencing agreements between the City and UPRR. The
proposed fencing limits will be as follows:
Approximately 110 feet along the southern boundary of the comer lot at
the southwest corner of Bagdad Avenue and Burnet Road.
• Approximately 1,600 feet along the southern right-of-way line of Bagdad
Avenue, from Burnet Street to S Georgetown Street.
The Engineer will perform the following tasks:
A. Prepare Design Plans
1. Review existing information provided by the City and UPRR and attend
a meeting with the City to discuss project details.
2. Prepare a preliminary layout based on existing information and
aerial photography.
3. Prepare design plans for fence installation. The plans will be on 11x17
plan sheets in accordance with the City of Round Rock design guidelines.
4. Submit plans to the City for review, and address comments from the City.
5. Prepare final plans and include in the RR Quiet Zone plan set for bid.
B. Surveying
1. Perform ROW and utilities search in the vicinity of the project. Contact the utility
companies to have underground utilities marked in the field.
2. Perform field surveys along approximately 110 feet along the southern
boundary of the comer lot at the southwest corner of Bagdad Avenue and Burnet
Road, from the ROW line, a strip 20 feet wide, with cross sections every 50
feet.
3. Perform field surveys along approximately 1,600 feet along the south right-of-
way of Bagdad Avenue (north ROW line of UPRR), a strip 25 feet wide from
Burnet Street to S Black Street, and the fiill ROW width of Bagdad Street from
S Black Street to S Georgetown Street, with cross sections every 50 feet.
4. Prepare a base layout and submit drawings at 1 "=50" scale. Provide electronic
files of the survey files and drawings.
ADDENDUM TO EXHIBIT C
Work Schedule
Task
Anticipated Completion
Date
Anticipated start date
May 20, 2014
Field surveys
June 3, 2014
Preliminary plan
May 27, 2014
Detailed design plans
June 30, 2014
City review
July 15, 2014
Final plans
July 30, 2014
Bid phase
(Under quiet zone project)
ADDENDUM TO EXHIBIT D
Fee Schedule
Attached Behind This Page
EXHIBIT D -FEE SCHEDULE
MANHOURS 13Y CLASSIFICATION & MAJOR TASK
Brown & Gay Engineers, Inc,
Total Cost $19,950.00
Senior
Project
Engineer
DESCRIPTION OF WORK TASK
4 ofProject
Manager
9
Engineer/
(or Sr. Env.
Engineer/
(or Env.
Assistant
Engineering
Tech/CADD
Admin
Assistant
Total Labor
Total Labor
sheets
het
Scientist
Scientist
(EIT)
Hours
Cost per Task
$198.00
$175.00
$145.00'
$95.00
$80.00. $65.00
A Prepare Design Pians
1 1 Review exist Information, attend meeting
8
2 Prepare preliminarylayout
1
3
6
12
8
51.584.00
3 Pre are design plans
3
3
3
16
36
21
$2.424.00
4 Submit plans, address comments
1
2
8
58
$6,319.00
5 Prepare final plans
1
3
11.
$1,128.00
6
10
$1.113.00
B
Surveying See below under Direct Costs
Total Hours
16
3
27
0
62
0
108
Labor Cost Including Multiplier
$ 3,168.00
$ 526.00
$ 3,915.00
$ -
$ 4,960,00
S -
$12,568.00
Total Cost $19,950.00