Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 3 with John
King Construction, Ltd. for the Rabb House Redevelopment Project,
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 7/3/2014
Dept Director: Chad McDowell, General Services Director
Cost: $14,751.13
Indexes: 2007 General Obligation Bonds
Attachments: Change Order NO. 3, LAF
Department: General Services Department
Text of Legislative File CM -2014-450
Various items not included in original plans or were revised to meet needs of project or
building codes. Additional tree lighting, ice maker, rails at Amphitheater, additional stone
blocks.
Staff Recommends Approval
Cost: $14,751.13
City of Round Rock Page 1 Printed on 71312014
LEGAL DEPARTMENT APPROVAL rOR CITU' COUNCIL/CITY MANAGER ACTION
F'11eclt_1i1'ed f6l' Suhlnission or AL.1_ City Council and City Marma jer lioms
Department Name: General Services Project Name: 16bb Clouse Redevelopment.
Project Mgir/Resource: Chad McDowell � ContractorlVendor: John Kigh,Const uctioi1, W.
Council Action:
ORDINANCE EJ RESOLUTION
Agenda Wording
Xx City Manager Approval
LAMA worajng
consider executing Quantity Adjustment/Change Order No. 3 with John King Construction, Ltd. for the Rabb House
2edevelopment Project.
AttorneApproval
r—vls �
Attorney „� Date ( -Z-11(1
Votes/Comments
WwdoxiSCCInts10199\7293\MISMO 0305780.XLS Updated '6/3/08
Contract Quantity Adjustment/Change Order
rev, W]2
Department: General Services
Project
Name: Rabb House Redevelopment
City Project
ID Number
Justification
Pagel of 3
Date: 6/13/14
Change Order/Quantity
Adjustment No. 3
✓arious items not included in original plans or were revised to meet needs of project or building codes.
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price Plus
Quantity Adjustment(s) Plus Change Order(s)):
Difference between Original and Adjusted Contract Prices:
Original Contract Time:
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
New Contract Time:
Amount % Change
$43,170.17 0.02
$14,751.13 0.01
$57,921.30 0.02
Ngz-
$2,453,332 30 ��
3/5/2014
4/30/2014
6/13/2014
6/13/2014
$57,921.30
Signature Printed Name, Title, Company Date
Contractor: John King, President
�Wure S Printed Name, Title, Company City Project
Manager: -��� Chad McDowell Director of General Services 6XI
Signa Printed Name, Title Dat
Mayor/City ��-���
Manager �M � Steve Norwood, City Manager
Signature Printed Name, Title Date
CM -2014-450 .............:..............................
Contract Quantity Adjustment/Change Order
ROUND ROCi:.'fEXAS
rev,`08/12
Project Name: Rabb House Redevelopment
Quan. Adj./Change Order No.
Page 2 of 3
Amount
Contract
Time
Adjustment
Days)
3 $1,069.73
4$346.94
5 $867.35
3 $1,986.80
3 $2,312.93
12
3 $2,197.28
$3,053.06
3 $693.88
> $1,156.46
$1,491.70
-$425.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
14751.13
12
P.S. LANDSCAPES, INC.
P.O, Box 81702
Austin, Texas 78708-1702
(512) 335 -CROW (4769)
SILL. TO
John King Construction
P.O. Box 270150
Austin, Texas 78753.
DESCRIPTION
Rabb House - Contract # 13-09-034
Landscape and Irrigation per contract pricing
Sod per contract pricing
Flydromulch per contract pricing
Miscellaneous Install - Pots per contract pricing
Promix Topsoil
Granite Gravel Install per contract pricing
Lighting Install per contract pricing
Change Order - Lighting Convert 120v 941 fixtures spec'd in plant to low voltage LED
Change Order - Installed (3) additional step lights per John David King
Change Order - Approval of Option 2 (see attached proposal dated December 11, 2013)
Change Order - Installed Dillo Dirt per approval of City of Round Rock and JKC
Change Order - Installed (2) additional spot lights for water area per approval of JKC
Change Order - Installed (3) Quick Couplers as per approval of JKC
Subtotal
Sales Tax (0.
Invoice
DATE INVOICE #
4/25/2014 64317
TERMS
AMOUNT
0.00
4,250.001'
&,Wneftfi—� 450.001-
8,165.00T
50.0078,165.00T
2,880.00T
400,OOT
Co .O;e�� 525.00T
Thank you for your business.
Total
$0.00
3-w
0 .HULL
■ SUPPLY ®SERVICES ®ACCESS CONTROLS
w COMMERCIAL DOORS FRAMES, & HARDWARE
■ TOILET PARTITIONS AND ACCESSORIES
www.hulisupply.com Security License #615803
5117 East Cesar Chavez PH: 512-385-1262
Austin, TX 78702 Fax: 512-385-0225
YOLANDA RODRIGUEZ
yolandarodrig uez@hullsupply. com
Ph: 512-225-8076
0004444
JOHN KING CONSTRUCTION LTD.
P. O. BOX 270150
D`~ AUSTIN, TX 78727-0150
T:Q"< PHONE: 512-836-5464
_ FAX: 512-833-0133
>; JOHN 512-968-9905
cyn@johnkingconstruction.com
Quote
THE RABB HOUSE
TX
Sales Order N0:0104755
Order Date: 4/23/2014
Ship Date: 4/30/2014
Job NO:
itst¢merPO�hia Y�I WnttetB
PICKUP Net 30 days YOLANDA RODRi 9UtL
—z� w tTtttPrtC ExCAmI
Line S()Ipt t ty Qty 1T6MNllivIBER i`Pj 11B PTI4 i xr� x SIN
t�10 C2ty
_?"'k,
mu
8#J.14
a� v
...:.. h."✓xi' Y r. a:.y - i& .�x+�:x `�a.€�.:,.,. ,",�, �....it: -,rr+x .s. ;r'��
t 2 EA NGP1050592 R0100 x 36" x MILL - RAMP 69.60
2 /FRT FREIGHT CHARGES.
Note: Check shipments thoroughly. We are not responsible for shipment after delivery. Your signature here means you
acknowledge receipt of material on this page and previous page(s). Keep your receipt for verification of such.
Received by Date:
Print Name:
RE -STOCKING FEE 25% 'SPECIAL ORDERED ITEM NOT RETURNABLE
HMD STF KEYSHOP PURCHASING
WDR ALF INSTALL SHIPPING
HMF CAGE TAGGING SERVER
139.20
25.00
Net Order:
164.20
Less Discount:
0.00
Freight:
0.00
Sales Tax:
13.54
Order Total: 177.74
Less Deposit:
Order Balance:
Page 1 of 1
Printed: 4/23/2014 9:31:45AM
P.S. Landscapes, Inc.
Our Reputation is Growing
Change Order Proposal
Rabb House
John King Construction
May 27, 2014
• Installed (3) additional down lights as requested and approved by David Buzzell
Sales tax is not included in pricing.
Signature of Approval
Proposal will be honored for 60 -days
Date
$750.00
P.O. Box 8,1702 Austin, Texas 78708 512 -335 -(GROW)
McCoy's Welding
20016 Algreg
Pflugerville, TX 78660
512-251-2330, 512-251-0620 Fax
I NAME/ADDRESS I
John King Construction
P.O. Box 270150
Austin, TX 78727-0150
836-5464, Fax 833-0133
Attn: J/D
Quote
DATE
ESTIMATE NO.
6/4/2014
3245
PROJECT
Rabb House
TERMS:
Net 30
I ITEM I DESCRIPTION I Total I
RE: RABB HOUSE
6 RAILS AT AMPHITHEATER, ONE AT EACH SIDE OF STAIRS
RAILS TO BE OUT OF 1 1/4 SCH 40 PIPE WITH ONE COAT OF GRAY PRIMER
HOLES TO BE COREDRILLED
THE ONLY WAY TO MAINTAIN THE 2'10" HEIGHT DIMENSION IS BY EXTENDING
BOTTOM POST OUT FROM THE RIZER BY ONE TREAD LENGTH
TOP POST NEEDS TO EXTEND BACK FROM TOP RIZER 5 1/2 " TO MAINTAIN 2'10" HEIGHT
DIMENSION AND NOT CUT INTO OR WEAKEN THE TOP RIZER * SEE DRAWING*
$2640.00
Sales Tax -Austin
1. Any changes in scope of work will require notification to McCoys Welding in writing.
2. This quote must be signed and returned prior to initiating contract within 30 days.
3. Terms for all invoices are over 30 days add 10%
4. Material prices are subject to change
5. No overtime unless specified
Customer's Signature & Date
0.00
Total $0.00
CHANGE ORDER
JUNE 6, 2014
SUBMITTED TO: JOHN KING CONSTRUCTION
12012 IH -35 NORTH
AUSTIN, TX 78753
WORK TO BE PERFORMED AT:
Rabb House
151 N A.W. Grimes Blvd
Round Rock, Texas 78664
CHANGE ORDER: #5
INCLUDED:
➢ 601n ft of new railing to be spot primed as necessary, sanded, and painted to match
existing
CONTRACT ADDITION: $900.00
NOTES:
➢ 4 days time extension is requested as a result of this change to scope of work
➢ Addition amount includes all labor, material, equipment, and supervision necessary to
complete the above mentioned scope of work
Bid good for 60 days only
Looking forward to the chance to work together
SUBMITTED BY: &O&CC�r(ReA
Acceptance of Change Order
The above prices, specifications and conditions are satisfactory and are hereby accepted. You are
authorized to do the work as specified.
Date:
Authorized Signature:
By:
8760 A RESEARCH BLVD., #242 • AUSTIN, TEXAS 78758 -OFFICE 512.238.0044 • Fax 512.238-1907 • CELL 512.771.0847
McCoy's Welding
20016 Algreg
Pflugerville, TX 78660
512-251-2330, 512-251-0620 Fax
BILL TO
John King Construction
P.O. Box 270150
Austin, TX 78727-0150
836-5464, Fax 833-0133
Attn: John
CHANGE ORDER
DATE
INVOICE #
5/14/2014
10130
Signature is required on all Change Orders. Please sign
and fax back. Thank you
P049
John King Construction, Ltd. Phone: (512) 836-5464
12012 11135 North Austin, TX 78753 Fax: (512) 833-0133
JOHN Kimr.
Owner Contract Change Order
Project Name: Rabb House
Owner City of Round Rock
David Buzzell
221 East Main Street
Round Rock, TX 78664
Change Order # 7
Printed On: 06/13/2014
Created On: 05/27/2014
Job Number # 13-09
Architect Number:
#
Change Order Item Description
Amount
1
• Additional steps lights added on revised landscape drawings: $450.0020.4
a�kM
2
• Thresholds for two exterior RR doors: $300.00
$346.94
3
• Caps required on amphitheater steps material: $1,120.00 (labor cost was waived)
1,295.24
`
5
• Prep work for stair connection detail provided late (angle support/cut back deck):
$1,986.80
$1,718.00
6
• Requested additional tree lighting & 3 quick connects: $925.00
$1,069.73
7
• Additional 3 down lights per request of David: $750.00
$867.35
8
9
• Prep work/frame (Fitzharris): $1,000.00
e Change for additional crane rental, due to change in shops: $1,285.00
$1 156.46
< tl.48:6�.Aliq
10
• Ice maker: $1,900.00
$2,197.28
11
• Rails at amphitheater: $2,640.00
$3,053.06
12
• Time Extension: $2,000.00
$2,312.93
13
• Painting rails: $900.00
$1,491.70
14
• Refund for shipping - speakers
($425.00)
15
•6 Additional stone blocks
$693.88
Extension of Time This C.O.
Previous Extensions of Time
Total Extension of Time To Date
Original Contract Compl Date
Revised Completion Date
Owner
By:
Date:
0 days
Original Contract Amount
62 days
Total Previous C.O.'s
62 days
Contr. Amt Prior to This C.O
03/15/2014
Total This Change Order
05/16/2014
Current Contract Amount
Contractor
By: By:
Date: Date:
$2,395,411.00
$43,170.07
$2,438,581.07
$18,052.84
$2,456,633.91
Architect
FOAV
John King Construction, Ltd. Phone: (512) 836-5464
616 12012 IH 35 North Austin, TX 78753 Fax: (512) 833-0133
JOHN KING
CONNUCTION
Change Order Worksheet Report
Project: Rabb House Job Number: 13-09
CO No: 7 Architect No:
Printed: 6/13/14
Division Description Amount
Item # 1 • Additional steps lights added on revised landscape drawings: $450.00
02-900.S Landscaping $450.00.
Burden: 0.00 S Tax: 0.00 Gen Liab: 4.54 OH: 31.82 Prof: 34.05 Tot: $520.41
Item Total $520.41
Item # 2 • Thresholds for two exterior RR doors: $300.00
08-103.M Hollow Metal Doors & Frames
$300.00
Burden: 0.00 S Tax: 0.00 Gen Liab: 3.03 OH: 21.21 Prof: 22.70 Tot: $346.94
Item Total346.9
Item # 3 • Caps required on amphi ater fps material: $1,120.00 (labor cpstwas.,waived)
M Site Furnishings $1,120.00
`s"0.00 S Tax 0.00 Gen Liab: 11.1 OH: 79.19 ,Prof: 84.74 Tot -
\1 1,295.24
Item Total $1.295.24
Item # 5 • Prep work for stair connection detail provided late (angle support/cut back deck):
$1,718.00
05-511.M Steel Stairs $1,718.00
Burden: 0.00 S Tax: 0.00 Gen Liab: 17.35 OH: 121.47 Prof: 129.98 Tot: $1,986.80
Item Total $1,986.80
Item # 6 • Requested additional tree lighting & 3 quick connects: $925.00
02-900.S Landscaping $925.00
Burden: 0.00 S Tax: 0.00 Gen Liab: 9.34 OH: 65.40 Prof: 69.98 Tot: $1,069.73
Item Total $1,069.739,
Item # 7 • Additional 3 down lights per request of David: $750.00
02-900.S Landscaping $750.00
Burden: 0.00 S Tax: 0.00 Gen Liab: 7.57 OH: 53.03 Prof: 56.74 Tot: $867.35
Item Total $867.35
Item # 8 • Prep work/frame (Fitzharris): $1,000.00
05-511.M Steel Stairs $1,000.00
Burden: 0.00 S Tax: 0.00 Gen Liab: 10.10 01-11: 70.71 Prof: 75.66 Tot: $1,156.46
Item Total L"6-46
Item # • Change for additional crane rental, due to change in shops: $1,28 0
05-511.M Steel Stairs $1,285.00
rden: 0.00 Tax: 0.00 Gen L b: 12.98 OH: 90.8 Prof: 97.22 ot: $1,486.06
Item Total �. 486.06
Item # 10 • Ice maker: $1,900.00
15-400.M Plumbing $1,900.00
Burden: 0.00 S Tax: 0.00 Gen Liab: 19.19 OH: 134.34 Prof: 143.75 Tot: $2,197.28
Item Total 12_L97.28
Item # 11 • Rails at amphitheater: $2,640.00
05-720.S Ornamental Rail $2,640.00
Burden: 0.00 S Tax: 0.00 Gen Liab: 26.66 OH: 186.67 Prof: 199.73 Tot: $3,053.06
Item Total3 053.06
Item # 12 • Time Extension: $2,000.00
01-061.0 General Costs $2,000.00
Burden: 0.00 S Tax: 0.00 Gen Liab: 20.20 OH: 141.41 Prof: 151.31 Tot: $2,312.93
Item Total $2,312.930
Item # 13 • Painting rails: $900.00
09-900.1- Painting $900.00
Burden: 389.88 S Tax: 0.00 Gen Liab: 13.03 OH: 91.20 Prof: 97.59 Tot: $1,491.70
Item Total 1 491:70
Item # 14 • Refund for shipping - speakers
16-760.S Audio Systems ($425.00)
Burden: 0.00 S Tax: 0.00 Gen Liab: 0.00 OH: 0.00 Prof: 0.00 Tot: ($425.00)
Item Total L$A25.001
Item # 15 •6 Additional stone blocks
04-440.M Stone $600.00
Burden: 0.00 S Tax: 0.00 Gen Liab: 6.06 OH: 42.42 Prof: 45.39 Tot: $693.88
Item Total693.88
Grand Total $18.052.84
Travis Wilkes
From:
Sent:
To:
Subject:
Sent from my iPhone
Begin forwarded message:
John David <JD@johnkingconstruction.com>
Thursday, June 05, 2014 2:26 PM
Carla Samford
Fwd: Deck fix for Rabb House
From: Stephanie Fitzharris <fitzharrisandcoahotmail.com>
Date: June 5, 2014 at 2:25:13 PM CDT
To: John David <jdQjohnkingconstruction.com>
Subject: Deck fix for Rabb House
Invoice
RABB HOUSE -EXTRAS
No.......:
5/7/14
Bid
SF
Date....
Quoted
By:
Customer.:
RABB HOUSE
$1000.00
AUSTIN TX
MISC CARPENTRY
Cust
PO#..:
Cust Phone:
Terms.........: CASH ON DEMAND
Ship To.......: Fitzharris & Co
COD. COD COD COD COD
1600 SUSAN DR
AUSTIN, TX 78734
Job Name.: RABB HOUSE
Item Net Price Tota
RABB HOUSE $PERSF extr
REMOVE WOOD AND PREP FOR STAIRCASES
$1000.00
REMOVE WOOD AND PREP STAIRCASES
$1000.00
DUE
Stephanie Fitzharris
Travis Wilkes
From: John David <JD@johnkingconstruction.com>
Sent: Thursday, May 29, 2014 7:57 AM
To: Travis Wilkes
Cc: Ryan Hansanuwat; Chris Lewis; John King
Subject: Rabb House: Pricing
Attachments: CAA49BDF-CCOB-4878-96BE-6DFBC749BFF6[139] jpg; IMG[1].pdf; RABB HOUSE
DRAWING 5.28.14[1].pdf
Importance: High
Travis,
The requested pricing. The pricing listed does not include any GC markup.
• Add Water line -to serve ice machine and install indirect waste to existing mop sink. Machine will be
installed on blocks to allow condensate to drain: $1,900.00 (see attached detail)
• Alternate to break floor and add drain and install water line to ice machine: $4,000.00
• 3 sets of handrail down center steps of amphitheater. *Last outstanding item holding building final*:
$1,320.00 (see attached detail)
• Fumish/Install 2,200sf of TREX on underside of 2x12 deck joist: $24,200.00
Please let me know how you would like JKC to proceed.
Thank you,
JD King, Superintendent
-12012 IH35 North
FIAV . Austin, Texas 78753.
Office (512)836-5464
Fax (512)8330133
kola Mobile (512)968-9805
JOHN, KING jd@1ohnkingconstruction.com
CONSTRUCTION P.O. Box 270150 Austin., TX 78727
• IA
•
�
{S � lam.
1 r U
='
,> r-
r.
4
'
�
c C C
O
�,