Loading...
CM-2014-463 - 7/18/2014TECifiy of Round Rock rR"D ROCK XAS mUM rrasevm Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with Seiler Lankes Group, LLC for the Oakridge Drive/Creekview Drive Drainage Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/18/2014 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $2,171.28 Indexes: General Self -Financed Construction Attachments: SC#1_SeilerLankes_Oakridge-Creekview_CM7.18.14, Maps_OakridgeCreekview CM4.4.14 Department: Utilities and Environmental Services Text of Legislative File CM -2014-463 In April of 2014, the City selected Seiler Lankes Group, LLC to perform analysis and design for the Oakridge Drive/Creekview Drive Drainage Improvements Project. This Supplemental Contract No. 1 is necessary because of the following: - The surveying scope needs to be increased because a solution was identified near the west end of Chisholm Trail Middle School in an area outside of the surveying limits in the original contract. - Services such as: responding to contractors' requests for information during construction; reviewing contractors' submittals; or other miscellaneous tasks following receipt of bids by the City or during construction may be required. The amount payable under the original contract is $33,828.72. Supplemental Contract No. 1 will increase the amount payable by $2,171.28 for a new total of $36,000. Staff recommends approval. City of Round Rock Page 1 Printed on 7/17/2014 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Utilities & Environmental Services Project Mgr/Resource: Lance Shellenberger F'�Council Action: ORDINANCE Q Agenda Wording fx-x-1 city Manager Approval Oakridge Drive / Creekvlew Drive Drainage Project Name: Improvements Contractor/Vendor: Seller Lankes Group, LLC RESOLUTION CMA Wording Consider executing Supplemental Contract No. 1 with Seiler Lankes Group, LLC for the Oakridge Drive / Creekview Drive Drainage Improvements Project. Attorney Approval Attorney Date % / //) V 0:lwdoxlSCCInts10199\14401MISC100306806.XLS Updated 6/3/08 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: SEILER LANKES GROUP, LLC ("Engineer") ADDRESS: 306 East Main, Suite 101, Round Rock, TX 78664 PROJECT: Oakridge Drive / Creekview Drive Drainage Improvements This Supplemental Contract No. 1 to Contract for Engineering Services is Made by and between the City of Round Rock, Texas, hereinafter called the "City" and Seiler Lankes Group, LLC, hereinafter called the `Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 8th day of April, 2014 for the Oakridge Drive / Creekview Drive Drainage Improvements Project in the amount of $33,828.72; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $2,171.28 to a total of $36,000.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $2,171.28 the lump sum amount payable under the Contract for a total of $36,000.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have . executed this Supplemental Contract in duplicate. Supplcnicntal Contract Rcv.l2/01/08 0199.1440; 00306797 84275 CM -2014-463 SEILER ANKES GI UP, LLC B Date CITY OF ROUND ROCK API VEDAS T FORINT: By: �Cv2 ��txwecc� 1 Step n L. Sheets, City Attorney Rev. 12 01/08 84275 Date Supplemental Contract 0199.1440;00306797 ADDENDUM TO EXHIBIT B Engineering Services Exhibit B "Engineering Services" contained in the Contract for Engineering Services between the City of Round Rock and Seiler Lankes Group, LLC dated April S, 2014 is amended by Supplemental Agreement No. 1 as described below. Add the following to the bulleted list after the first paragraph under 2. Scope of Services: • Task S: Additional Surveying • Task 6: Port -bid Services Add the following sections after 2.4 Taslc 4: Meetings and Project Management: 2.5 Task S: Additional Surveying If the (mrilysis described in Section 2.2.1 above reveals a solution not previously conrtemplaterl, SLG will utilize its survey partner, Inland Georletics, to survey in the vicinity of Oakridge Drive approximately 1500 feel hest of Deep Wood Drive in general conformance with the sialleyinng criteria described in Section 2.1.2 above. 2.6 Task 6: Post -bid Services The City may request the Engineer to provide services following receipt of bids . for construction of the improvements as described in the final plans and project manual prepared under Section 2.3 above. Such services may include but not be limiled to the following: reconmrrenclation for mmir'Cl of a consmictioni conircict; review of Contractor's submittals during construction; responses to Requests ,for Infornnalion (RFI's) from the Conrtractor during construction; antl, aCldilional invoicing ADDENDUM TO EXHIBIT C Woi-k Schedule Exhibit C "Work Schedule" contained in the Contract for Engineering Services between the City of Round Rock and Seiler Lankes Group, LLC dated April 8, 2014 is amended by Supplemental Agreement No. i to add the following: DESCRIPTION 2014 June July AugSept Oct Nov Dec Additional Surveying Post -bid Services ADDENDUM TO EXHIBIT D Fee Schedule Exhibit D "Fee Schedule" contained in the Contract for Engineering Services between the City of Round Rock and Seiler Lankes Group, LLC dated April 8, 2014 is amended by Supplemental Agreement No. I to delete the last line labeled "GRAND TOTALS" and to replace with the following: (TOTAL (TOTAL (OTHER (SUB LABOR LOADED DIRECT CONSULTAN (TOTALS) HOURS) LABOR COST) COSTS) TS) Task 5: Additional $1,200.00 $1,200.00 Surveying Task 6: Post -bid .Services 7 8931.70 $39.58 8971.28 GRAND TOTALS 275 828, 316.42 1 $183.58, $7,500.00 $36,000.00