Loading...
R-2014-1603 - 7/24/2014RESOLUTION NO. R-2014-1603 WHEREAS, the City of Round Rock has duly advertised for bids for the Chandler Creek I — Upper Phase Wastewater Line Project; and WHEREAS, Prota, Inc. has submitted the lowest responsible bid; and WHEREAS, the City Council wishes to accept the bid of Prota, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Prota, Inc. for the Chandler Creek 1 — Upper Phase Wastewater Line Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 24th day of July, 2014. ATTEST: 9 Az•R SARA L. WHITE, City Clerk 0112. WN. W307MI C!: U City of Round Rock, Texas C-povc--pV Rou, Wayev-�?D=ret-i N 888 8 888 0 8 08 8808 8888588 S 8 8 8 8 08 5 S S S 8 8 n n na on no2525 8 Re o m $ o og o S v m 8 f �s g S Q O N O N N q O Y N O N O Iff p a v O O O N M.O O m Ol 0 O N A N N N N q O N W N F c u N 88"Id N N N N 8Oppa8oppb8o N N N So N S N SS N N N Y► N M N N 5 N N SSSS N N N S N 8Sm N 8 N 8 SS 60N N N O N S M M M u d8 oS O $ 0858 N N O O a A A O O O m v S O pO S O S O pcs O ooS d O z H H n 00 + 0 N o O N m of H R siv .4 f f l0 N ni 1V N 888 8 888 8 8 88 8888 8 8 88888 8 e e e 5 SS 5 8 8 8 8 8 z SSH O O O 5 N 88 O $ St8 85188 0 N N N N O N HNN XN O- 8N 8N 8 0 8S 8pNOpS VNSR gtl� jQ J►��O 8 a�a NN fV vNppON m N RNOO O N N N N O N A of 4.01 O v O O IfNSSVV u• N8OS NppOh p M81(1 p NOO N1Nf1 MOp NR8OO N M N N NN N9RN N pOO Vp NN o8 8 S S 8 ^ OS RA y N O h O A {{C�, A H.'Z S S HSS AN AN S S O S SSSS CAASOf S O^OppSS O A m AI f C C p w '♦ S fV A O N A N n O 1� O v N q N N O N A VNf N u ^ •- •- •- � � N r r Q N N N N N N N N N N N M N N N M N N N N N N M M N N M N N N N w N 5 SSS 5 S fp e p o o5 SS S Sof RA M O O O S O IV pA O 6 QNoH ^ " N J 888 8 888 8 8 88 8888 8 8 88888 8 8 S 8 8 88 S S 8 S 8 H S A Q Z 25�7C 5� 35 g �G252S ZS Q S qQ 2;"e g2Som M1 o 5� ZS 1SNQo� C Q O N 8 o C m g $2S Q G e O o Q ZS Q C 8 n u a a N a o p N m 2j O N 1'1 R N R a N N N N N N M N N N N N N N N N N N M N M M M M N M N M c O pN V OO pN 8 O 8 p 8 8 8S S p O S H H H S S S p O S S S S S pN pN O 4 O 8 8 Yf O 88 N O O O 8S O " 5. mN p 8' o N S S 1Sf i �(Of O N A O co S R O ppS �1pO1 N A O N 17 A O p N m H N N O f iV 888 8 888 8 S 88 8888 S 888888 S Sm S S S 8. S WO S{f H ng S v -0 � S p9Q N vA i8 ROW Cb SS 3 S F aA O I'1N O N 1'f N A 1'l Q m O Q O f Q A f O N COO11''77 M N pO O0 M OOf M OON M M pOn pOm M pN O M O N N O O M N O O M N O plV N M 0O 0 N N 0^ 0O N N S O0G M OO N S N pO N OO N pO N po N M pON o M OO M OON N OO O N OOO< N 8� 1 rl N " p N I S RO o00pv p N zW k o0 NOO O 5O 5 5 0 000 0 00 988 8 8 8 88888 0 O, COI 8f 0 08 0NO 00v 00O doHN HNpp F8YFI 8AO 1f S9 H O S pp S S N S 88n S S O 8 O Qm 8 S 88lV ' Pf 1 !1N N N Q N 9 RS$Yl p Y C NM VWQ4 N8O8O1MpOZVS p8Ot8M2QO5 �p '1 N8OOMQaN pNNM pMSO[!NaQVV N8ONQS p NNn8NQ3 pN„N+O pNI�Nm''1 8888NMv pMmMf 8SNONN NNQ2S 0NNmOo SNPNSnl pNNNG pNNNO SNNti NnANQ NANf NfnNNQ7i NYNWf 8 NIN0fl SNSNf0 No84NMOf n ts OoyfnONM pp NN!MS1 NO�ppN. SO5OaaMpOQ2DDS Op8OMQFN1"7 ci nI 8 §^ W t O OS Q0N NOMQQ 7i zp O 8 888 5 8 85 88 8 $ S QHQ' f S SS 8 ) 85 10 IV v mQ o ma, V(w� p p pOp O p p p p 0 0 O O O O O OSOOO O O O OO 0 to C4 88 0 25 $ uF• $R8 2 NNfV N n A a a n 8 88Q 8 88 8888Q8 888Q82888 8 0 0 0 8 88 8 8 8 8 8 a y8�Q8Q8 Q8Q Q8Q �8+58� y8�Q 1NNV fMV N !NV N N O A n O N A ON YNf '/Nl {'Mf PNI M N N N N N N M M M M N N M N N N N N N N N N N ry N M tu S S S 8 88 S S 8 r r 8 8 88 8 S S 8 8 8 8NOpIfl O 8 OrC s~ ppInfl ppOM NppO ppON ppIPfs1 pYnoI ppmN p�pOi hv A m 8 Q m O ul Q O C! On C 0 pO S O CQQvifV C S O�fl 866 f'1 G!a R z � v v N pp pO pp pppp f QQ N ^ app A N00 m J p 0 J J u Q N J N co J J N J N J } N LL LL} J J tt 67 W LL W J a LL W J Q Q W tJ Q LL W J LL J LL J LL J LL J LL J LL Jy W W LL 7 41 LL J LL J W • 6 C G to q • 9 C 0 • c C« O E6qq LZ • e o 6 a O • S� s o u o u G 9 a Cc ' E• t' q z C C Is u ; y 1- 5• • �o }� • 7i iii u v b « e$ _6 r 3 0 u 8 CC M o w Y �� S 8 a � S '� c� Y 8 � e $ e • es p• $ � � 4 7f C i o O S S r S r 5 O O o• , D w � m V p OQ^f CL R z Y Q� ii� 4Q s 6 E 8 8 D 8 1L w n� €.6 3 $ « - g !• I ey i E 0 0 o d d ° S S v E C. o 8 r k Y• w V W =a�•pi Qww �W � E $ a d• e w a a 44 3 o«E a' .06 s g «� E $ $ o. o $ii w Eo c eV o > u ` > u -� ; u ` �• 0 z u a u m S o e e .6 e i -C ►-- d rr 0. a a Q^dam d Q$ a m6 0 0 w q m a 8 t$i OJ G $ • O E z u «6 «• E O Ea O p .5 Q Q� f j o 8 E8 �i O8 2 5 2 8 c emR$8 = E m E ao > C O O O O O C O O F a O F p p• AE S ¢ yM D ¢ M O a j� 2 9 W 8 a C O W C g q $ g g$ C m S �tjl u 3 O t�jl S M R u m U >6 u m• u E 6 m a a W u d C o w s u E (� ,D`1 G m L m 0 A a Q0 6 C V� hL' M N � A � � � � N ' R � W N N a• 2 m .s1 QQ Q N 6 a uis W WCVt ... .... N �N.. v N•Nr N tM1 !1 !1 1'1 N 8 8 888858Q�888g8 $ 8 99 Q8 Q o 588 ZS ZS 88 8 n25go;Ce4n 3 Q8 75 Q8 7i Q889 X5825 $ $' a2 O 1f1 A m N n m A- N a N l� q o♦ N �v a s g S gAS 00 888SQQQg S1 S gg8 010 SQg2S gn gn 8 8ga 8 14 $g Z J N m m N 8"b 8 88 8828Q888888 8 858Q258Q 8 8 j o$ of $wgoo��$ Q8Q § iQN nn• I m N a S O S ONN^ NN p pN pp M pN pM pN pM pM Mp pM pN pN pN pN M N M F U S S O g O O 8 8888888881 8 8 8 8 8Q 8 8 0 QO 581 811 QO Q O S 113 oa $S 8g g^g$ggg° qg 25 2S O J n N A N m' A O +8 S O fp: 3 3 3S P S S pp O S ry S A g m n 3 8 N 889 2 O ♦ O � S �Ay Y1 W V Q A l�1 A � w � O n N♦ Inn S l'1 Q ♦ O N n q O � 12 so II u O O M O O M N m M O Pf N N m M� N N n♦ N N w N N m S M N N N Yf M ♦ N N N N M M A N 38 3338883gm 8 S s g wwC" O a 1� w oo ya y� N O O ^N N O Y~ g j 3 88 8 8888 fi O S N 3n 888 O �!f p8 N p88888888 IN�i O O Ifl A A p8 88 IA 588888 O O 11 fid$( p �$a tl pOp N m' n �a Np N N N N N N N N N N N N N N N N M C tu U OO8 pN p O O p O S p O O p O S p SO S Sm p pN p O O p p oS o o m ppS SS pO 8 S E~ w = n PI !f h N N m m J 88°WQ� 8 88 SSSSSSSSS 8 8 338 S 3 33g33 n C N S999 b mna0 g ♦ 999 9 aO $ �% m -- ♦ w ♦ !1 O ♦ N N m O N fV A N A N !f N N Q A N$ w Q f � N N M M M N N N N N N N N N N N N N N O M M p a O 4 W O V QO O O OQ O O QO O 0 0 0 ^nor§�na♦gi 0 0 0 0 0 0 O O O a iG25 �xi 35 8 xgg �t �♦ N ♦^ v N o n N N Si S SS8 8 8 A 3n Q88 25 � w Qso 2S 5S�8Q8QQoQQ8QQ8Qy0�00 g 25 � �S 25 �S 25 75 M ti 50Q� 3 QS � $♦ g � � � R �. N N N N N N N N N N Np M N M N N N M M y C V SQ S S S S S p S S S S p p S S pM O pN as Q 25g F ♦^ z QS X ^ ¢S 2Sg N $"gg�$$�i 8 5O5�� .7S nN�i J OO p OO 8 S S8 S S S S S SpOp OO S�ny S p p O A 0 pppmp b 88 8 mj8n A Q A N m 0 m t N♦^ m w w N A ry m 0 IOC p A M N N N N N N N N M N N N N N N M Q W S S S 8 p p 0 O O S pN 0 0 0 0 0 0 O O O �� z g .��gr4 V, 8m J S S 8 33 3n3^ 33N o8 S $ = C A O O acv 0 N m IV O Q x$x$ tpptyy 8� N SSpS O. Yf N N ppS O tlf N 88 ^ N N 883833838 a w N N N N M N N N N M 8 M p3 N 88rx N N ♦ N N N N N $ 0.Z n N ^ ♦ n n O i Q !1 Mf N N N^ S y ♦ � N Z Go J Q J J J W laic i S � �• o 8 C p r e • �.fi .5 �` V O u • pp C Si E a �c 3 ~•. 3 3 g 5 N 60) Qz W' Z i ^^ pE M • g= 7Y • r p3 a ' BB E ^' CL S O. • G W N z 6 a W E. wp ILo s E S V �rs 9 N m $ C a 'a o C 0. a Ktu �ffgq b g •M 3 Q 9r 100 Vr Y ssq S '� W • i t7 $ O Y '� u 3 �oc of� � m�3 uuu 3 ,� o � � 3 S� V O 2 b C O �` 3 5 i o :E8000 N M 0 • 9 M m u E C a HQQ y a ppjja�aaa A A A W av�� ECC W g` p ciLU $C�pO r&A Ly �I1 �g��g��' }yCY • m W W � � e� epi ^ � ^ � a v ♦ � ♦ ♦ a ♦ r, � � � h 22971 -Chander Creek 1- Phase Wastewater Line Page 3 CITY OF ROUND ROCK, TX CHANDLER CREEK 1 -UPPER PHASE WASTEWATER LINE PROJECT 1122871 June 26, 2014 BIDDERS ORO MEX Construction Co., Ino- Cash Construction Co. Inc. SJ Louis Construction of Texas Ltd- Levels tractors. Inc, Kodiak Tranctiing d Boring LLC Patin Construction LLC Rockln O Construction D. Guerra Constructim LLC ITEM I DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE] AMOUNT UNIT PRICEI AMOUNT UNIT PRICE AMOUNT UNIT PRICEI AMOUNT BASE BID t PHASE 1 Mobilization Maximum 1D% of Dotal bid complete in piece LS 1 S 60 000.00 S 80 000.00 50 000.00 S 50 000.00 100 000.00 $ 100 000.00 52,5W.00 $ 52 500.00 150 000.00 $ 150 000.00 130 000.00 130,000,0D 60,00D.01) S 60 000.00 200 000.00 3 200 000.00 2 Bond! Maximum 5% of total bid),complete in place LS 1 S 25,000.00 S 25 000.00 30 000.00 S 30 000.00 55 400,00 S 55 400,00 19 500.00 S 19,5W.00 49 676.011 S 49,078.0D 65 000.00 S 65,0D0,00 30 000.00 $ 30 000.00 85,000. S 85 000.00 3 Clearing 3 Grubbing, Brush R Tree Removal complete in place LS 1 S 15.000.00 S 15 000.00 12 000.00 $ 12 000.00 6,000.00 S 6.000.00 20 000.00 S 20.000.00 19,250.00 S 19,250.0D 5,000.00 S 5.000.00 6,000.00 S 6.000.00 10 000.00 S 10.000.00 4 Seed!ng, Fertilizing 6 Mulching, complete in place AC 11 Is 2100.00 S 23100.00 1.800.001S 19 800.00 580.00 S 6.360.00 3.000.00 S 33 000.00 6,052.0D S 75 372.00 2.200.00 3 24 200.00 650.00 $ 7.150.00 11 1600,00 S 17 61X1.00 (5) Apply for, Install S Maintain SWPPP (Storm Water Pollution Prevention Plan). Complete in place LS 1 S 25 000.00 S 25 000.00 25 000.00 S 25 000.00 21 000.00 S 21 000.00 30 000.00 S 30 000.00 32.D50.00 S 32 050.00 17 000.00 S 17 000.00 25 000.00 3 25.000.00 33 000.00 S 33 OOO.OD 8 Barricad Signs A TrafficHandling. complete in ace LS 1 $ 2D,000.00 S 20 000.00 6 000,00 S 6,000.00 5 100,00 S 5.10D.00 5,000.00 S 5,000.00 1,200.00 S 1,200.00 3,000.00 3 3 000.00 3,000.00 S 3,000.00 12,0D0.00 S 12.000.00 7 Testing,Video b CleaningServices complete in ace LS 1 f 25000.00 S 25 000.00 11 000.00 3 11 000.00 5,200 S 5200.00 25 000.00 $ 25 000.00 14,9D5.00 S 14 905.00 6,500.00 S 8500.00 30 000.00 S 30,000.00 23,100.00 f 23.100.00 8 Instat) 6 Remove Tam Orange Fencing, complete in place LS t S 21 ODO.00 S 21 000.00 14 OD0.D0 S 14 000,00 13 600.00 S 13 600.00 12 000.00 S 12 000.00 20 560.00 3 20 560.00 10 000.00 3 1t) 000.00 15 000.00 3 15,000.00 12 000.00 S 12 000.00 (9) Install & Remove Temporary Barbed Wire Fencing & Gatos, complete, in ace LS 1 S 15.000.00 S 15 000.00 40 DD0.00 S 40 ODO.00 14 500.00 S 14 500.00 20 000.00 S 20 000.00 17 050.00 $ 17 050.00 15 000.00 S 15 000.00 30 000.00 3 30.ODD.00 29 700.00 S 29 700.00 (10) Installation and RemovalfCtoanrup 8" Thick Grav*Mp-Rap Surfacing for Singing Area, complete in place SY 11,750 S 3.00 S 35.250.00 12.00 S 141 000.00 0.011S 117.50 8.00 3 70 500.00 35.00 S 411 250.00 0.10 S 1,175,00 10.00 S 117.50D.00 32.00 S 378 000.00 11 Surface Rostorotbn. Concrete Curb Gutter. coin ata in place LF 80 $ 65.00 S 5 200.00 30.0013 2,40D.00 30.00 S 2 400.00 20.00 S 1,500.00 24.10 $ 1.926.00 30.00 S Z400.00 18.00 S 1,440.00, 30.00 $ 2,400.00 12 -& Surface Restoration- Concmta Sidewalk compleft in place LF 80 S 72.00 3 5,760.00 70.00 3 5,6w.00 70.00 S 5,6w.00 25.00 $ 2,000.00 8.00 $ 480.00 50.00 $ 4,000.00 30.DDI S 2.400.00 28.00 S 2,240.00 SurfaceRestotatlon-As completein ace SY 30 S 45.00 S 1350.00 60.00 3 1800.00 100.00 S 3,000.00 120.00 $ 3600.00 39.00 3 1170.00 40.00 S 1,200.00 35.DO S 1.050.00 25.00 .11 750.00 Install Now 20' Double Gate, cmm to in EA t S 2.500.00 S 2 500,00 850,00 S 650.00 t000.00 S 1.000.00 1 000.00 S 1,000.00 3 155.00 S 3 155.00 800.00 S 81)0.00 3 000.00 S 3,000.00 1,200.00 S 1 00.00 P14) and Relocate Exis Double Gate, co eta in EA 1 S 1.200.00 S 1200.00 300.00 S 300.00 500.00 S 500.00 750.00 S 750.00 1000.00 3 1 OD0.00 550.00 s 550.00 750.00 3 750.00 12Remove 1100.00 3 1 100.00 Remove Existing and Install Now Pomtanent Barbed Wire Fence, Complete in place LF 4,000 S 7.00 S 28 000.00 11.001S 44 000.00 4.00 S 18 000.00 6.00 S 24,00D.00 8.001 S 32 000.00 5.00 S 20 000.00 7.00 S 28 000.00 7.50 S 30.000.00 17 Tunnel Under HP Gas Unes, coplete in place EA 2 IS 10 000.00 S 20 000.00 22 000.00 S 44 000.00 7,250.00 S 14,500.00 24 ODO.DO S 48 DDO.00 1.000.001S 2,000.00 25 000.00 3 50.000.00 3 000.00 3 6.000.00 750.00 $ 1.500.00 18 Trench Exavatbn Sal Systems, complete in place LF 5,254 S 2.50 S 13,135.0D 1.00 S 5,254.00 0.01 $ 52.54 2.D0 S 10,508.00 1.00 $ 5,254.00 1.00 $ 5,254.00 11.00 $ 57.794.0D 2.00 $ 10.508.00 19 Install Manhole Delineator Posts with MHS ns complete in EA 17 S 200.00 3 3,400.00 250.00 3 4 250.00 850.00 3 14 450.00 100.00 S 1,70D.00 120.00 S 2,040.00 200.00 S 3.400.00 300.00 S 5.100.00 305,00 S 5185.00 20 Install Manhole Bollards complete in ace EA 17 $ 400.00 $ 6 900.00 300.00 S 5100.00 500.00 $ 8,5w.00 350.00 S 5V50.00 260.00 S 4,420.00 350.00 S 5,950.00 550.00 $ 9 350.OD 425.00 S 7,225.00 21 12" Cleanout Assembly, coin els in m EA 2 $ 1,500.00 S 3 000.00 3,000.00 S 8,000.00 t 300,00 S 2.600.00 1,5W.00 S 3 000.00 1,200.00 S 2,400.00 950.00 S 1,9w,00 1 OD0.00 S 2 000.00 600.00 S 1.200.00 22 12" PVC SDR -n Stub -out O Cut), coin in piece LF 10 S 250.00 S 2,500.00 86.00 S 860.00 20.00 S 200.00 175.00 S 1,750.00 50.00 S 500.00 95.00 $ 950.00 105.00 S 1.050.00 125.00 $ 1,250.00 23 18" PVC SDR -n Sower O Cut). 8' to 12', complete in place LF 3,060 3 10200 $ 312120.00 77.00 S 235,0M.00 135.00 $ 418 160.00 108.00 $ 330 480.00 60.40 S 184 824.00 123.00 S 378.380.00 118.00 S 381.080.OD 131.00 S 400.860.00 124) 16" PVC SDR -6 Sower O Cu depth 12' to 16' complete m LF 913 S 116.00 $ 105,908-00 85.00 S 77 605.00 136.00 3 124 168.00 /25.00 3 114 125.00 70.00 3 63 910.00 140.00 S 127,11M.00 133.00 S 121429.00 131.00 S 119 603.00 (25) 18" PVC SDR -26 Sower O Cu depth 18' to 2ff cont in ace LF 57 S 160.00 $ 10260.00 90.00 S 5130.00 138.00 S 7,75100 145.00 S 8.285.00 88.00 S 4,902.00 180.00 S 10,2S0.00 154.00 S 6,776.00 131.00 S 7.467.00 (26) ter" PVC SDR -28 Sewer (by Jack Tuinal or Bwo. Including 30" Stool Encasement Pipe), complete in ace LF 114 S 470.00 S 53,580.00 800.00 S 91 200.00 390.00 S 44 480.00 756.00 S 66.184.00 750.00 3 65 500.00 800.00 S 91.20D.00 650.00 S 74,1 00.00 465.00 $ 53 010.00 27 21" PVC SDR -213 Sewer Open Cut depth 0.8j, complete in place LF 570 S 114,00 S 64 980.00 96,013 $ 54 720.00 148.00 S 84 360.00 130.00 S 74 100.00 72-75 S 41 467.50 190.00 3 108 3DD.00 128.00 S 71 820.00 105.00 $ 59 650.00 2a 21" PVC SOR 28 Serves Open Cut depth V-121, complete in place LF 540 S 118.00 S 63 720.00 105.00 S 56 700.00 14a.00 S 79 920.00 135.00 S 72.900.00 77.00 S 41,580.0D 200.00 $ 108 D00.00 129.00 $ 69 660.00 105.00 S 58,70M00 29 New Connection to Existing 18" Sewer, complete in place EA 1 S 2.500.00 S 2,5W.00 3,000. S 3 ODO.00 5150.00 $ S,150.06 3 000.00 S 3 000.00 1,610. S 1 610.00 20 000.00 S 20,00D.00 2,000.00 S 2,000.00 1,350.00 S 1 350.00 (30) Standard Manhole. 4400t dia. With Bolted Lid (depth c81. complete in ace EA 17 3 5.800.00 S 98 SW.00 4,900,01) 3 0,3W,00 5 050.00 s a5 950.00 6,5W.00 S 110 500.00 4,563.00 S 77 571.00 3,500.00 S 59,5W.00 8,000.00 S 102 000.00 7 100,00 $ 120.70D.00 (31) Additional 4 -toot dla, Manhole Extra De d h >6 , complete in place VF I ST S 200.00 S 11 400.00 340.0013 19 360.00 80.00 S 4.560.00 500.00 S 26 500.00 1 325.00 $ 11I525.00 5M.001 S 28.5W.00 317.00 S 18 D69.00 350.00 S 19 950.00 32 Manhole Vent Assembly, complete in place EA 6 $ 3150.00 $ 18 900.00 2,5W. $ 15 OD0.00 3,900.00 $ 23 400.00 2 300.00 S 13 600.00 3,410.00 S 20 460.00 2,500.00 S 15 000.00 4.5W.00 S 27.0D0,00 2 .00 S 13.200.00 33 Cement Stabilized Backlit), complete in place LF 82 3 210.00 3 17 220.00 15.00 $ 7 230.00 150.00 S 12 300.00 250.00 S 20,S00.00 46.00 S 3,772.00 100.00 3 8,200.00 220.00 S 18 040.00 130.00 $ 10 660,00 (34) 18" PVC SDR 28 Sawot (By Opon Tranch Construction. Including 3t)" Steel Encasement Pi complete in place LF 114 $ 320.00 S 36,480.0D 250.00 S 28,500.0D 193.00 $ 22 002.00 320.00 S 36 45D.00 189.30 3 21 580.20 50D.00 57 DD0.00 No Bid No Bid 255.00 S 30 210.00 TOTAL BASE BID (Items 1 thru 34) PHASE I CONSTRUCTIONf ! !72863.00 f f f40 699.00 f f 20a !82.01 f f 290192 00 S f tf336f.70 f f 983439.00 f f 3}5,580.00 f 1786 51!).00 22971 -Chander Creek 1- Phase Wastewater Line Page 3 22871 -Chander Creek 1 - Phase Wastewater Line Page 4 CITY OF ROUND ROCK TX CHANDLER CREEK 1 • UPPER PHASE WASTEWATER UNE PROJECT 1122871 Junto 25.2014 BIDDERS ORO MEX ConstruetWu Co Inc. Cash Construction Co. Inc. SJ Louis Construction of Texas Ltd.P3,000.00 ntractor Inc. Patin Construction LLC Roekin G Construction D. Guerra Construetl LLC ITEM DESCRIPTION UNIT OTY UNIT PRICE AMOUNT UNIT PRIG AMOUNT UNIT PRICE AMOUNT PRICE AMOUNT UNIT PRICEAMOUNT UNIT PRIG AMOUNT UNIT PRIG AMOUNT UNIT PRIC AMOUNT BASE BID PHASE 2 Bond maximum 5% of total to in place LS 1 15 000.00 S 15 000.00 22 000.00 S 22 000.00 22,025. S 22 025.x0 $ 5 000.00 14,11M. S 14 836.00 20 000.00 S 20 000.00 10 000.00 S 10 000.00 15.000.00 S 15 000.00 Clewing ti Grubbbt Brush b Tree Removal, complete in a LS 1 15000.00 S 15000.00 5,000.00 f 5000.00 1,00D.00 S 1000.00 S 5000.00 13,864. 00 f 11884.00 S.000.00 S 5000.00 3,000.00 S 3000.00 7,5W. i 7,500.00 Sood FartlOzln Q Mulch! completem AC 3.59 2100.00 f 7,539.00 1 800.00 S 6,462.00 580.00 $ 2 0822MO S 1a nO.OD 8 653.00 24802.27 2 200.00 f 7898.00 850.00 S 2 333.50 1800.00 S 5 744.00 E(38) Apply far, Install and Maintain SWPPP (Stam Water Pollution Prevention Plan), com ete in ece LS 1 5.800.00 f 5 800.00 8 500.00 S 6.500.00 11000.00WS4,250.00 S 5,000.00 10,270.00 f 10 278.00 S.000.00 S 5,000.00 15 000.00 S /5 000.00 10 SOO.00 S 10.500.00 Testl Video b Clean Services complete in ace LS 1 15.000.00 f 1500000 3.000.00 S 3.000.00 1,950.00 8,000.00 S 8,000.00 5,571.00 5 5,571,00 4,000.00 S 4,000.00 18 500.00 S 18 500.00 8,500.00 $ 8,5W.00 40 Install b Remove Tom Orange SafetyFend complete le LS 1 4,000.01), S 4,000.00 7 5110.00 S 7 500.00 8,600.00 7,500.00 S 7,500.00 7,845.00 S 7,845.00 4,500.00 S 4,500.00 10 000.00 S 10,000.00 8.000.00 S 8.000.00 41 Trench Exavation System, complete in LF 1,925 250 S 4,015.00 1.00 S 1,928.00 0.01 200 $ 3 852.00 1.00 S 1 928.00 1.00 S 1,928.00 11.00 S 21.188.00 2.00 S 3,852.00 42 InsbD Manhole Delineator Posts wtlh MHS s complete in ace EA 5 150.00 S 750.00 250.00 S 1.250.00 850.00 100.00 3 500.00 120.00 S 600.00 200.00 S 1,000.00 300.00 S 1.500,00 305.00 S 1.525.00 43 Install Manhole Bollards complete in piece EA 5 450.00 S 2.250.00 300.OD S 1.500.00 500.00 $ 2,S00.00 350.00 S 1,750.00 260.00 S 1,300.0D 350.00 S 1.750.00 550.00 S 2,750.00 425.00 S 2125,00 44 12' PVC SOR-n Stub -out Open Cut complete in place LF 20 250.00 S 5,000.0 84.00 S 1.680.00 20.00 S 400.00 125.00 S 2.500.00 50.00 $ 1 OD0.00 95.00 S 1900.00 105.00 S 2100.00 125.001 S 2 500.00 45) .112"CImAxitAssemlily, complain in place EA 2 2.500.00 $ 5,000.W 3.000.01) S 6,000.00 1,300.00 S 200.00 i.500.00 S 3.000.00 1200.00 S 2 400.00 950.001S 1900.0 1000.00 S 2,110D.00 600.00 S 1.200.00 48 18' PVC SOR-n 1by Open Cut, depth 12' to 18' complete in place IF 729 117.00 S 85=00 105.00 f 76 545.00 178.00 S 129 76200 125.00 S 91,125.00 72.00 S 52 488.00 140.00 S 102 050.00 140.00 S 102 080,00 141.00 S 102.789.0 47 16" PVC SDR -n 1by Open Cut, depth 16' to 20 complete in piece LF 681 145.00 S 98 745.00 185.00 S 112 365.00 178.00 S 121218.00 145.00 S 98 745.00 61.00 S 55 161.00 150.00 S 102150.00 168.00 S 114 408.00 141.00 S 96,021.W 48 16" PVC SDR -26 Cut, depth 20' to 24 complete in place LF 518 185.0 S 85.140.00 300.00 $ 154.800.00 178.00 S 9180.00 200.00 S 103.200.00 10200 S 52 632.00 165.00 S 85140.00 245.00 S 126,420.00 141.00 $ 7Z756.00 (49) Standard Manhole. 4400t dia. With Boiled Lid (depth g), compete in ace EA 4 8500.00 S 26 000.00 5,800. S 23,20D.00 5 900.00 S 23 8DD.00 6500.00 S 26,000. 4.750.00 S 19 000.00 3 SO0.00 S 14 000,00 8 DDD.00 S 24 000.00 7,100,0D S 28,4W.00 (50) Drop 112' Manhole. 4400t die. With Bolted Lid (depth _8), complete in ace EA I 1 1 7,200.00 S 7.200.001 8 500.00 S 6,500.00 9.400.001$ 9.400.00 10 500.00 S 10.50D.00 7,137. S 7137.00 4,000.00 S 4,0D0.00 7 500,00 S 7,500.00 8,675.0D S 8.675.00 (51) Additional 4 -foot dia. Manhole Extra Depth (depth >81. complete in place VF 64 250.00 S 18.000.00 490.00 S 31 360.00 60.00 S 5120.OD 500.00 S 32 DDO.DD 325.00 S 20 600.00 500.00 S 32 ODD.OD 317.00 $ 20 288.00 350.00 S 22 400.00 52 Manhole Vent Assembly, complete in place EA 2 3,50D.00 S 7,000.00 2 000.00 S 4,000.0D 3 900.00 S 7 800.OD 3.500.W $ 7 DDO.DD 1410.00 S 6.820,00, 2,500.01) S 5 ODD.OD 4,S00.00 S %000,00 2,200.00 S 4.4W.00 53 DoletefOrnit 12" Cloanout AssamW from Phase 2 EA 1 1500.00 S I,500.00 3.000.00 S (3,0D0.00 1 30D.00 S 1300.00 1 500.00 S (I,5W.00) 745.00 S 745.00 950.00 S 950.00 (1.000.00) $ 1,000.00 500.00 S 500.00 TOTAL BASE BID (items 35 thru 53) PHASE 0 CONSTRUCTION f 407 032.00 f "8,668.00 It 444 074.46 S 41 9 942.00 f 299,00&27 S_4006174.00 f 489 045.50 is f 402 387.00 TOTAL PROJECT COST f 1,670,895m f IS 1,650,256.50 f 1 710 131 00 It 1.71213 66.97 f 1.703.613.00, is 1804 605.60 S 2jW,905.00 11. Connector bid $1,600 12. Contractor bid $1,000 13. Contractor bid 5442,887.00 22871 -Chander Creek 1 - Phase Wastewater Line Page 4 City of Round Rock Chandler Creek 1 - Upper Phase Wastewater Line Project Number: TWG# 22871 Bid Opening: June 26, 2014 Prota, Inc. $ 19292,412.00 Chasco Constructors $ 11374,717.00 Austin Underground Inc. $ 11416,270.00 Keystone Construction, Inc. $ 19447,097.00 Smith Contracting $ 11474,668.00 McLean Construction, Inc. $ 12517,555.50 Mountain Cascade of Texas LLC $ -125399355.00 Aaron Concrete Contractors, LP $ 115582897.00 Qro Mex Construction $ 19579,895.00 Cash Construction Co., Inc. $ 11609,187.00 SJ Louis Construction of Texas, LTD $ 116509256.00 Lewis Contractors, Inc. $ 11710,134.00 Kodiak Trenching & Boring, LLC $ 197129366.00 Patin Construction, LLC $ 11783,613.00 Rockin Q Construction $ 118049605.00 D Guerra Construction LLC $ 2,199,405.00 22871 -Round Rock Chandler Creek 1 - Upper Ph WWL Score Card Pagel THE 1 WA L, LAC E GROUP E V G I\1 E E R S A R C 111 T L C IF S July 2, 2014 5URvcv0RS WACO K I l LEEN City of Round Rock DALLAS 2008 Enterprise Drive ROUND ROCK Round Rock, TX 78664 Attn: Jeff Bell, Project Manager Re: Chandler Creek 1 — Upper Phase Wastewater Line Recommendation for Award of Contract Dear Jeff: The Wallace Group (TWG) attended the 2:00 p.m. bid opening on June 26, 2014 where sealed bid proposals were received and opened for the above referenced project. Sixteen (16) bids were received and read aloud. The apparent low Paul M. Boyer, PE, CFM bidder was Prota, Inc. (Prota) of Austin, Texas. TWG reviewed all bid proposals Dan M. Flaherty, RPLS for compliance and determined Prota to be in general compliance with the Sean M. Flaherty, RPLS Lonny 1'V. Gillespie. RPLS contract document requirements and declared the low bidder. q Kevin R. Glovier, PE George C.lezek, AIA David L. Marek, PE Prota's bid of $1,301 969.00 was 27.4% below TWG opinion of probable r p Darrell Va-ers. AIA, LEED-AP construction costs of $1,659,086.00 and 5.59% below the next lowest bid R.E. -Bob-C WallWetace, PPERPLS Scottaloud received. It should be noted that Prota's bid price is different than the value read at the bid opening due to mathematical discrepancies discovered in their - bid proposal. TWG received a list of references from Prota on June 30. All reference contacted gave favorable to satisfactory reviews for Prota. Based on our review of Prota's Bid Proposal and references, we recommend Prota for award of the construction contract in the amount of $1,301,969.00 for i the Chandler Creek 1 — Upper Phase Wastewater Line, should the City of Round Rock opt to construct both phases of construction. Respectfull Submitted, Scott Wetzel, PE Vice President The Wallace Group, Inc. SCW:scw Cold Toni Square email I Chisl foh n Trail SiiilP 130 Round Rock. Texac. 78681 cc: File - Project #22871 .512) 248-0065 Fax (.i1?! 346-0359 w,%%N%.w-aMace-group.com TBPE F-54