CM-2014-466 - 7/25/2014City of Round Rock /U RpOC� Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 2 with Waeltz & Prete, Inc. for the 24" Reuse Water Transmission Main - Phase 2 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/25/2014 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $6,038.88 Indexes: Self -Financed Water Construction Attachments: ReuseWaterPh2_Map, SC#2_ReusePh2_W&P_CM7.25.14 Department: Utilities and Environmental Services Text of Legislative File CM -2014-466 The City has developed a master plan in order to build a reuse water system in the northeast area of Round Rock. This project, known as Phase 2, will connect at the termination point of Phase 1 in Old Settlers Park and extend northward and connect to the existing Phase 3 line near the intersection of A.W. Grimes and County Road 112. This Phase 2 Project is the next step in the City's efforts in providing reuse water to this area of Round Rock. In August of 2012, the City selected Waeltz & Prete, Inc. to design this project based on the 2012 General Utilities Professional Services Request for Qualifications. The original Contract with Waeltz & Prete, Inc. was for a Preliminary Engineering Report and Feasibility Study that has been completed. That report determined the best route for the reuse pipeline. In June of 2013, City Council approved Supplemental Contract No. 1 for the Design, Bidding, and limited Construction Phase services for the project. This Supplemental Contract No. 2 is necessary because, after Design was complete, the City desired to add a Reuse Water Fill Station that will provide contractors reuse water for construction needs. The City also wanted to correct a drainage problem on the north side of the Dell Diamond parking lot adjacent to the future site of the filling station. The City's Staff recommends approval of Supplemental Contract No. 2 with Waeltz & Prete, Inc. for the amount of $6,038.88. Supplemental Contract No. 2 increases the previously amended contract to a total of $166,645.86. • Original Contract executed on August 23, 2012 ................................ $25,910.52 • Supplemental Contract No. 1 executed on June 13, 2013 ................. $134,696.46 • Supplemental Contract No. 2.............................................................. $6,038.88 • Total Contract...................................................................................... $166,645.86 Cify of Round Rock Page 1 Prinfed on 7/2=014 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Utilities and Environmental Services Project Name: 24° Reuse Water Transmission Main - Phase 2 Project Mgr/Resource: Jeff Bell ContractorNendor: Waellz &Prete, Inc. Council Action: ORDINANCE RESOLUTION QCity Manager Approval CMA Wording Consider executing: Supplemental Contract No. 2 wilh Waeltz & Prete, Inc. for the 24" Reuse Water Transmission Main -Phase 2 Project. Attorney Approval Attorney Date 0:\wdox\SCClnts\019911224\MISC\00307440.XLS Updated 6/3/08 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: ADDRESS: 3000 Joe DiMageio Blvd. #72. Round Rock TX 78665 PROJECT: 24" Reuse Water Transmission Main—Phase 2 This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Waeltz & Prete, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract', on the 23rd day of August, 2012 for the 24" Reuse Water Transmission Main — Phase 2 Project in the amount of $25,910.52; and WHEREAS, the City and Engineer executed Supplemental Contract No. I on June 13, 2013 to amend the scope of services and to increase the compensation by $134,696.46 to a total of $160,606.98; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $6,038.88 to a total of $166,645.86; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 1. City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. II. Article 2, Engineering Services and Exhibit B, En ineering Services shall be amended as set forth in the attached Addendum To Exhibit B,Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Supplemental Contract Rev.12/01/08 0199.1224;00307327 84275 CM -2014-466 Article 4. Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $6,038.88 the lump sum amount payable under the Contract for a total of $166,645.86, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. WAELTZ & PRETE, INC. By: 4t-- /4 - Q q j. A ?R-e4e � E Date Date Supplemental Contract 0199.1224;00274807 7 Rev.12/01/08 84275 I ADDENDUM TO EXHIBIT A City Services The following services shall be provided by the City of Round Rock for this project at no cost to the consultant or their sub -consultants: 1. The City will assign a Project Manager that will serve as a point of contact for the consultant for the duration of the contract. The Project Manager will assist the consultant with: requests for information; processing of periodic pay requests; and, answering consultant inquiries as they pertain to the analysis, design and/or construction of the project. 2. The City will make available to the consultant all information held by the City that the City in its sole discretion believes is germane to the project and will assist the consultant in the piovisign of his services, The City will provide one copy of said information to the consultant'in a format deemed appropriate in the City's sole discretion. I-Iowever, the City is not obligated to perform extensive research of its files or archives, and the information supplied to the consultant will be limited to readily retrievable and easily copied as determined by the City in its sole discretion. ADDENDUM TO EXHIBIT B Engineering Services PHASE H: FINAL DESIGN, BIDDING, & CONSTRUCTION 1. REUSE WATER LINE FILL STATION: a. Prepare construction documents for reuse water line fill station. b. Revise existing pavement at the fill station and provide erosion controls for existing area at the end of the parking lot. c. Prepare bid quantities and specifications for bidding, d. Provide construction phase administration, for the additional scope. (End of Scope) ADDENDUM TO EXHMIT C Work Schedule PHASE II: FINAL DESIGN, BIDDING, & CONSTRUCTION e Supplemental No..2 Scope completion 09/30/14 ADDENDUM TO I+ MUBIT D Fee Schedule Attached Behind This Page Exiblt D - FEE SCHEDULE: Waeltz & Prete, Inc. Civil Engineers Project: 24" Reuse Water Transmission Main - Phase 2 (Supplemental No. 2) 07/15/2014 Task Description PE PD EA SCT ECT ADM D.1 - Project Coord & Mt s 14 D 48 0 0 0 Total Hours 14 0 48 0 0 0 Salary Rate $47.00 $32.00 $30.00 $25.00 $18.00 $18.00 Direct Labor Cost $658.00 $0.00 $1,440.00 $0.00 $0.00 $0.00 Engineering Services Fee: Task Direct Labor Overhead Tot Iab+OH Fixed Fee Total Cost 1.57 12% D.1 • Pro ect Coord & Mt s 1 $2,098.00 F $3,293.86 1 $5,397.86 $647.02 $6,038.88 Total Engineering Fee $2,098.00 $3,293.86 $5,391.86 $647.02 $6,038.86 Sub Consultant Fees: N/A Reimbursable Expenses: N/A $0.00 TOTAL FEE FOR BASIC SERVICES $6,038.88