Loading...
Contract - Wiginton Hooker Jeffry, P.C. - 12/4/2014SUPPLEMENTAL AGREEMENT NO.2 TO "CITY OF ROUND ROCK AGREEMENT FOR ARCHITECTURAL SERVICES" FOR A ROUND ROCK FIRE STATION WITH WIGINTON HOOKER JEFFRY, P.C. CITY OF ROUND ROCK ) STATE OF TEXAS ) KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON ) COUNTY OF TRAVIS ) FIRM: Wiginton Hooker Jeffry, P.C. ADDRESS: 209 East Riverside Drive, Austin, Texas 78704 PROJECT: Round Rock Fire Station This Supplemental Agreement No. 2 to "City of Round Rock Agreement for Architectural Services" for a City of Round Rock Fire Station is made by and between the City of Round Rock, Texas (hereinafter referred to as the "City"), and Wiginton Hooker Jeffry, P.C. (hereinafter referred to as "Architect"). WHEREAS, the City and Architect executed an Agreement (hereinafter referred to as the "Agreement") on the 11 `h day of the month of September, 2014, for provision of professional architectural services and design services related to the new construction of a Round Rock Fire Station; and WHEREAS, the City and Architect also executed Supplemental Agreement No. 1 on the same date; and WHEREAS, it has now become necessary to amend the Agreement to increase the not -to -exceed fee as a result of the City's requested increase in the size of the proposed prototype fire station from 9,500 square feet to 11,232 square feet; NOW, THEREFORE, premises considered, the City and Architect agree that said Agreement is amended as follows: I. Section 1.1.2.5 of the Agreement shall be amended by addition of the following: The Fee Schedule relative to this Agreement shall s Services in the amount of $54,297.00 to the previous not -to increased not -to -exceed amount of $382,737.00, as described Agreement No. 2. 00315869/ss2 how an increase for Basic Professional exceed amount of $328,440.00, for an in Exhibit "A" to this Supplemental IN WITNESS WHEREOF, the City and Architect have executed this Supplemental Agreement No. 2 in duplicate originals. CITY OF ROUND ROCK, TEXAS By: , / Printed Name: It Title: Date Signed: 11'Z. FOR CITY, ATTEST: By: Q040'. w0fa Sara L. White, City Clerk FOR CITY, OVED AS TO ORM: By: Stephan L. _SheAj City Attorney 2 WIGINTON HOOKER JEFFRY, PC By: Printec Title: Date S WIGiNTON HOOKER JEFFRY,PC = u 209 East Riverside Drive Austin, Texas 78704 ph 512.447.1418 Ix 512.448.0102 www.whjarch.com November 5, 2014 Travis Wilkes via e-mail: twilkes@roundrocktexas.gov Building Construction Manager General Services Division, City of Round Rock 212 Commerce Blvd. Round Rock, Texas 78664 Re: Supplemental Agreement No. 2 (to contract dated September 11, 2014, Resolution R- 2014-1771) for Changes in Services of the Architect for Adjusted Station Size/ Cost Dear Travis: At your request, Wiginton Hooker Jeffry (WHJ) offers the following supplemental agreement to the above -referenced contract for professional design services. This proposal addresses Changes in Services of the Architect for a change to the station size and cost. This proposal supersedes the one dated November 4. For the change in project size and cost, Wiginton Hooker Jeffry requests an additional $54,297, bringing the total not -to -exceed fee for the prototype/ Red Bud Station design to $382,737. This amount covers professional services rendered during Schematic Design, Design Development, Construction Documents, Bidding/ Negotiation, and Construction Administration phases for Architectural, Civil, Structural, and MEP Engineering services. No change is proposed for Basic+Enhanced Programming, Record Drawings, or Reimbursables. The final program for the station is for a building of 11,232 square feet, which is an 18% increase over the 9,500 square feet contemplated in the Agreement. The adjusted Construction Cost is $4,019,296, which also represents an increase of 18.% Per Article 1.3.3.2 of the Agreement, a change of more than 10% in size or cost is subject to an adjustment through a Supplemental Agreement. The revised fee breakout for the Red Bud station is: Schematic Design $72,347 Design Development $108,521 Construction Documents $90,434 Bidding/ Negotiation $18,088 Construction Administration $72,347 Subtotal: $361,737 Basic + Enhanced Programming $11,000 (no change) Record Drawings (Allowance) $3,000 (no change) Reimbursables (Allowance) $7,000 (no chan.,e) Total $382,737 EXHIBIT "A" Supplemental Agreement No. 2 November 5, 2014 Page 2 of 2 We look forward to continuing our work with the City of Round Rock. Please contact us if you have any questions or concerns. Sincerely, M 11 Fi, '-k - Michael Boyle, AIA, CBPE Senior Associate The Texas Board of Architectural Examiners has jurisdiction over complaints regarding the professional practices of persons registered as architects in Texas. TBAE may be contacted at: 333 Guadalupe, Suite 2-350; Austin, Texas 78701; 512-305-9000; www.tbae.state.tx.us EXHIBIT "A"