CM-04-12-087Cnn,OL% p — c� I Request for City Council/City Manager Action Please submit this form when placing items on the council agenda or when submitting an item to the City Manager for approval. Department: Engineering and Developmental Services Project Manager/Resource: Michael Thane Contact Person: Latha or Laura (Kathy) Council Meeting Date: NA Project Name: South Creek Channel Improvement Funding Source: Capital Project Funds (G.O. 2001) ContractorNendor Name: Epsey Consultants, Inc. Amount: Assigned Attorney: Steve Sheets / Rose $7.962.00 (contract, agreement,amendment,change order, purchase order,etc.) Is Funding Required? Yes Council Agenda Item Yes Submission to City Manager - Yes X X No No n No Rsittu--J�, �t3 LIEU LUU44 (see required signatures below before submission to the City Manager) ▪ Initial Construction Contract ▪ Construction Contract Amendment Change Order # n Change in Quantity El Unforeseen Circumstances ▪ Initial Professional Services Agreement Amount ▪ Supplemental Professional Svcs. Agr. # 1 $7,962.00 Purchasing/Service Agreement ▪ Purchase Order Item(s) to be purchased: ▪ Other (Please clearly identify action on lines below) Agenda Wording: Consider an action by the City Manager to execute Supplemental Agreement # 1 to the Agreement for Engineering Services with Espey Consultants, Inc. for the South Creek Channel Improvement Project. For Submission to City Mana•er On! Project Mgr. Signature:b . /jj rte,,. Date: 441/S /o1 Dept. Director Signature: _L _ .— if- Date: / Z%/5104— City Attorney Signature: `\ ' • �; i of 1 Date: 4 d City Manager Signature: Date: / * Le al pproval is required for all items requesting City Manager's approval. Finance Approval El Finance -Date and Signature: L. Olsen 12-15-04 Purchasing -Date and Signature: XO Budget -Date and Signature: N/A ESW 12/15/04 g/administration/cmgr-council action.xls 11-1-04 DATE: December 10, 2004 SUBJECT: City Manager Approval ITEM: Consider an action by the City Manager to execute Supplemental Agreement No. 1 to the Agreement for Engineering Services with Espey Consultants, Inc. for the South Creek Channel Improvement Project. Department: Engineering and Development Services Staff Person: Michael Thane, Sr. Engineer/Engineering Manager Justification: Espey Consultants is designing improvements to channel and drainage systems in the interest of flood control, appearance, and to facilitate maintenance for the Dry Branch Tributary No.1 channel that extends from A.W. Grimes Boulevard easterly through the South Creek Subdivision. A 24 -inch wastewater line currently extends across the channel where the proposed improvements will occur. Because of conflicts with the flow lines, the City has requested that Espey investigate alternative alignments for the existing wastewater line as it crosses Dry Branch Tributary No. 1. This Supplemental Agreement No. 1 includes Espey analyzing several alignment alternatives, including rerouting upstream, use of sag sewers, and installing sag drains. Espey will design and provide plans, specifications, and a cost estimate using the selected wastewater alignment from the analysis. Espey will incorporate the wastewater line design into the existing plans for the channel improvements. Funding: Cost: $7,962.00 Source of funds: Capital Project Funds (GO Bond 2001) Outside Resources: Espey Consultants, Inc. Background Information: Dry Branch Tributary No. 1 channel traversing through South Creek subdivision is difficult to maintain and is critical for carrying flood waters safely through the subdivision. This same channel is experiencing stabilization problems near its intersection with Gattis School Road. Also, there have been flooding problems in the Greenslopes Subdivision just west of Dry Branch Tributary No. 1 near the northern intersection of Greenlawn Blvd. and Parkside Circle. This project will provide design of channel improvements that will increase channel capacity and improve the appearance and maintainability of Dry Branch Tributary No. 1. The City Manager approved the original agreement with Espey Consultants, Inc. on September 10, 2004. Public Comment: N/A STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: Espey Consultants, Inc. ("Engineer") ADDRESS: 3809 South 2nd Street, Suite B-300, Austin, TX 78704 PROJECT: South Creek Channel Improvements This Supplemental Agreement No. 1 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Espey Consultants, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement", on the 10th day of September, 2004 for the South Creek Channel Improvements Project in the amount of $12,754.00; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services, to increase the compensation by $7,962.00 to a total of $20,716.00, and to modify the provision for notices to proceed; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scope Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $7,962.00 the lump sum amount payable under the Agreement for a total of $20,716.00, as shown by the attached Addendum to Exhibit D. Supplemental Agreement Espey-south creek channel improve; 78075 Rev.03/02/04 64836 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. ESPEY CONSULTANTS, INC. By: Date CITY OF ROUND ROCK By: es R. Nuse, P.E., City Manager Z- 20-041 Date Supplemental Agreement Espey-south creek channel improve; 78075 2 APP VED AS TO ORM: 1 Steph n L. Sheets, City Attorney Rev.03/02/04 64836 ADDENDUM TO EXHIBIT B Services to be Performed by the Engineer The changes to the scope of this project are as follows: EXHIBIT B Engineering Services Work Breakdown Structure 1. Alignment Alternatives Analysis — EC will investigate alignment alternatives for the existing 24" wastewater line as it crosses Dry Branch Creek. We anticipate analyzing 4 to 5 alignment alternatives, including rerouting upstream, use of sag sewers, and installing sag drains. Analysis will also include iterative HEC -RAS modeling of Dry Branch Creek Tributary No. 1 as necessary. Approximately two project meetings and five conference calls will be necessary to complete the analysis. EC will verbally recommend a design solution to the City of Round Rock. No written report will be prepared. 2. Wastewater Line Design — EC will design and provide plans, specifications, and a cost estimate using the selected wastewater alignment from the previous analysis. EC will incorporate the wastewater line design into the existing plan and profile sheets; however, additional details and sections will be required to accurately describe the proposed work. This work will be included in the next submittal to the City (anticipated to be the 90%). It is anticipated that this design will not include any additional survey or geotechnical investigations. ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: EXHIBIT D Fee Schedule Budget Estimate A budget breakdown by task is included in the following table. The total estimated fee is $7,962, which includes an estimated $50 for expenses. The total authorization for this project is increased to $20,716.00. LABOR COST DETAIL Description 1 Alignment Alternatives Analysis 2 Wastewater Line Design subtotals: average raw labor rate: subtotal by labor classification: COST SUMMARY Labor Man -Hour Estimate by Labor Classification Project Engineering Principal Manager Staff Technician Admin 1 16 16 8 1 1 8 24 8 1 2 24 40 16 2 $ 50.00 $ 43.00 $ 30.00 $ 16.50 $ 15.00 $ 100 $ 1,032 $ 1,200 $ 264 $ 30 Subtotals Time Cost (hrs) ($) 42 $ 1,365 42 $ 1,261 84 $ 2,626 Direct Labor Overhead Rate (Fringe Benefit) 31% x Labor $ 814 General and Administrative Overhead Rate 138% x Labor $ 3,624 Profit (12% of Total Labor Cost) $ 848 Total Labor Cost (Incl. Profit) $ 7,912 Expenses (mileage, courier, reproduction, etc.): $ 50 TOTAL: $ 7,962