Loading...
CM-05-02-018Request for City CounciUCity Manager Action Please submit this form when placing items on the council agenda or when submitting an item to the City Manager for appal. y d Department: Contact Person: Project Name: ContractorNendor Name: Amount: Engineering & Development Services Project Manager/Resource: Michael D. Thane Kathy/Latha Shaded Way Drainage Improvements Chasco Contracting ($1,700.00) Is Funding Required? Yes No n Council Agenda item Yes No n Submission to City Manager - Yes X No n Council Meeting Date: Not Applicable Funding Source: Assigned Attorney: Steve Sheets .a Regional Detention j (contract, agreement,amendment,change order, purchase order,etc.) -1 of k'e')txrrir to Cc Lyvw't (see required signatures below before submission to the City Manager) Agenda Wording: ElInitial Construction Contract ▪ Construction Contract Amendment ❑X Change Order 0 Change In Quantity 0 Unforeseen Circumstances ▪ Initial Professional Services Agreement • Supplemental Professional Svcs. Agr. ElPurchasing/Service Agreement Purchase Order Item(s) to be purchased: Amount (1,700.00) ▪ Other (Please clearly identify action on lines below) Consider an action by the City Manager to execute Change Order No. 1 for Chasco Contracting due to results from the construction project for drainage improvements on Shaded Way in Round Rock. For Submission to City Manaaer Only Project Mgr. Signature: Dept. Director Signature: City Attorney Signature: cat mosee Date: 21 210 Date: al f Date: 42/0 Date: a- 4 -05 proval Is required for all items requesting City Manager's approval. Finance Approval Finance -Date and Signature: D Purchasing -Date and Signature: ElBudget -Date and Signature: E. Wilson for L. Olsen 2/1/05 N/A I -IB 01-31-05 N/A CYD 1-31-05 glabninistralionkmgr-conal adionxls 11-1-04 DATE: SUB3ECT: ITEM: BLUE SHEET FORMAT January 28, 2005 City Manager Approval - February 4, 2005 Consider an action by the City Manager to execute Change Order No. 1 for Chasco Contracting due to results from the construction project of drainage improvements on Shaded Way in Round Rock. Department: Staff Person: justification: Engineering & Development Services Michael D. Thane, Engineering Manager/Senior Engineer Drainage improvements have been completed at Shaded Way in the Oak Bluff Estates subdivision. During construction, it was determined that two bid items could be deleted from the contract. These items were the installation and removal of temporary mailboxes for the residents in the cul-de-sac, and the removal and reinstallation of a brick paver driveway. Although the addition of irrigation work on the resident's property was required by the contractor, which resulted in an increase cost for that bid item, by deleting the two previously mentioned bid items, the final total project cost was reduced by $1,700. Funding: Cost: Reduction of -$1,700.00 Source of funds: Regional Detention Outside Resources: Chasco Contracting Background Information: The City of Round Rock annexed the Oak Bluff Estates Phase 2 area as an existing subdivision in February 2003. The current Subdivision Ordinance requires that the Storm Water Collection Systems have the capacity to collect and convey the runoff from a 25 -year storm. The resident at 13 Shaded Way in the Oak Bluff Estates subdivision contacted the City about being flooded multiple times in recent years. Based on their concerns, the Engineering staff performed a storm water flows analysis. This study found that the Shaded Way Stormwater Collection System was not appropriately designed to carry the runoff form a 25 -year storm. The City increased the Shaded Way Storm Water Collection System conveyance capacity with the addition of a parallel pipe. The capture rate was increased with two new curb inlets, and the redirection of surface runoff flows. Project improvements gave the system the capacity to carry the runoff from a 25 -year storm, as required by the City of Round Rock Subdivision Ordinance. Public Comment: N/A Blue Sheet Format TL.,1.A,..1 /N Pln/nn 01/28/2005 13:58 FAX 5122185563 CORR PUBLIC WORKS Z002 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Public Works PAGE 1 OF 1 DATE: 1/28/05 PROJECT: Shaded Way Drainage Improvements CHANGE ORDER NO: JUSTIFICATION: $114,411.00 1 Repair of Irrigation System ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: 1 $0.00 2 Install and Remove Temp. Mail Boxes ($1,700.00) 3 Remove & Reinstall Brick Paver Drwy ($1,700.00) TA -.... .-..-..-•..,...., P`+em,.n-....._.•...• ............._-.......•.-.,.n,.,..on•...r.a.e.a..Y-'41LIT�tG'SY:..n........ ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT n+..n.-N...It.I.,..,..o.J.....��_.na,p..r..o..r.....�.... ADDED DAYS CALENDAR/ WORKING .......nq,.�...............n-...............-....-nmr...y.-n.inp.........:i.�u;.y..,i,.......-.r.r.i-....._.--...--�.....i......yu.-..�, :.....,....rn.. i..........-._..w,n+.y......... . _ ..-1.::fnr.,,.-.. �. ......................... 41 Repair Irrigation System EA 17 $100.00 $1,700.00 0 43 Credit - Install & Remove Temporary Mail Boxes LS 1 $1,200.00 ($1,200.00) 0 44 Credit - Remove & Install Brick Paver Driveway SY 20 $110.00 ($2,200.00) 0 TOTAL: ($1,700.00) 0 PREPARED BY: rp- r. 1/28/ PERCENT OF ORIGINAL CONTRACT PRICE GINEER Chasco Contracting DATE ONTRACTOR BY: TITLE: APPROVED: THIS CHANGE ORDER: ($1,700.00) PREVIOUS CHANGE ORDER: 0 TOTAL % CHANGE: -t40% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $112,711.00 CITY OF ROUND ROCK constco2/formse'lk SHADED WAY DRAINAGE IMPROVEMENTS PROJECT y IROUND ROCK, TEXAS PU+YOSL. PASSION Pf2OSP JTY