Loading...
CM-05-09-170Request for City Council/City ManageriketailEp City Council rEll City Manager Submit completed form for ALL City Manager and City Council approve Department Name: Contact Person: Transportation Services Cindy Fronk (CM ONLY)/Latha Kumar Project Manager/Resource: Bin Stablein Project Coordinator: Thomas G. Martin, P.E., Director of TS Assigned Attorney: Barbara Bouleware-wens Council or City Manager ApprovallAgenda Date: 9/23/2005 Blue Sheet Wording Project Name: Red Bud Lane rministration Use ONLY Tag #: Documents: Scan Date: Return to: c,- -O°1r rib Ric Bowden ContractorNendor: Baker-Aickten & Associates Inc. Funding Source: 4B Amount: s1,000.00 The attached is a Letter of Agreement with Baker-Aicklen & Associates, Inc., for the preparation of right-of-way documentation associated with the Red Bud Lane Project. Finance Information Is Funding Required? Ei Yes >D No Initial Construction Contract Construction Contract Amendment # Change Order # Change in Quantity Unforeseen Circumstances Initial Professional Services Agreement Supplemental Professional Svcs. Agr. # Purchasing/Service Agreement Purchase Order Item(s) to be purchased: Amount (XXXX)000< Other (Please clearly identify action on lines below) LOA - prepare a sketch, metes & bounds description of a ROW taking for the Heinke Tract (Red Bud Lane) Finance Approval Finance Finance Purchasing El Budget 51,000.00 E. Wilson for L. Olsen N/A E. Wilson N/A-CYD Date 21 -Sep Date 21 -Sep Date Date 9/20/2005 For Submission to ALL City Council and City Manager Action Items Project Mgr. Signature: Dept. Director Signature*: City Attorney Signature*: City Manager Signature: * Dept Director and Le Bill Stablein Date: 9/19/2005 Thomas G. Martin, P.E. Date: 9/19/2005 Date: i/�C.W dS Date: (4-20-Os pproval and is required for ALL items requesting City Manager/City Council approval. Updated 6-9-05 Date: September 19, 2005 Subject: City Manager Action - September 23, 2005 Item: The attached is a Letter of Agreement with Baker-Aicklen & Associates, Inc., for the preparation of right-of-way documentation associated with the Red Bud Lane Project. Department: Staff person: Justification: Transportation Services Thomas G. Martin, P.E., Director of Transportation Services This Letter of Authorization is to allow Baker-Aicklen & Associates, Inc., to prepare a sketch and metes and bounds description of a right- of-way taking for the Heinke Tract in association with the Red Bud Lane project. Funding: Cost: Source of funds: $1,000.00 Outside resources: Baker-Aicklen & Associates Inc. Background information: In order to move the utilities, Baker-Aicklen & Associates, Inc., will obtain field notes for the Highland Tract on Red Bud Lane from CR 123 south to complete the east side acquisition. Public comment: N/A Sponsor: N/A BAKER-AICKLEN ASSOCIATES, INC. ENGINEERS/SURVEYORS. Design Professional Firm: Date: CLIENT COPY 17v.:= -- LIMITED SERVICES AUTHORIZATION BAKER-AICKLEN & ASSOC., INC. 405 Brushy Creek Road Cedar Park, Texas 78613 September 16, 2005 Project Name/Location: County Road 122, Round Rock, Texas Client: City of Round Rock LS-lim-03 2008 Enterprise Drive Round Rock, TX 78664 Attn: Bill Stablein Ph: 218-3237 Fax: 218-5563 Contract No.: 05-7194 Scope/Intent and Extent of Services: 1. Prepare a sketch and metes and bounds description of a right-of-way taking for the "Heinke" tract, Lot 1, Block 2, Greenfields Subdivision. Fee Arrangement: Lump sum basis in the amount of $1,000.00, plus reimbursable expenses. Special Conditions: Prepared by: Margaret A. Nolen, RPLS (Printed Name/Title) The Professional Services Agreement on the reverse side of this form as well as the attached rate schedule are a part of this Agreement. Accepted by: R. David Strutton, RPLS, Survey/GIS Mgr. (Printed Name/Title) Baker-Aicklen & Associates, Inc. (Name of Design Professional Firm) ature) Date curles l • A ost_, PL. f Cr'- �'I'lQtca�er (Printed Name/Title) Cc o ku d /20&_ (Name dt Client) STANDARD RATE SCHEDULE Labor Rate Table 44 Effective May 1, 2005, the following rates are recommended for work performed on an hourly -charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIRECT LABOR OFFICE PERSONNEL SERVICES Classification Rates Project Manager $120 per hour Project Engineer/Surveyor/Planner $115 per hour GIS Project Manager $105 per hour Staff Engineer/Surveyor/Planner $105 per hour Project Designer/Coordinator $105 per hour Engineering/Surveying/Planning Associate $100 per hour Engineering/Surveying/Planning Assistant $ 85 per hour GIS Analyst $ 80 per hour Senior Engineering/Surveying CAD Technician/Field Representative $ 75 per hour Engineering/Surveying CAD Technician/Field Representative $ 65 per hour CAD/GIS Technician $ 55 per hour Administrative Assistant $ 55 per hour Expert Witness/Testimony/Deposition Services Two Times Rate Department Head $125 per hour Branch Manager $135 per hour Principal (as appropriate) $150 per hour FIELD PARTY SERVICES Rates 1 -Man Field Party $ 75 per hour 2 -Man Field Party $115 per hour 3 -Man Field Party $145 per hour 4 -Man Field Party $175 per hour DIRECT EXPENSES Transportation: By Firm's Passenger Vehicles (Note 1) $ 0.40 per mile By Firm's Survey Trucks (Notes 1, 2, 3 & 4) $ 0.40 per mile Direct Expense - Reproduction & Printing by Firm, Prevailing Com - Survey Stakes, Lathes, Iron Rods, mercial Rates Or Subsistence of out -of -city services, and other Direct Expense Cost Plus 10% Notes: 1. A mileage charge will be billed for projects exceeding a 50 -mile radius of the base office only. 2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes, etc., used such as during the construction phase of a project will be charged as indicated. 3. A minimum of two (2) hours field party time charge will be made for show -up time and return to office, resulting from inclement weather conditions, etc. 4. Field Party stand-by time will be charged for at the above -shown appropriate rates. 5. The firm's professional liability is limited to the total amount of compensation under the Professional Services Agreement to a maximum of $1,000. BAKER-AICKLEN & ASSOCIATES, INC. ENGINEERS; SURVEYORS