Loading...
CM-06-04-06390485K Round Rock, TX REIMBURSEMENT AGREEMENT TS REIMBURSEMENT AGREEMENT (herein "Agreement") is made and entered into and effective this / day of , 2006, by and between MCI COMMUNICATIONS SERVICES, INC., a Delaware corporation (herein "M I"), on behalf of itself and/or its Affiliates (), having a mailing ailing address at 2400 North Glenville, Richardson, Texas 75082, and CITY OF ROUND ROCK, TEXAS, a Texas home -rule municipal corporation, (herein "Reimbursor"), having a mailing address at 221 East Main Street, Round Rock, Texas 78664. "Affiliate" means an entity that directly or indirectly owns or controls, is owned or controlled by, or is under common ownership or control with, MCI. For the purposes of this Agreement, "own" or "control" means to own an equity interest (or equivalent) of at least ten percent (10%), or the right to control the business decisions, management and policy of another entity performing any of the obligations set forth in this Agreement. WITNESSETH: WHEREAS, Union Pacific Railroad ("Railroad") owns and maintains the railroad right-of-way located at the crossing of Red Bud Lane/Williamson County Road 122 , Williamson County, Round Rock, Texas ("Railroad ROW") and MCI is a Grantee of an easement obtained from the Railroad on Railroad ROW ("Easement"); and WHEREAS, MCI has fiber optic cables located in the Easement ("Facilities"); and WHEREAS, Reimbursor is widening Red Bud Lane/Williamson County Road ("WCR") 122 from US 79 to WCR 123, Williamson County, Round Rock, Texas as depicted on the location map attached hereto and incorporated herein as Exhibit C (the "Road Widening") and has been granted a license by the Railroad to construct such Road Widening; and WHEREAS, as a result of Reimbursor's construction activity for the Road Widening, Reimbursor has requested MCI to relocate or protect a portion of its Facilities without cost or risk to MCI; and WHEREAS, MCI, under the terms hereinafter stated, is willing to undertake such relocation or protection of its Facilities (herein the "Project") solely in order to accommodate Reimbursor, provided Reimbursor reimburses MCI for all of its costs, both direct and indirect, associated with the Project. NOW THEREFORE, in consideration of the promises and mutual covenants herein contained, MCI hereby agrees to undertake the Project in accordance with the attached Exhibit A, subject to the following terms and provisions: 1. Reimbursor agrees that Exhibit A represents the scope of work for the Project. 2. Reimbursor may, at its own expense, inspect construction performed by MCI in connection with the Project. 3. Except as provided in paragraph 4, Reimbursor agrees to bear all direct and indirect costs incurred by MCI and relating to any construction by MCI in connection with the Project. Reimbursor waives any and all delay damage claims, except if caused solely by the gross negligence or willful misconduct of MCI. 4. The total cost of the Project is estimated to be Twelve Thousand Four Hundred Fifty and No/100 Dollars ($12,450.00), as detailed in Exhibit B. Reimbursor acknowledges and agrees that this amount is an estimate and shall not be construed as limiting the amount MCI is to be reimbursed by Reimbursor under this Agreement. MCI shall provide notice to Reimbursor when MCI becomes aware that actual costs will exceed the estimate by more than ten percent (10%). MCI may, in its sole discretion, submit to Reimbursor an itemized invoice for actual Project costs not more often than monthly. Reimbursor shall pay the full invoice within thirty (30) days' following receipt of same. 5. Following the completion of this Project, MCI shall make an accounting of final, unpaid, actual costs of the Project and provide Reimbursor with a copy of said accounting and an itemized invoice therefor. Reimbursor shall pay the full invoice within thirty (30) days after receipt. 6. No work shall be performed by Reimbursor within ten feet (10') on either side of the existing MCI facilities in the right-of-way until the Project has been completed. 7. The obligations of MCI are subject to force majeure and MCI shall not be in default of this Agreement if any failure or delay in performance is caused by strike or other labor problems; accidents; acts of God; fire; flood; adverse weather conditions; material or facility shortages or unavailability; lack of transportation; the imposition of any governmental codes, ordinances, laws, rules, regulations or restrictions,including, without limitation, the necessity of obtaining permits or environmental assessments or environmental approvals; condemnation or the exercise of rights of eminent domain; war or civil disorder; or any other cause beyond the reasonable control of MCI. 8. Written notice shall be given to MCI by Reimbursor at least forty-eight (48) hours, excluding Saturday, Sunday and legal holidays, in advance of commencement of any work in the immediate permitted area, but not within said ten feet (10') on either side, of the MCI facilities as set forth in Section 6, above. Said notice shall be given to those individuals listed on the Contact Sheet of Exhibit A. In the event of an emergency, Reimbursor shall provide telephonic notice to MCI at 1 -800 - MCI -WORK upon Reimbursor's notice of such emergency. 9. This Agreement supersedes every antecedent or concurrent oral and/or written declaration and/or understanding by and between MCI and Reimbursor pertaining to the Project. 10. The terms of this Agreement shall be binding upon and inure to the benefit of the parties hereto and their successors and assigns. 11. Each party warrants that it has the full right and authority to enter into this Agreement. All necessary approvals and authority to enter into this Agreement have been obtained and the person executing this Agreement on behalf of each party has the express authority to do so and in so doing, to bind such party hereto. IN WITNESS WHEREOF, the parties have executed this Agreement as of the day and year first above written. CITY OF ROUND ROCK, TEXAS Bv. : James R. Nuse anager, City of Round Rock, Texas Date: Attest: By() E rJ� Name:C/-i j j5 i/ 6Ae j, Slecretary MCI COMMUNICATIONS SERVICES, INC. By:6)r1 Tom E. Avila Senior anaqr OSP National Support Date: a / 0) --0C) (p 2 EXHIBIT A Scope of Work ROUND ROCK, TEXAS - CR 122/123 LD Cable Protection MCI Project # 90485K BACKGROUND: City of Round Rock, Texas is making improvements and widening the road crossing at County Road 122 and the Union Pacific Railroad tracks (about mile post 157), Round Rock, Williamson County, Texas conflicting with MCI long distance facilities. SCOPE OF WORK: MCI will expose 150 feet of MCI long distance duct and place 4 inch split steel over the duct for protection. CONTACTS: MCI Project Manager: Jordy Reeves Off # 972-729-7407; Cell # 214-674-0555 Email : j ordy.reeves@verizonbusiness.com Agreements: Kay Parsons Off # 972-729-5005 Email: kay.parson@verizonbusiness.com City of Round Rock, Texas: David Bartels, Transportation Project Manager 212 Commerce Cove, Round Rock, TX 78664 ph # 512-218-6617 Regional Manager: Steve Purcell Off # 972-729-7091 1) rnsmission Systems Const MU Project Budget 3/14/2006 )t1O° EXHIBITB Page 1nf2 2 Project #: 90485K Revision: 1 Date Title: ROUND ROCK. TX CR 122/123 LD CABLE PROTEC.weer: Engi Prepared: Site Code: ATINTX Lead Engineer: Capital Project Capital Prj. Tide: Regen/R gen Spans: ESTIMATED ENGINEERING TIME: (DAYS) Engineering: 4 Drafting: As Bath Doc. TJME FRAME TOTAL 3/14/2006 REEVES. JORDY City: ROUND ROCK State: Texas Footage: 250 ESTIMATED CONST, TIME; (DAYS) Construction: 6 TIME FRAME TOTAL: 6 ....:?:$4:•s:�;{ryl?%l } ��:'�';�c�df �.lt '�f �,,, ,� �' y� 2 t�>s {, � f � y ` • ',+;.. ''�' ?%f r..a%Ap�•,gud; '�i":' t�37�}ri5;>S,'.,�:,vi• i c t �} � �,� • f.: f�:.:6•�',r:'.'•f?%:��'.5�1f/�;+.,, �r� s �£ li � �.�G,'.iF�•'' f%'"r:",?�{� �'� <��ff. . < 1"• .�`"•t�s"'6;^i5°? 4N�'fir Investgation#: 9573— 20Q5 :~ f s 's` j>�,n}, : ..a;. f•.a, {' . �•>> Eng. Start: Eno, Complete: Diadosition: Refund A) B) C) D) E) F) G) H) ENGINEERING INSPECTION SERVICES MCI FURNISHED MATERIALS CONTRACTOR UNIT PRICE SCHEDULE SPLICING LABOR SUBTOTAL OVERHEAD - 20% OF ITEMS A C & E OVERHEAD - 5% OF ITEM D ,f /y:<.r,rs ft 5•yr:•.�;,,• : }:... OT�.{L—{L��.O/, A✓D,JE;�•D}yPROJECT COST OSTkF¢`,c•. ', �•�t ;.+: tf��Wyy4� , ' f REF DESCRIPTION <.<.. QTY UNIT $ EXT. $ RnoinPPr Dave anternnll 4 $520.00 $2,080.00 Construction. Start: 5/15/2006 Construction Complete: 5/30/2006 $2,080.00 $4,220.00 $0.00 $6,150.00 $0.00 $12,450.00 $0.00 $0.00 •.r... 4A:f7': f•:•}:•. $12,450.00 /% s 2't, a.f ri;'' 3� '' i. r r' o t %,•<a::.:�,',ri,: Lead Engineer: ENGINEERING Sub TOTAL $2,080.00 Date: nsmission Systems Const tion R&U Project Budget 3/14l200b EXHIBIT B Page 2nf2 2 1) 5) REF DESCRIPTION MC"T TncnArtnr ant. mnh 1(Internml) Railroad Plaaman DAYS QTY UNIT $ 6 1 $520.00 1 $1,100.00 1 INSPECTION SERVICES Sub TOTAL EXT. $ $3,120.00 $1,100.00 $4,220.00 REF DESCRIPTION 2.2) 210R Plan C:nnd (Smit GSP/RSPl UNITS QTY UNIT $ FT CONTRACTOR UNIT PRICE Sub TOTAL 150 $41.00 EXT. $ $6,150.00 $6,150,00 v ii; 1 Cl) E-1 w 'A' H g „a ,itzz z gam; o V 0 itta c) 40 o R, 8 >-( 0 COUNTY ROAD 122 s i- `v _ •\ 'v,� ; 1* 1 , _ f 1r: 5. "--- lj -,-r� , �T r. aJ La 0 Z i � o f MT' 9imi.V �1�1� yOji i MIyM offr WOY J gf tP g V `Q pMmp¢ vast) PW 6M'!6 r3lp1 9coawr (Arid NOC 5711327Pla ` 7ld ri 1 1 1 1 1 1 _1AV -atY 6L '6P9 f dVOtl1I '6 P9 •£8 'WS MI, HUM twrlstx3 AISOd0id SNV1d ZOO I. 40 40• 0 40 m allo6 ' ml AXe4a9AV vs �9 m v c 0 z CR 123 eRed Bud Lane(CR 122) Phase 3IMNM�oV,�,� DATE: SUBJECT: ITEM: April 7, 2006 City Manager Action — April 14, 2006 Action authorizing the City Manager to execute a reimbursement agreement with MCI Communications Services, Inc., for the for the Red Bud Lane, Phase III project. Department: Transportation Services Staff Person: Justification: Thomas G. Martin, P. E., Director of Transportation Services This agreement will provide reimbursement to MCI Communications Services for encasing their fiber optic cable. The MCI fiber optic cable crosses Red Bud Lane (CR 122) within an easement in the Union Pacific Railroad right-of-way. The casing will protect both the widened roadway and the fiber optic cable. Funding: Cost: $12,450.00 Source of Funds: 4 B -RR Transportation Development Corporation Outside Resources: MCI Communications Services, Inc. Background Information: The limits of the Red Bud Lane (CR 122) Phase III improvements are from US 79 to CR 123. The improvements include widening the roadway and railroad crossing and replacing and widening the existing bridge. Public Comment: N/A Request for City Council/City Manager Action ID 1 City Council o City Manager Submit completed form for all City Manager and City Council approvals. EC D APR t, 6 For Administration Use ONLY Receiv d: Tag *CM •) f p iginal Documents Received: Department Name: Transportation Services Contact Person: Latha Kumar/Tiffany Calley Project Manager/Resource: David Bartels Project Coordinator: Thomas G. Martin, P.E., Director of TS Blue Sheet Wording Council or City Manager Approval Date: Project Name: Red Bud Lane Phase 11 (US 79 to CR 123) ContractorNendor: Funding Source: Amount: Account Number: 04/14/06 N/A 4B -RR Transportation Development Corp $12,450.00 authorizing the -Mayer to execute a reimbursement agreement with MCI Communications Services, Inc., for the for the Red Bud Lane Project, Phase III. r". ( t 3 Maht Finance Information Is Funding Required? n Yes No 0 0 0 CI QPurchasing/Service Agreement Initial Construction Contract Construction Contract Amendment # Change Order Change in Quantity Unforeseen Circumstances Initial Professional Services Agreement Supplemental Professional Svcs. A # QPurchase Order Item(s) to be purchased: Finance Approval EJFinance EJFinance JPurchasing Budget Other (Please clearly identify action on lines below) Agreement to Reimburse MCI for fiber optic cable adjustment Date Date Date Date Amount $12,450.00 Required for Submission of ALL City Council and Citv Manager Items Project Mgr. Signature: Dept. Director Signature: City Attorney Signature*: City Manager Signature: Date: 4/7/2006 mas G. Ma in, P.E., Director Leg royal is required for all items. Date: 4/7/2006 Date: cl(qb Date: q -ii -i -oto Updated 2/16/06 Request for City Council/City Manager Action City Council City Manager For Administration Use ONLY Received: Tag # Submit completed form for all City Manager and City Council approvals. Original Documents Received: Department Name: Transportation Services Contact Person: Latha Kumar/Tiffany Calley Project Manager/Resource: David Bartels Project Coordinator: Thomas G. Martin, P.E., Director of TS Assigned Attorney: Council or City Manager Approval Date: Blue Sheet Wording Project Name: Red Bud Lane Phase III (US 79 to CR 123) ContractorNendor: Funding Source: Amount: Account Number: 04/14/06 N/A 4B -RR Transportation Development Corp $12,450.00 Action authorizing the City Manager to execute a reimbursement agreement with MCI Communications Services, Inc., for the for the Red Bud Lane, Phase III project. Finance Information Is Funding Required? o Yes 0 No 0 CI Finance Approval Finance EJFinance EJPurchasing EJBudget Initial Construction Contract Construction Contract Amendment # Change Order # Change in Quantity Unforeseen Circumstances Initial Professional Services Agreement Supplemental Professional Svcs. A # Purchasing/Service Agreement Purchase Order Item(s) to be purchased: Amount Other (Please clearly identify action on lines below) $12,450.00 Agreement to Reimburse MCI for fiber optic cable adjustment L. Olsen N/A E. Wilson N/A CYD Date 4/12/2006 Date 4/11/2006 Date Date 4/11/2006 Required for Submission of ALL City Council and City Manager Items Project Mgr. Signature: David Bartels Date: 4/7/2006 Dept. Director Signature: Thomas G. Martin, P.E., Director Date: 4/7/2006 City Attorney Signature*: Date: City Manager Signature: Date: Legal Approval Is required for all Items. Updated 2/16/06