Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CM-06-06-128
HAXO OGTRUCTORG 24 May 2006 Kimley-Horn and Associates, Inc. 12700 Park Central Drive Dallas, Texas 75251 P.O. Box 1057 Round Rock, Texas 78680 (512) 244-0600 1-800-441-4109 Fax: (512) 244-0489 mail@chasco.com RE: Rock'n River Family Aquatic Center CP 003 (KMA RFP N/A) — Add to Theming Dear Mr. Mark Hatchel: We hereby submit our proposal for your consideration and approval to execute a change to the contract for the above referenced project as requested per the Owner's request. For your review and per your request, we are adding $12,000.00 to the Theming Allowance. Original Theming Allowance was: Value Management reduced Allowance Contract Theming Allowance Owner adds to Theming Allowance Revised Theming Allowance $75,000.00 ($55,000.00) $20,000.00 $12,000.00 $32,000.00 Changes per attached CP No. 003 Pricing Sheet dated 24 May 2006: $12,000.00 If approved, this change will result in a change to the Contract Amount by the sum of $12,000.00. Please indicate if we are to proceed with this work by 31 May 2006, if possifIe. If approved, this CP will be incorporated into the next Owner Change Order. Respectfully,/) APPROVED BY: Jim Freeman Project Manager cc: File: 05235 — 112-003 C _vee-©lP-/2 ' MEMBER �151 ONCM ONTRRA. Architect Date CLC Chasco Contracting Project No: 05235 Est. No: CP -003 Description: Add to Theming Allowance Rock'n River Family Aquatic Center Pricing Sheet Date: 24 May 2006 Prepared by: Jim Freeman tEM tABOR Owner add to Allowance LS 0.00 $0 $0 12000.00 $12,000 $12,000 SUBTOTALS 0.00 $0 $0 $0 $0 $0 $0 $12,000 $12,000 Theming Allowance Summary: Overhead Sales Tax Materials (only) SUBTOTAL Fee SUBTOTAL Insurance P&P Bond GRAND TOTAL 10.00% 0.00% 5.00% $0 $0 $12,000 $0 $12,000 1.25% $0 1.10% $0 $12,000 ' Jim Freeman From: Larry Madsen [larrym@round-rock.tx.us] Sent: Monday, May 01, 2006 7:56 AM To: Jim Freeman Cc: Mark.Hatchel@kimley-horn.com; James Hemenes Subject: Rock n River Aquatic Jim, Would you prepare a change order adding $12,000 to the theming allowance in your contract? Please note in the change order that $55,000 had been originally value engineered out of the original proposal. Due to cost savings and additional money that has been funded for this project $12,000. can be added to the allowance to complete plans for theming on the project. This should allow enough money to have the rock built on the project from our allowance budget. If this could be faxed or emailed to Mark Hatchel for his approval and then returned to me I will get it processed as soon as possible. Thanks, Larry Larry Madsen Construction Manager Building Construction & Facility Maintenance City of Round Rock Ofc. (512) 218-5552 Fax (512) 218-5563 5/10/2006 DATE: May 30, 2006 SUBJECT: City Manager Approval - June 2, 2006 ITEM: Action authorizing the City manager to execute Change Order No. 3 with Chasco Contracting for theming allowance for the Rock'n River Family Aquatic Center. Department: Engineering and Development Services Staff person: Tom Word, Chief of P.W. Operations Larry Madsen, Construction Manager Justification: The original theming allowance for the Rock'n River project was lowered from $75,000 to $20,000 during value engineering negotiations at the start of the project. Due to cost savings within the project as well as additional money sources the allowance can be increased by $12,000. This will provide enough money to provide adequate signage and theming for the project. Funding: Cost: $12,000 Source of funds: 2002 G.O. Bonds Outside Resources: N/A Background Information: N/A Public Comment: N/A