Loading...
CM-06-06-131Change Order No. 3 Project Name: East Water Transmission Line, Phase 3A-2 HDR Project No.: 07225-16810 Project Owner: City of Round Rock 212 Commerce Cove, Round Rock, TX 78664 Date of Issuance: May 30, 2006 Project Contractor: FT Woods Construction Services 1966 S. Austin Ave., Georgetown, TX 78626 Date of Contract: June 06, 2005 Date of Notice to Proceed: August 22, 2005 Original Completion Date: March 20, 2006 Contract Period: 210 Calendar Days It is agreed to modify the Contract referred to above as follows: CPR # ITEM AND DESCRIPTION OF CHANGES CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME 4 Install 12" Gate Valve & Box to replace existing City isolation valve $ 7,036.50 2 Difference Net $ 7,036.50 2 Summary: It is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order Contract Time prior to this Change Order $ 781,053.41 Net Increase (decrease) of this Change Order $ 7,036.50 222 days - March 30, 2006 Net Increase (decrease) of this Change Order 2 Revised Contract Price with all approved Change Orders Revised Contract Time with all approved Change Orders $ 788,089.91 224 days — April 3, 2006 The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions of the original Contract as though included therein. Accepted for ontr for by. Recommended for Appro - •y (HDR En ineering, Inc.): Ap roved for Owner Ap C.1-ry m, 46E,2 d: (Other - when required) Date: 5/3//“, Date: 573//0 Attest: Date: eivug.pt Distribution: ❑ Owner ❑ Contractor ❑ Office Ci -01P-(%' 431 9- o� Date: ❑ Field ❑ Other Change Proposal Request No. 004 (Not a Change Order) Project Name: EAST WATER TRANSMISSION LINE — PHASE 3A-2 Owner's Project No. (if applicable): Project Owner: C.O.R.R. — Public Works Department Regulatory Agency Project No. (if applicable): HDR Project No. 07225-16809 Initiated by: ►5 Engineer IN Contractor Contractor: FTWOODS Construction Date: 5/30/06 Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change. • A breakdown of cost shall be provided upon request by the Owner or Engineer. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: 12" Gate Valve & Box $ 2,248.60 12" Long Sleeve & DI Pipe $ 1,887.90 Cut & Remove Ex. 12" G.V $1,050.00 Site Restoration $ 1,850.00 Total Cost $ 7,036.50 By MIKE CHANEY All work shall be in accordance with the terms, stipulations, and conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: ® Increased El Decreased ❑ Unchanged by 2 calendar days. This change will: ® Add ❑ Deduct ❑ No Change $ 7,036.50 HDR ecommendation: °(Recommend Acceptance 0 Do Not Recommend Acceptance FTWOODS Construction General Contractor Date 5/30/06 (Jun 1990; Revised Oct 2001) Copyright 1991 HDR Engineering, Inc. B HDR Engineering Date Owner's Action: ❑ Accepted 0 Not Accepted Form 6010-02 DATE: June 5, 2006 SUBJECT: City Manager Approval - June 9, 2006 ITEM: Action authorizing the City Manager to execute Change Order Number Three to the Contract with F.T. Woods Construction Services, Inc. for the construction of the East Water Transmission Line, Phase 3A-2 Project. Department: Water and Wastewater Utilities Staff Person: Tom Clark, Director of Utilities Justification: This Change Order is to provide a 12" Gate Valve at the intersection of Highway 79 and Redbud Lane. This valve is necessary because the existing valve when closed is leaking by about 600 gpm. The shut down of this valve is required in order to allow the newly installed PRV to regulate the system properly. Funding: Cost: $7,036.50 Source of funds: Utility Self -Financed Construction - Water Outside Resources: F.T. Woods Construction Services, Inc. Background Information: Change Order Number Three is for the additional cost associated with installing a 12" Gate Valve replacing an existing leaking 12" Gate Valve. This project will be closed out once this work under Change Order Number Three is completed. Public Comment: N/A