CM-06-07-153AMENDMENT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES WHEREAS: HDR ENGINEERING, INC. ("HDR") entered into a Contract for Engineering Services on December 1, 2005 to perform engineering services for "Preliminary Engineering Report for the Cedar Park / Round Rock / LCRA Regional Water System Improvements"; The CITY OF ROUND ROCK, the CITY OF CEDAR PARK, and the LOWER COLORADO RIVER AUTHORITY desire to amend this Contract in order for HDR to perform services beyond those previously contemplated; HDR is willing to amend the agreement and perform the additional engineering services. NOW, THEREFORE, HDR and the CITY OF ROUND ROCK, the CITY OF CEDAR PARK, and the LOWER COLORADO RIVER AUTHORITY do hereby agree: The Agreement and the terms and conditions therein shall remain unchanged other than those sections and exhibits listed below; Article 4 shall be changed to add the fee of $19,800 for Amendment No. 1 so that the total amount payable under this Contract shall be $152,300. Article 4 shall be changed as shown below to modify the percentage of the Engineer's compensation to be paid by each Owner: Round Rock 38.56% LCRA 47.26% Cedar Park 14.18% Exhibit B shall be supplemented by adding the attached Exhibit B-1 Supplement - Additional Engineering Services for Preliminary Engineering Report Revisions. Exhibit C shall be supplemented with the following: Revised Final Preliminary Engineering Report as specified in Amendment No. 1 to the Contract will be delivered within 45 days from execution of this amendment. Exhibit D shall be supplemented by adding the following: Preliminary Report Revisions as specified in Amendment No. 1 to the Contract, Lump Sum Fee of $19,800.00. IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year written below: Amendment No. 1 to Contract for Engineering Services Preliminary Engineering for the Cedar Park / Round Rock / LCRA Regional Water System Improvements Page 1 C,Ms3 HDR ENGINEERING, INC. ("HDR") By: Printed Name: Neil A. Graff, PE Title: Senior Vice President Date Signed: 7- 7 o!P CITY OF ROUND ROCK, TEXAS By: Printed Name: (- f 3 EAkre y PE . Title: Date Signed: 7/4-4C6' CITY OF CEDAR PARK, TEXAS By: 1)'��u'v1,(�) ti Printed Name:' (wo,. Y v�) Title: i'i (t--, Date Signed: I 11--2' LOWER COLORADO RIVER AUTHORITY } By Printed Name: c ) t V\ 0,- Title: Mk,, Date Signed: Z l 1 i 1 C Amendment No. 1 to Contract for Engineering Services Preliminary Engineering for the Cedar Park / Round Rock / LCRA Regional Water System Improvements Page 2 Exhibit B-1 Supplement - Additional Engineering Services Preliminary Engineering Report Revisions Scope of Work Task 1 — Revise Capacity Determination • Revise ultimate system capacity to include Leander/LCRA at 50 mgd capacity. • Update growth projection curve based on revised water demand projections to be furnished by Cedar Park (for Cedar Park) and by LCRA (for Leander). • Update capacity phasing/schedule of projects to meet participant projected needs. Task 2 —Revise Cost Evaluations • Update pipeline unit costs based on current market bid and increased depth of cover. • Revise segmentation of treated water pipeline based on New Hope Road construction. • Revise phasing cost estimates based on increased Leander capacity and changed projections for Cedar Park. • Update cost allocations to participants. Task 3 — Report Revisions • Add surge analysis technical memo to appendix. • Update the report's text and figures to reflect the revisions described above. Task 4- Project Management and Administration • Project management and administration. Reimbursable Expenses • General project expenses. • Twenty (20) report copies. Exclusions: • No meetings anticipated or included. • Based on hydraulic analyses (surge and static) already completed for 50 MGD delivery to LCRA/Leander. No new analysis proposed. Amendment No. 1 to Contract for Engineering Services Preliminary Engineering for the Cedar Park / Round Rock / LCRA Regional Water System Improvements Page 3 CITY MANAGER BLUE SHEET DATE: July 13, 2006 SUBJECT: City Manager Approval ITEM: Authorize City Manager to execute Amendment No. 1 to Contract for Engineering Services with HDR Engineering, Inc. for the Regional Water System. Department: Utilities Staff Person: Tom Clark/Steve Sheets Justification: Round Rock, Cedar Park, and LCRA entered into a Contract for Engineering Services on Dec. 1, 2005 to perform engineering services for the Preliminary Engineering Report for the proposed Regional Water System. Round Rock, Cedar Park, and LCRA wish to amend the Contract to add engineering services not covered in the original Contract. The total cost of these additional services is $19,800.00 and Round Rock's share (38.56%) is $7,634.88. Funding: Cost: $7,634.88 Source of funds: Background Information: Updated 3-10-05