CM-06-08-166Project:
(Name, Address)
To:
(Contractor)
Round Rock Fire Station #2
200 West Bagdad Avenue
Round Rock, Texas 78664
Royce Tschatchula
1801 Whip 0 Will
Round Rock, Texas 78681
The Contract is changed as follows:
1. Increase fire main connection from 4" to 6" diameter line.
Change Order No.: 2
Initiation Date: August 3, 2006
Architect's Project No.: A72011.02
Contract For: General Construction
Contract Date: March 23, 2006
This Change Order is not in effect and will not be included in the Contract Documents until signed by the Owner, Architect and
Contractor. Changes included herein are subject to all conditions affecting them under the substitution specification section.
SUMMARY
The original (Contract Sum) was $ 1,155,949.00
Net change by previously authorized Change Orders $ 18,545.84
The (Contract Sum) prior to this Change Order was $ 1,174,494.84
The (Contract Sum) will be (increased) by this Change Order $ 4,900.65
The new (Contract Sum) including the Change Order will be e,$ 1,179,395.49
The Contract Time will be (unchanged) by ( 0 ) Days o$ 1,179,395.49
The Date of Substantial Completion as of the date of this Change Order therefore is 330
Changes included in the summary above (do)(do not) include modifications which have been authorized by Construction
Change Directive(s).
PBS&J
mrteci
1120 Capital of Texas Hwy. S.
Bldg. 3, Suite 100 Austin Texas
by
Royce Construction Co. Inc.
Cectracwr
1801 Whip 0 Will
Authorized:
The City of Round Rock, Texas
Owner
221 East Main Street
RRod Rock, Teps 7:681 Round Rock, Texas 78664
IYY
bate
fr/v/at
86/22/2006 10:50 5129907855
Poat4P Fax Note 7671 On W% Z'. !Rise 1
n Sant J4QY bin.
cow °°�'rtiutdF�,
Fnm•. •
Fx• �agG-1 % Furl
DESCRIPTION:
LABOR;
MATERIAL:
EAUIPM
SMITH CONTRACTING CO PAGE 01
Smith Contracting Co., Inc.
Round Rock Fire Station
8/2212006
linitis
Total
ForemanA,avouttoerypnator
1
14
$30.00
1420.00
°parser
1
14
510.00
$2$2.00
Laborer
1
48
112.00
5576.00
TOTAI
Yalta/
1,248.00
Pipe and Mande
1
I-5
I -. ,w
11,663.00
$1,863.00
4' tapping sleeve
1
LS
5460.00
$450-00
TOTAI
TOTAL
2,313.
•
Backhoe
y
1
went
HRS
mous
$76.00
675.00
TOTAI
GC COST
TABOR BURDEN (Labor only)
SUBTOTAL
GC ON 8. PROFIT Malarial)
TOTAL
65%
25%
175.00
63.636.00
$686.40
64.322.40
6578.25
au;900.65
DATE:
SUBJECT:
ITEM:
August 7, 2006
City Manager Approval August 11, 2006
Action authorizing the City Manager to execute change
order No. 1 with Royce Construction to increase fire main
connection for Fire Station No. 2.
Department: Engineering & Development Services
Staff Person:
Justification:
Tom Word, Chief of P.W. Operations
Larry Madsen, Liaison Construction Manager
Increase building fire sprinkler line from a four -inch to a six-inch line from
the water main to the building. This is required due to water pressure that
is available on the water main along Blair Street at Bagdad. There is not a
contractor mark-up, this is an actual price from sub -contractor.
Funding:
Cost: $4,900.65
Source of funds: 2002 GO Bonds
Outside Resources: N/A
Background Information: N/A
Public Comment: N/A