Loading...
CM-06-09-179Project: (Name. Address) To: (contractor) Rock 'N River Aquatic Center 3300 Palm Valley Blvd Round Rock, Texas Chasco Constructors P.O. Box 1057 Round Rock, Texas 78680 The Contract is changed as follows: Credit for balance hardware allowance addition Addition for tree bubbler irrigation Change Order No.: 6 Initiation Date: 8/29/2006 Architect's Project No.: Contract For. Rock N' River Contract Date: 10/25/2005 ($2,970.00) $5,444.00 TOTAL: $2,474.00 This Change Order is not in effect and will not be Included in the Contract Documents until signed by the Owner, Architect and Contractor. Changes included herein are subject to all conditions affecting them under the substitution specification section. SUMMARY The original (Contract Sum) was $ 2,720,152.00 Net change by previously authorized Change Orders $ 28,704.00 The (Contract Sum) prior to this Change Order was $ 2,748,856.00 The (Contract Sum) will be increased by this Change Order $ 2,474.00 The new (Contract Sum) including the Change Order will be n$ 2,751,330.00 The Contract Time will be (unchanged) by ( ) Days $ (unchanged) by ( ) Days The Date of Substantial Completion as of the date of this Change Order therefore is Changes Included in the summary above (do)(do not) include modifications which have been authorized by Construction Change Directive(s). Arctwted Address Chasco Constructors contractor P.O. Box 1057 Rs and Rock, T: as 78680 Authorized: City of Round Rock Owner 221 E. Main Street Address Round Rock, Texas 78664 BY Date (m -Gu- - (71 4"..)(. 220(o Dae Date HASCO ONCTRUCTORS 27 June 2006 Kimley-Hom and Associates, Inc. 12700 Park Central Drive Dallas, Texas 75251 P.O. Box 1057 Round Rock, Texas 78680 (512) 244-0600 1-800-441-4109 Fax: (512) 244-0489 mail@chasco.com RE: Rock'n River Family Aquatic Center CP 009 (KMA RFP N/A) — Add Tree Bubblers Dear Mr. Mark Hatchel: We hereby submit our proposal for your consideration and approval to execute a change to the contract for the above referenced project. For your review, we have provided pricing for labor, equipment and material to add tree bubblers per the request of the City of Round Rock. Changes per attached CP No. 009 Pricing Sheet dated 27 June 2006: $5,444.00 If approved, this change will result in a change to the Contract Amount by the sum of $5,444.00. This work is complete at this time. If approved, this CP will act as an Owner Change Order. Re pectfully,-f APPROVED BY: Owner Date JJm Free an Project Manager cc: File: 05235 — 112-009 Architect Date ac ) Chasco Contracting Rock'n River Family Aquatic Center Project No: 05235 Est. No: CP -009 Description: Add tree bubblers per CoRR requirements and direction. Date: 27 June 2006 Prepared by: Jim Freeman Pricing Sheet 1 Add tree bubblers 1 LS 0.00 $0 4605.00 $4,605 $4,605 SSee Attached Sub Proposal) 0.00 $0 $0 $0 $0 SUBTOTALS $0 $0 $4,605 $4,605 Theming Allowance Summary: Overhead Sales Tax Materials (only) SUBTOTAL Fee SUBTOTAL Insurance PSP Bond GRAND TOTAL 10.00% 0.00% 5.00% $461 $0 $5,066 $253 $5,319 1.25% $66 1.10% $59 $5,444 JUN -26-2006 MON 10:47 AM UTZ ENVIRONMWNTAL SVCS FAX No. 5125289698 P. 001 LANDSCAPB • IRRIGATION • HYDROMULCH 'TO: Jim Freeman 'Cuzco Constructors . FROMI • Chris Uta • • Utz Enviromnentaf Services PATE:, lune 26, 2006 .. . : REQ • • Rodc'n River Family Aquatic Center. Provide all maierial, labor and equipment for the folbwk:ge 1. Instoll irrigation bubblers on oil trees • • Note: Price -valid for'thirty Boys from date of proposal. • • Eicdusioriss . 1. No Bond; if necessary Add .3% 2. Sales Tax • 3. Writer Meter •• • • . • 4. 110V Power to Controller Agreed, 4/4/.' ChrisK. Utz . • • • • • Licensed 'Irrigator, #5625 $1,605.00 The Tgxos Conmmission or) Eamronmental Ouolity.regulates irrigation in Tesxos ' • P.O. Box 13087, Austin, TX 78711-3087 ..• . DALLAS: 2355 N.:HIGHWAY 3b0 #514 • GkAND PRAIRIE, TEXAS 75050 ! EAX •(817) 627-2888 AUSTIN: 36M. COUNTY ROAD 272: • LEANDER, TEXAS, 78641 'BPS: (51.2) 528:-9696 • • .• .:www. utxelivilronrnentals'ervices:.com AUG' 16-2006 WED 06 23 PM UTZ ENVIRONNWNTAL SVCS FAX No. 5125289698 P. 001 TO: LANDSCAPE • IRRIGATION • I-IYDROMULCH Jim Freeman Chas<o Constructors FROM: Chris Utz Utz Environmenta[ Services DATE: August 16, 2006 Rock'h River Family Aquatic .Center Tree Bubbler Addition: REI Scbae: Quantity Description Unit 1,200 'h tn. PVC Pipe LF 400 3/4 in. PVC Pipe LF 400 1 In. PVC Pipe LF 23 Rain Bird 1300 Bubblers Ea. 1 Rain Bird 2 In. PEB Valve Ea. 1 Concrete Valve Box Ea. 330 14 Gauge Wire LF .Note; The installation required the removal and replacement of all plant material and mulch In the Islands In order to access the sleeves. Agreed, ChrR! L. Utz Licensed Irrigator, #5625 The Texas Commission an Environmental Quality regulates irrigation in Texas P.O. Box 130E17, Austin, TX 76711-3067 1094$ E. CRYSTAL FALLS PARKWAY • LEANDER, TEXAS 78641 • BUS: (512) 52$_9696 • FAX: (512) 528-9698 www.utzenvironmentahervices.com DATE: SUBJECT: ITEM: August 30, 2006 City Manager Approval - September 8,2006 Action authorizing the City Manager to execute Change Order No. 6 with Chasco Contracting for Rock'n River Family Aquatic Center.. Department: Engineering and Development Services Staff person: Tom Word, Chief of P.W. Operations Larry Madsen, Construction Manager Justification: Upon completion of Aquatic Center a balance of $2,970.00 was left in the allowance budget for hardware. This is returned as a credit. Tree bubblers were left out of original landscape plans and were added at a cost of $5,444.00. The total for this change order is an addition to the contract in the amount of $2,474.00. Funding: Cost: $2,474.00 Source of funds: 2002 G.O Bonds Outside Resources: N/A Background Information: N/A Public Comment: N/A