Loading...
CM-06-09-185Notice of Intent (NOI) for Storm Water Construction General Permit TCEQ Office Use Only TPDES Permit Number: TXR15I—I—I—I—I GIN Number: I 1 1 1 1 1 1 1 Fee Receipt No. Discharges Associated with Activity under the TPDES la IMPORTANT: •Use the attached INSTRUCTIONS when completing this form. •After completing this form, use the attached CUSTOMER CHECKLIST to make certain all items are complete and accurate. •Missing, illegible, or inaccurate items may delay final acknowledgment or coverage under the general permit. Application Fee: You must submit the $100 NOI Application Fee to TCEQ under separate cover (see instructions) using the attached Application Fee submittal form. (DO NOT SEND A COPY OF THE NOI WITH THE APPLICATION FEE SUBMITTAL FORM) Tell us how you paid for this fee: Check/Money Order No.: Name Printed on Check: A. OPERATOR 1. TCEQ Issued Customer Number (CN) (if available): CN600413181 2. Legal Name (spelled exactly as filed with the Texas Secretary of State, County, or legal document that was used in forming the entity): CITY OF ROUND ROCK 3. Mailing Address: 2008 ENTERPRISE DRIVE Suite No.B1dg.No.: City: ROUND ROCK State: TX ZIP Code: 78664 4. Phone No.: ( 512 ) 218-6605 Extension: 5. FAX No. (512) 218-5563 E-mail Address: rhaberman@round-rock.tx.us Partnership State Government Other: 6. Type of Operator: • Individual ■ Sole Proprietorship-D.B.A. • • Corporation • Federal Government • • County Government 0 City Government ■ (If govenunental entity or a subsidiary or part of a larger corporation, check "NO") 7. Independent Operator: • Yes 0 No higher 8. Number of Employees: • 0-20; ■ 21-100; ■ 101-250; ■ 251-500; or U 501 or 9. Business Tax and Filing Numbers (not applicable to Individuals, Government, General Partnerships, and Sole Proprietorship-D.B.A): State Franchise Tax ID Number: Federal Tax ID: TX SOS Charter (filing) Number: DUNS Number: (If known) B. BILLING ADDRESS (The Operator is responsible for paying the annual fee.) with Section C.) IS Same As Operator (check if address is the same, then proceed 1. Billing Mailing Address: Suite No.B1dg.No.: City: State: ZIP Code: 2. Billing Contact (Attn or C/O): 3. Country Mailing Information (if outside USA) Territory: Country Code: Postal Code: 4. Phone No.: ( ) - Extension: 5. FAX No. E-mail Address: TCEQ-20022 (07/12/2004) e -occ cif. Page 1 of 3 C. APPLICATION CONTACT (If TCEQ needs additional information regarding this application, who should be contacted? 1. Name: RUTH HABERMAN, P.E. Title: ENGINEER Company: CITY OF ROUND ROCK 2. Phone No.: ( 512 ) 218-6605 Extension: 3. FAX No. (512) 218-5563 E-mail Address: rhaberman@round-rock.tx.us D. REGULATED ENTITY (RE) INFORMATION ON PROJECT OR SITE 1. TCEQ Issued RE Reference Number (RN) (if available): 2. Name of Project or Site: SOUTHWEST DOWNTOWN DISTRICT INFRASTRUCTURE IMPROVEMENTS — /-y43e- /,4 3. Physical Address of Project or Site: (enter in spaces below) Street Number: Street Name: City (nearest to the site): ROUND ROCK ZIP Code (nearest to the site): 78664 County (Counties if >1): WILLIAMSON 4. If no physical address (Street Number & Street Name), provide a written location access description that can be used for locating the site: (Ex.: 2 miles west from intersection of Hwy 290 & IH35 on Hwy 290 South) 5. Latitude: 30.5078 N Longitude: -97.6796 W 6. Standard Industrial Classification (SIC) code: 1629 7. Describe the activity related to the need for this authorization at this site (do not repeat the SIC and NAICS code): DRAINAGE PROJECT CONSTRUCTION - GENERAL CONTRACTORS 8. Is the project/site located on Indian Country Lands? ■ Yes 0 No If Yes, you must obtain authorization through EPA, Region VI. E. SITE MAILING ADDRESS (address for receiving mail at the site) proceed with Section F.) Fi Same As Operator (check if address is the same, then Mailing Address: Suite No.B1dg.No.: City: State: ZIP Code: F. GENERAL CHARACTERISTICS 1. Has a Pollution Prevention Plan been prepared as required If No, coverage may be denied as the PPP is required at in the general permit? 0 Yes • No the time the NOI is submitted to TCEQ. 2. Provide the estimated area of land disturbed (to the nearest acre): 4.6 Acres 3. Provide the name of the receiving water body (local stream, lake, drainage ditch), MS4 Operator (if applicable) and the segment number where storm water runoff will flow from the construction site. MS4 Operator: City of Round Rock Receiving Water Body: Lake Creek Segment: 1244 TCEQ-20022 (07/12/2004) Page 2 of 3 CERTIFICATION 1, (Ames I€. NUSE, Pe. C'or'y mRaiPa-62 Typed or printed name Title (Required) certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. I further certify that I am authorized under 30 Texas Administrative Code §305.44 to sign and submit this document, and can provide documentation in proof • f such authorization upon request. Signature.•' (Use Blue Ink) Date: 9-a-oe.0 TCEQ-20022 (07/12/2004) Page 3 of 3 DATE: September 15, 2006 SUBJECT: City Manager Approval - September 22, 2006 ITEM: Consider an action by the City Manager to sign a Notice of Intent (NOI) for Storm Water Discharges Associated with construction activity under the TPDES General Permit for the Southwest Downtown District Infrastructure Improvements Project - Phase 1A. Department: Engineering & Development Services Staff Person: Ruth Haberman, P.E. Justification: Page Southerland Page, LP has prepared a Stormwater Pollution Prevention Plan (SWPPP) for the Southwest Downtown District Infrastructure Improvements Project - Phase 1A. A Notice of Intent, signed by the City Manager, and the SWPPP for the project must be submitted to the Texas Commission on Environmental Quality (TCEQ) prior to any activity beginning on the project. The NOI is required because although the City will be disturbing less than five acres during the construction of this project, the project is a part of a greater plan of development. Funding: Cost: -0- Source of funds: N/A Outside Resources: Page Southerland Page, LP Chasco Contracting Background Information: The Southwest Downtown District project will provide critical infrastructure improvements to the streets bound by Lake Creek, Round Rock Avenue, North Mays Street, McNeil Road and IH -35 on the west side. Improvements include the construction of streets, sidewalks, a regional water quality pond, water and wastewater utilities, underground dry utilities, and storm drainage improvements for the area. Public Comment: N/A