CM-06-09-195Daze of Request Change Order Request Form Red Bud Lane Sidewalk Improvements 2002 Bond Funded CIP SD72REDB September 15, 2006 Order Number 1 NOTICE t0 tile CONTRACTOR: This document is notice to proceed with work at the rates herein on executed date of last approval signature. Approval of the following change in the Plans and ( or Specifications is requested: Description: Implementation of agreed to changes in the proposed quantities, and scope of services. Justification: To accurately track field modifications to match the constructed project. These changes include task changes such as deleting sections of segmented block wall, changing drainage configuration, and adding minor items. Also, there is an allotting for delay caused by right of way acquisition contracts. 683,399.80 Department: EDSD Contract Amount Onginal: $ Original Contract Days (Calendar) : 80 Current: $ 683,399.80 Start Date: June 27, 2006 With this Change Order $ 58 ,187.17 Completion Date Original: September 15, 2006 Current September 15, 2006 With this Change Order: October 1, 2006 Contractor: H. Deck Construction Company Danny Thompson,. Project Manager 1601 Oxford Boulevard Round Rock, Texas 78664 T: (512) 255-8400 F: (512) 255-4520 CORR PM: Inspector. Engineer: William J. Dobrowolski ill, PE Eddie D. Imken Baker-Aicklen & Associates Antonio A. Prete, PE, Project Manager 507 West Liberty Avenue Round Rock, Texas 78664 Office # (512) 244-9650 FAX # (512) 244-9623 ITEM # UNIT DELTA QUANTITY BEFORE QUANTITY POSTDELTA QUANTITY DESCRIPTION UNIT PRICE' ITEM COST BEFORE ITEM COST POST ITEM COST DELTA DAYS 1007900 667700 CB Retaining Wall $ 25.00 $ (85,050.00) $ 251,975.00 $ 166,925.00 (5) 10 SF (3402.00) 1838.0 1051.0 Handrail $ 44.00 $ (34,628.00) $ 80,87200 $ 46,244.00 (2) 11 LF (78700) 26000 328.00 12 27 2 12 14 LF EA ((2 0) 2. 8.00 6 2 x 2' A ea Inlet $ 1,3 0.00 $ (2 600.0) $ 10,40 .00 ,800.0 $ NEW TASK ITEMS EA 1 00 1,00 Stormsewer Tie to existing Box $ 400.00 $ 400.00 $ 400.00 1A-1 SF 1090.00 1090.00 5" Concrete Valley Gutter/Driveway $ 5.85 $ 6,376.50 $ 6,376.50 3 1A-2 SF 95.00 5" Concrete Rip -Rap $ 5.85 $ 555.75 $ 555.75 1 1A-3 EA 95.00 6.00 Weep -hole Block-outs $ 200.00 $ 1,200.00 $ 1,200.00 1 IA -4 1A-5 SY 6.00 4000.00 4000.00 Errosion Matting $ 1.85 $ 7,400.0 $ 7,400.00 4 SY 30.00 30.00 Asphalt Pavement Repair $ 28.00 $ 840.00 $ 840.00 1 1A-6 LS 1.00 1.00 Irrigation Electrical Repair $ 487.12 $ 487.12 $ 487.12 1A-7 LF 120.00 120.00 Chain Link Fence $ 23.60 $ 2,832.00 $ 2,832.00 22 1A-8 1A-9. DAY Delay Alottment of ROW 10-10 EA 3.00 ation Tree $ 450.00 $ (,212.00 $ rr er M0 OT WFRRUN'UNDER RUNT - 2.63) $ 360,927.00 $ 260,532.377 16 Materials($) (Non -taxed) Services($) (Taxed) TOTAL ($38,485.05) ($57,727.58) ($96,212.63) Calendar Time Extension (Deletion): Completion Date with Delta Time: Current Contract 'UNIT PRICE', unless the item not in original bid or warrants new pace per contract documentation. Recommended for approv ,by: William J. Dobrowors PE CORR Project M : nager Recommended for approval by: If 1i r Antonio A. late, PE (' Baker-Aic len & Associates. Proiect Manaaer Date UNIT PRICES SUBMITTED BY: Danny%(�?2y2���_Z! ompson H. Deck Construction Comoanv. Proiect Manaoer CCEPTED: J mes ' . Nuse, PE ty : nager 16 Days October 1, 2006 DATE: September 20, 2006 SUBJECT: City Manager Approval - September 29, 2006 ITEM: Consider City Manager approval of Change Order # 1 with H. Deck Construction for the Red Bud Lane Sidewalk Improvements Project. Department: Engineering and Development Services Staff Person: Daniel L. Ha!den, P.E., City Engineer William Dobrowolski, Senior Engineer Justification: This Change Order is for field modifications required on this construction project. Proposed changes net a saving of $96,212.63, with an increase in construction term of 16 calendar days. Funding: Cost: ($96,212.63) Source of funds: 2002 GO Bonds (Second Issuance) Outside Resources: Baker Aicklen and Associates, Inc. Background Information: Project was designed before the completion of the construction on the CR 122 improvements project. With the lay -out staking for the sidewalk improvements project construction, it was clear that field changes in the CR 122 improvements project and the narrow strip of survey information used in the design would warrant field changes. Two sections of walls did not match up with the new existing conditions, such as blocking acquisition contracted access from Red Bud Lane to an adjoining property, and not utilizing a wider area available for grade out. In addition, drainage modifications were required to match field changes made in the CR 122 improvements project as mitigation of utility conflicts. Thus, Change Order # 1 includes items relating to changes in tasks such as deletion of sections of the segmented block wall, reconfiguration of drainage, mitigation of erosion issues related to the sidewalk and road improvements, delay and accessibility issues caused by right-of-way acquisition contract agreements, and other minor adjustments. Public Comment: NA