CM-06-09-189FIRST AMENDMENT TO
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) -
COMMUNITY HOUSING REPAIR PROGRAM CONTRACTOR AGREEMENT
This First Amendment to the Community Development Block Grant (CDBG) —
Community Housing Repair Program Contractor Agreement, hereinafter called the "First
Amendment" is made by and between the City of Round Rock, a Texas home -rule municipal
corporation, hereinafter called the "City" and ALL TEX BUILDING & RESTORATION, INC.,
hereinafter called the "Contractor".
WHEREAS, the City and Contractor executed that Community Development Block
Grant (CDBG) — Community Housing Repair Program Contractor Agreement, hereinafter called
the "Agreement", on the 13`h day of April, 2006; and
WHEREAS, the Agreement was entered into between the City and the Contractor for the
rehabilitation of Lot 3, Block "J", Mesa Park Section Two, a subdivision in Williamson County,
Texas, according to the map or plat thereof recorded in Cabinet C, Slide 50, Plat Records of
Williamson County, Texas, also known as 1709 W. Mesa Park Drive, Round Rock, Texas,
hereinafter called the "Property", in accordance with the Statement of Work, as defined and
provided for in the Agreement; and
WHEREAS, the Contractor may deviate from the work described in the Statement of
Work through a change order approved by the owner of the Property and authorized by the City,
as an amendment to the Agreement;
WHEREAS, it has become necessary to amend the Agreement to provide for a change
order to the Statement of Work;
NOW THEREFORE, that for and in consideration of the mutual promises contained
herein and other good and valuable consideration, the sufficiency and receipt of which are
hereby acknowledged, the City and the Contractor agree that said Agreement is amended as
follows:
Agreement:
1. In accordance with Section 3.12 of the Agreement, the owner of the Property, Contractor
and City mutually agree to the alteration of the Statement of Work in accordance with the work
described in the change order attached hereto and incorporated herein as Exhibit "A".
2. In accordance with Section 1.3 of the Agreement, the Contract Amount, as the term is
described in the Agreement and the change order, in the amount of $769.00, do not exceed a total
of $15,000.00.
3. The Contractor is authorized to deviate from the Statement of Work in accordance with
the work described in the change order provided in Exhibit "A".
00104436/sm/mp
Page 1 of 2
4. Capitalized terms not otherwise defined in this First Amendment shall have the meanings
ascribed to them in the Agreement.
5. Except as amended hereby, the Agreement as originally written remains in full force and
effect.
6. This First Amendment may be executed in multiple counterparts, which, when combined
together, shall constitute an original of this First Amendment. In addition, facsimile signatures
of the parties shall be effective on all counterparts of this First Amendment.
7. This, First Amendment together with the Agreement, embodies the entire agreement of
the parties hereto, and is binding upon and inures to the benefit of the parties to this First
Amendment and their respective heirs, executors, administrators, personal representatives, legal
representatives, successors and assigns and incorporates all previous correspondence or
communication, whether written or oral. The Agreement, as amended hereby, can only be
further modified or varied by written instrument subscribed to by the parties hereto.
IN WITNESS WHEREOF, the City and the Contractor have executed this First Amendment on
the dates indicated.
Approved as to form:
Steph n L. Sheets, City Attorney
ALL TEX BUILDING & RESTORATION, INC.
By: ��,tk,"�i--e
Print Name: v V
9
Date
CITY OF ROUND ROCK
By:
es R. Nuse, P.E., City Manager
fa9(aoop
Date
Page 2 of 2
All Tex Building & restoration Inc.
(936) 760-6560
Fax (936) 856-1937
TO: City Of Round Rock
ADDR:
JOB: 1709 W Mesa Park
Round Rock, TX 78664
Orginal contract cost:
Change order cost:
1st draw amount:
2nd draw amount:
Total due:
$7,764.00
$769.00
$0.00
$0.00
$8,533.00
TO: City Of Round Rock
ADDR:
JOB: 1709 W Mesa Park
Round Rock, TX 78664
All -Tex Building & Restoration Inc.
(936) 760-6560
Fax (936) 856-1937
1
1
1 Upgrage HVAC unit to 13 SEER
600
1
1
2
Repair existing faucet
-51
1
1
3
Replace roof turbines
175
1
1
4
Replace pipe flashings
150
1
1
5
Install conduit on exposed wire in HVAC closet
65
CHANGE ORDER # 1 TOTAL
939
2
1
1
Delete GFCI at front entry
CHANGE ORDER # 2 TOTAL
-170
Change Order Total
Contact Total
Total Due
EXHIBIT
b
a
.0
a "An
769
7764
8533
City of Round Rock
CDBG Construction Change Order
Department: Community Development Page 1 of 1
Program: Home Repair Program Date: 08/03/06
Change Order No. 2
Location: 1709 W Mesa Park Drive Contract: R -06-04-13-10E4
Round Rock TX 78664
Homeowner: Barrisi, Joseph and Marian
Original Contract Price:
Previous Change Orders:
This Change Order
Change Orders to Date:
25% Change Order Max
Balance available
$7,764.00
$939.00
-$170.00
1
$1,941.00
$1,172.00
Change Data
Justification:
Line item 8: Outlet at front entry not
required any longer.
Work
Write Up
Line #
( - )
or
(+)
Description of Changes
Unit
Approx
Quantity
Unit Price
Amount
Added Days
Calendar /
Working
8
(-)
Outlet/Exterior/110 GFCI front entry
ea
1
$170.00
-$170.00
0
Total
-$170.00
0
Contract: $7,764.00
C/O #1 $939.00
C/O #2 -$170.00
$8,533.00
Prepared by:
Project Manager
By:
Title
Mona Ryan
ALL TEX BUILDING & RESTORATION, INC.
Contractor
Homeowner
I ..
arr)
Change Order Summary:
C/O #1 $939.00
C/O #2 -$170.00
$769.00
-el' --a 6
Date
Percent of Original Contract Price
Maximum % allowed 25%
This Change Order
Previous Change Order
Total % Change
Contract + Change Orders:
Approved:
ate Title
Date
Da
-2%
12%
10%
$8,533.00
James R lJnux.6
ity Maaanageriarn� L1 E.
al
CDBG Form 5/2006
Department:
Program:
Location:
Homeowner:
City of Round Rock
CDBG Construction Change Order
Community Development
Home Repair Program
1709 W Mesa Park Drive
Round Rock TX 78664
Barrisi, Joseph and Marian
Original Contract Price:
Previous Change Orders:
This Change Order
Change Orders to Date:
25% Change Order Max
Balance available
$7,764.00
$0.00
$939.00
0
$1,941.00
$1,002.00
Change Data
Page 1 of
Date:
Change Order No.
Contract:
1
05/25/06
1
R -06-04-13-10E4
Justification:
(1) Standards for HVAC have
changed and 10 SEER units are no
longer manufactured. (2) Turbines
have rusted out and no longer
operate. (3) Flashing has
deteriorated since orginal scope of
work was performed.
Work
Write Up
Line #
(-)
or
(+)
Description of Changes
Unit
Approx
Quantity
Unit Price
Amount
Added Days
Calendar /
Working
14
(+)
Upgrade HVAC unit to 13 SEER
ea
1
$600.00
$600.00
0
17
(-)
Repair existing faucet
ea
1
$51.00
-$51.00
0
NEW
(+)
Replace roof turbines
ea
2
$87.50
$175.00
0
NEW
(+)
Replace pipe flashings
ea
5
$30.00
$150.00
0
NEW
(+)
Install conduit on exposed wire in
HVAC closet
ea
1
$65.00
$65.00
0
Total
$939.00
0
Prepared by07-N,fig
Project Manager Mona yan
ALL TEX BUILDING & RESTORATION, INC.
Date
By:
Title
Contractor
JetyNe-ez-. (11
Homeowner
2//4(a
6/ -
Da e
Homeowner
Date
Percent of Original Contract Price
Maximum % allowed 25%
This Change Order
Previous Change Order
Total % Change
Con
Appr
Title
Date
12%
12%
Change Orders: $8,703.00
City 4iager_ liQ
COLP
u
CDBG Form 5/2006
DATE:
SUBJECT:
ITEM:
September 25, 2006
City Manager Approval
First Amendment to the Community Development Block Grant
(CDBG)-Community Housing Repair Program Contractor
Agreement with All Tex Building & Restoration, Inc. (Exhibit B to
Homeowner Agreement) for the rehabilitation of Lot 3, Block J,
Mesa Park Section 2 (1709 West Mesa Park Drive) for a change
order in the amount of $769.00.
Department: Planning Department
Staff Person: Mona Ryan, Community Development Coordinator
Justification:
Unforeseen expenses occurred during the rehabilitation of
this property that resulted in change orders. Agreements
were approved by City Council in April, 2006 by resolution
R -06-04-13-10E4. The Contractor Agreement and Change
Order do not exceed a total of $15,000, the maximum
allowed per property for the 2005 Community Housing
Repair Program.
Funding:
Cost: $8,533.00
Source of funds: CDBG HUD Entitlement Fund
Background Information: This job was bid out using the original scope of
work write up that was prepared by a
consultant in November, 2004. The
homeowner and contractor agreements went
through second generation revisions which
delayed the solicitation for bids process until
January, 2006. Contractors were instructed to
bid work exactly as called out in bid
documents, even though property inspections
revealed additional work that would need to be
done.
Updated 3-10-05