Loading...
CM-07-04-057CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Public Works PROJECT: McNutt Creek Wastewater Interceptor Phase I ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: PAGE 1 OF 1 DATE: 3/29/2007 CHANGE ORDER NO: 2 JUSTIFICATION: SEE ATTACHED $10,128,830.00 CHANGE ORDER SUPPLEMENT $23,004.52 $17,440.03 $40,444.55 CHANGE DATA ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING CP -8 Additional days due to Ice Storm N/A N/A $0.00 3 CP -9 Production lost due to encountering soft rock material LS 1 $17,440.03 $17,440.03 0 CP -10 Additional days due to Toss of electrical power N/A N/A $0.00 2 TOTAL: $17,440.03 5 PREPARED BY: D. EN (NEER Mole Kassouf Joint Venture Z8 MAR O'7 DATE BY: TITLE: CONTRACTOR c/ /11.0i. APPROVED: zra,me5 R. Kt u.5e) P, E. CITY OF ROUND ROCK e.44 m constco2lforms6/Ik C V o -051 PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: 0.17% PREVIOUS CHANGE ORDER: 0.23% TOTAL % CHANGE: 0.40% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $10,169,274.55 CITY OF ROUND ROCK CHANGE ORDER SUPPLEMENT Project: McNutt Creek Wastewater Interceptor— Phase I Change Order No. 2 Item #CP -8: Ice storms in the area prevented workers from arriving to the jobsite on January 16, 17 and 18, 2007. This item extends the contract time by 3 calendar days. Item # CP -9: The tunnel boring machine encountered rock that was substantially softer than normal on January 9 and January 22, 2007, causing the tunnel excavation to progress at a much slower rate. This item is for monetary compensation for lost production for these shifts. Item # CP -10: This item extends the contract by 2 calendar days due to electrical outages on the jobsite encountered on November 10, 2006 M 1 of 1 • Mole Kassouf Joint Venture Mole Constructors, Inc., Kassouf Co., Inc. and Murray Hill Construction, Inc. 29100 Hall Street Solon, Ohio 44139 Phone 440 248-0616 Fax 440 248-8132 January 23, 2007 Page 1 of 1 K. Friese & Associates 7600 Burnet Road, Suite 290 Austin, Texas 78757 Attn: Mr. Tom Owens, P.E. Re.: McNutt Creek Wastewater Interceptor Project, Phase 1 Delays - Weather related Letter No. 025 Dear Mr. Owens: This letter shall serve to notify the Engineer that we have sustained weather related delays associated with the recent ice event. Given the hazardous road conditions caused by the icing, we were unable to work on January 16th and 17th. Additionally, we lost over half of the day on the 18th. We respectfully request that your team investigate this matter and issue a 3 work day time extension for the impact. Should you have any questions and or comments regarding this subject, please contact me posthaste. Very truly yours, Mole Kassouf Joint Venture Rod R. Shoulders Vice President, MCI Cc: File M -K JV Texas Field Office J. Bell, City of Round Rock DATE April 9, 2007 SUBJECT: City Manager Approval - April 13, 2007 ITEM: Consider authorizing the City Manager to execute approval of Change Order No. 2 with Mole-Kassouf Joint Venture for the McNutt Creek Wastewater Interceptor Project. Department: Water and Wastewater Utilities Staff Person: Michael Thane, Utilities Director Justification: Mole-Kassouf Joint Venture is currently under contract for the construction of the McNutt Creek Wastewater Interceptor. Change Order No. 2 includes the following: production lost due to encountering soft rock material during tunneling and additional days to the contract due to ice storm in January 2007 and due to loss of electrical power in November 2006. The original contract amount plus Change Order No. 1 is $10,151,834.52. Change Order No. 2 will add $17,440.03 to the contract for a new contract amount of $10,169,274.55. Manz Cost: $17,440.03 Source of funds: Capital Projects Funds (Utility Fund) Outside Resources: K. Friese & Associates (Design Engineer) Mole Kassouf Joint Venture (Contractor) Background Information; The project scope of work is to construct approximately 8,545 feet of 48" wastewater interceptor from the existing Brushy Creek Regional Wastewater Plant located on the eastern side of the City of Round Rock, and extend north-easterly to a certain point just north of the McNutt Creek. Project is scheduled to be completed by December 2007. Public Comment: N/A Blue Sheet Fermat Updated 01/20/04