CM-07-04-058e Order
PIJECT: (Name and address)
Gi of Round Rock
S.W. DistrictInfrastructure Improvements
Round Rode, Texas 78664
TO CONTRACTOR (Name and address)
fhasco Constructors
P.O Box 9057,..
Round Rock, Texas 78660
CHANGE ORDER NUMBER: (A (ONE)
DATE: March 9, 2007
OWNER 0
ARCHITECT
ARCHITECT'S PROJECT NUMBER: 104047 CONTRACTOR ❑
FIELD 0
September 25, 2006 OTHER
S.W. Downtown District Infrastructure Improvements
CONTRACT DATE:
CONTRACT FOR:
(Incl
eh
as -e a1
as fn,
!isputed amount attributable to previously executed Construction Change Directives)
TION COST DAYS
2 Rem) rXU Ductbank
atom line at bore crossing'.
3 e ce 8 AC waterline w/8" pvc at 48" RCP crossing
4
12" alve per City Inspector
S 12,60800 + 10 days
S 5,913.00 +3days
S 2,04 00 .. +4 days
3 "2,300.00
Addittobal 14 ys r 48" Smooth Casing F ocuremetn.10 dans for Bore into Rock and 2 tlays for Manhole conflict + 26 days
TOTAL. $ 23,037.00 + 43 days,
h on$inal ( ontract ) was
The change by previously a`a onzed Change Orders
The (Contract Sum) ) prior to this Change Order was
The (Contract Sum)e) will be (increased) )
by-thi Change Order in the amount of
The new (Contract Ste)„ ) including this Change Order will be $
The Contract
Time will be (roc ) ) by Forty Three ( 43 ) days
The date of Substantial Completion as of the date of this Change Order therefore isMarch 7, 2007
(Npte„
been;a,
in whi
Change Order doe
rtz ed by Constnrc
se a hange,Orde
:1 124:709.00
•i
1,124,709.00
23,037.00
1,147,746.00
e changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have
arective until the cost and time have been agreed upon by both the Owner and Contractor,
to supersede the Construction Change Directive.)
NOT VALID UNTIL SI#
PAGE SOUTHERLAND PAGE, LIR_
'.THE ARCHITECT, CONTRACTOR AND OWNER.
CHASCO CONSTRUCTORS
ARCHITECT (Firm name)
400 W. CESAR lAVEt#:500
AU TIN T
CITY OF ROUND ROCK Public Works Dept.
CONTRACTOR (Finn name) OWNER (Firm name)
P.O. BOX 1057 1300 WEST 34TM STREET
Re NO Ree :..,o ®' AUSTIN. TEXAS 78705
DDRESS
ADDRESS
EISLE. III
DATE •'
CAUTION: You should sign an original
changes will not be obscured.
nature
(Typed name)
3-/&
DATE
nature):
toe P. F.
Typed name)
I ADCSI
/7"
s
DATE
AIA Contract Document, on which this text appears in RED. An original assures that
AIA Document G701 TM — 2001. Copyright ®1979,'1987, 2000 and 2001 by The American institute of Architects. All rights reserved. WARNING: This
AMA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document,
or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail
The American Institute of Architects'. legal counsel, copyright@aia.org.
bei -04-05'g '
v
3
1
N
8
0
go8
a
a
Z
O
8
0
1I
0
E
A
N
o
8
5O
n
p CO O Znm
I
S
002
-
• g�-0
Add 12" Valve per City Inspector
Replace 8" AC water line with 8" pvc at 48" RCP
crossing
Revised TXU Ductbank
16" Jumper for storm line at bore crossing
AT&T Material
Description
n
8
n
A
40
N
t
;
-0
Approved
a
k
, Approved
Submitted
Status
5
p
Of
5
8
11/22/06
Q
V
Date
Submitted
O
-
O
_&
OO
-
_&
Contract
Location
N
8
0
go8
a
a
Z
O
8
0
1I
0
rEHASCO
V tiHST8UCT0AS
January 12, 2007
City of Round Rock
2008 Enterprise Dr.
Round Rock, TX 78664
Attn: Mr. Michael Thane, P.E.
Via Fax: (512) 218-5563
No. of Pages w/Cover. 2
Re: Southwest Downtown District Infrastructure Improvements — Phase 1A
(Pond)
Subject: Time Extension
Dear Michael,
Attached is a copy of the breakdown for extra days needed for the above
referenced project. By issuance of this written notification we formally request
that these days be added to the contract time. Please incorporate them into the
next change order.
If you should have any questions, please do not hesitate to call me.
Sincerely,
16)L._ N\
Kellin Neiman
Project Manager
Cc: 05221 —110
SW DTRR Phase 'IA - Pond
1/12/2007
Chasco Job # 06115
Condition
Extra Days
48" Smooth Casing Procurement
14
Extra days needed for Bore into rock
10
RFP #1 - 18" Storm Jumper
0:,
CP #004 - Replace 8" AC WL with C-900
p
6_4_,
RFP #2 - Revised Ductbank
10
RFI #3 - Manhole conflict with Existing WL
2
43
DATE April 9, 2007
SUBJECT: City Manager Approval - April 13, 2007
ITEM: Consider authorizing the City Manager to execute approval of Change
Order No. 1 with Chasco Constructors for the Southwest Downtown
Infrastructure Project, Phase 1A.
Department: Water and Wastewater Utilities
Staff Person: Michael Thane, Utilities Director
Justification:
Chasco Construction is currently under contract for the construction of the Southwest
Downtown Infrastructure Project, Phase 1A. Change Order No. 1 includes the following:
16" storm line jumper at bore crossing, revised TXU duct bank, replacement of 8" asbestos
cement water line with an 8" PVC water line, a 12" valve, and additional days to the
contract. The original contract amount was for $1,124,709. Change Order No. 1 will add
$23,037 to the contract for a new contract amount of $1,147,746.
Fundina:
Cost:
Source of funds:
Outside Resources:
$23,037
GO Bonds
Page Southerland Page, LLP (Design Engineer)
Chasco Constructors (Contractor)
Aackground Information:
This Phase 1A project is part of the infrastructure improvements planned for the Southwest
Downtown District. This particular project includes water, stormwater , and dry utility
infrastructure improvements in the Florence, McNeil, and Blair intersection as well as a
boring of a storm sewer line beneath McNeil Road and the construction of a regional water
quality pond south of the Union Pacific Railroad. The water quality pond is required to be
constructed as part of our approved Water Pollution Abatement Plan with the Texas
Commission on Environmental Quality. As new development projects occur in the
downtown district, this pond is required in order to capture stormwater runoff from these
developed areas located over the Edwards Aquifer Recharge Zone.
Public Comment; N/A
Blue Sheet Format
Updated 01/20/04