CM-07-04-051STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: S.D. KALLMAN, L.P. ("Engineer") ADDRESS: 1106 S. Mays, Suite 100, Round Rock, TX 78664 PROJECT: GREENLAWN PLACE BLUE TUBING REPLACEMENT PROJECT This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and S.D. Kallman, L.P., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 14th day of September, 2006 for the Greenlawn Place Blue Tubing Replacement Project in the amount of $74,731.00; and WHEREAS, it has become necessary to amend the Contract to modify the provision s for the scope of services and to increase the compensation by $13,587.00 to a total of $88,318.00; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $13,587.00 the lump sum amount payable under the Contract for a total of $88,318.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract 1 4113288/0199.6024 gym- o1 -o4 -b51 Rev.07/06/06 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are shown in bold print as follows: Basic Services: Deswn Phase [ 1. Attend preliminary conferences with the City regarding the requirements of the project. 2. Preparation of Plans and Specifications. Construction plans shall include the location of proposed water service replacements and demolition and reconstruction of curb and gutter, sidewalk and driveways. 3. City desires to add to the Project Scope approximately 12,820 linear feet of 8" water line pre -chlorinated pipe bursting to the existing 8" asbestos cement water main. Engineer shall research this innovative method and prepare additional Plans and Specifications to accomplish this addition to the Project Scope. 4. Prepare bid quantities. 5. Prepare final design estimate, specifications and general notes. Bidding Phase 1. Prepare bidding documents and all copies for the bidding process. 2. Add pre -chlorinated water line pipe bursting quantities to the bidding documents. 3. Attend pre-bid conference and attend public bid opening. 4. Review bids received for completeness and accuracy and prepare detailed bid tabulations. 5. Make recommendation for bid award and prepare notice of award. 6. Prepare seven sets of final contract documents. Construction Phase 1. Provide periodic construction inspection services to assure compliance with plans and specifications. 2. Provide additional construction inspection services to add pre -chlorinated water line pipe bursting to the Scope of this project. 3. Attend construction meetings as requested by City. 4. Review and make recommendations to City on submittals, pay requests and change orders. 5. Punchlist the project when contractor requests consideration for acceptance. Sign off on completed punchlist. 6. Prepare and submit a Plan of Record for the completed project. 3 ADDENDUM TO EXHIBIT C Work Schedule The changes to the Work Schedule for this project are as follows: Week: Milestone: 09/15/06 Notice to Proceed Given to Engineer to Design Project 11/15/06 60% Design Submitted to City of Round Rock Public Works Department for Review 12/01/06 City Requests Engineer to Stop Work on Design Phase, Pending Adding the Replacement of Existing 8" Pre -Chlorinated Water Lines 03/01/07 Approval of Supplemental Agreement No. 1 to Restart Design Phase 05/15/07 Final Design Submitted to City of Round Rock Public Works Department for Review 05/29/06 Plans Approved by City of Round Rock Public Works Department Public Notice Advertising Bids 06/12/07 & 06/19/07 Bids Received at City Hall 07/16/07 City Awards Contract 07/23/07 Contractor Returns Contract Documents with Signature, 08/09/07 Bonds, and Certificate of Insurance City Signs Contract Documents; City and Engineer Hold Pre -Construction 08/16/07 Conference and Issues Notice to Proceed Begin Construction 08/23/07 Construction Substantially Complete - Water Service Lines in Service 02/19/08 (6 Months — 180 Days) Final Project Acceptance 03/19/08 4 ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: EXHIBIT "D" FEE SCHEDULE Greenlawn Place Blue Tubing Replacement Project Description HOURS Corporate Officer Registered Professional Engineer Project Manager AutoCAD Design Tech - Sr. AutoCAD Design Tech Admin Total DESIGN PHASE Attend Preliminary Conferences with the City 2 8 10 Preparation of Plans and Specifications 10 60 40 120 40 14 284 Prepare Bid Quantities 4 8 5 6 3 2 28 Prepare Pre -Design and Final Design Estimates 3 6 4 3 16 Design Phase Services (Supplemental Agreement No. 1) 10 21 10 32 10 4 87 Subtotal - Design Phase 18 103 58 161 53 20 425 BIDDING PHASE Prepare Bidding Documents and Copies for the BiddingProcess 2 2 14 18 Attend re -Bid Conference and Public Bid Opening 6 6 12 Review Bids Received for Completeness and Accuracy; Prepare Detailed Bid Tabulations 2 6 8 6 22 Make Recommendation for Bid Award; Prepare Notice of Award 2 2 4 Prepare Seven Sets of Final Contract Documents 1 2 8 11 Bidding Phase Services (Supplemental Agreement No. 1) 0 0 0 0 0 Subtotal - Bidding Phase 5 16 16 0 0 30 67 CONSTRUCTION PHASE Provide Periodic Construction Inspection Services to Assure Compliance with Plans and Specifications 80 60 140 Attend Construction Meetings as Requested by City 20 12 32 Review and make Recommendations to City on Submittals, Pay Requests and Change Orders 14 10 12 5 41 Punchlist the Project when Contractor Requests Consideration for Acceptance. Sign off on Complete Punchlist 6 16 8 30 Prepare and Submit a Pian of Record for the Completed Project 12 20 12 40 84 Construction Phase Services (Supplemental Agreement No. 1) 2 18 17 6 3 46 Subtotal - Construction Phase 34 164 121 46 0 8 373 TOTAL S. D. KALLMAN, L.P. LABOR 68 283 196 207 53 58 865 Table 1 of 4 Greenlawn Place Blue Tubing Replacement Project HOURLY SUMMARY SHEET (ORIGINAL SCOPE) DESIGN PHASE Hours* Salary* Direct Labor Cost* Corporate Officer 19 $ 72.00 $ 1,368.00 Registered Professional Engineer 82 $ 37.00 $ 3,034.00 Project Manager 49 $ 27.00 $ 1,323.00 AutoCAD Design Tech - Sr. 129 $ 28.00 $ 3,612.00 AutoCAD Design Tech 43 $ 24.00 $ 1,032.00 Admin Personnel 16 $ 24.00 $ 384.00 Subtotal 338 $ 10,753.00 BIDDING PHASE Hours* Salary* Direct Labor Cost* Corporate Officer 5 $ 72.00 $ 360.00 Registered Professional Engineer 16 $ 37.00 $ 592.00 Project Manager 16 $ 27.00 $ 432.00 AutoCAD Design Tech - Sr. 0 $ 28.00 $ - AutoCAD Design Tech 0 $ 24.00 $ - Admin Personnel 30 $ 24.00 $ 720.00 Subtotal 67 $ 2,104.00 CONSTRUCTION PHASE Hours* Salary* Direct Labor Cost* Corporate Officer 32 $ 72.00 $ 2,304.00 Registered Professional Engineer 146 $ 37.00 $ 5,402.00 Project Manager 104 $ 27.00 $ 2,808.00 AutoCAD Design Tech - Sr. 40 $ 28.00 $ 1,120.00 AutoCAD Design Tech 0 $ 24.00 $ - Admin Personnel 5 $ 24.00 $ 120.00 Subtotal 327 $ 11,754.00 Total S. D. Kallman, L.P. Direct Labor (ORIGINAL SCOPE) *Estimates for the purpose of computing labor costs. Table 2 of 4 $ 24,611.00 Greenlawn Place Blue Tubing Replacement Project HOURLY SUMMARY SHEET (SUPPLEMENTAL AGREEMENT NO. 1) DESIGN PHASE Hours* Salary* Direct Labor Cost* Corporate Officer 10 $ 72.00 $ 720.00 Registered Professional Engineer 21 $ 37.00 $ 777.00 Project Manager 10 $ 27.00 $ 270.00 AutoCAD Design Tech - Sr. 32 $ 28.00 $ 896.00 AutoCAD Design Tech 10 $ 24.00 $ 240.00 Admin Personnel 4 $ 24.00 $ 96.00 Subtotal 87 $ 2,999.00 BIDDING PHASE Hours* Salary* Direct Labor Cost* Corporate Officer 0 $ 72.00 $ - Registered Professional Engineer 0 $ 37.00 $ - Project Manager 0 $ 27.00 $ - AutoCAD Design Tech - Sr. 0 $ 28.00 $ - AutoCAD Design Tech 0 $ 24.00 $ - Admin Personnel 0 $ 24.00 $ - Subtotal 0 $ - CONSTRUCTION PHASE Hours* Salary* Direct Labor Cost* Corporate Officer 2 $ 72.00 $ 144.00 Registered Professional Engineer 18 $ 37.00 $ 666.00 Project Manager 17 $ 27.00 $ 459.00 AutoCAD Design Tech - Sr. 6 $ 28.00 $ 168.00 AutoCAD Design Tech 0 $ 24.00 $ - Admin Personnel 3 $ 24.00 $ 72.00 Subtotal 46 $ 1,509.00 Total S. D. Kallman, L.P. Direct Labor (Supplemental Agreement No. 1) *Estimates for the purpose of computing labor costs. Table 3 of 4 4,508.00 Greenlawn Place Blue Tubing Replacement Project MAXIMUM COST Labor Cost Labor Overhead 174% Total Labor + Overhead Fixed Fee 10% Total Cost DESIGN PHASE (ORIGINAL SCOPE) $ 10,753 $ 18,710 $ 29,463 $ 2,946 $ 32,410 DESIGN PHASE (SUPPLEMENTAL AGREEMENT NO. 1) $ 2,999 $ 5,218 $ 8,217 $ 822 $ 9,039 BIDDING PHASE (ORIGINAL SCOPE) $ 2,104 $ 3,661 $ 5,765 $ 576 $ 6,341 BIDDING PHASE (SUPPLEMENTAL AGREEMENT NO. 1) $ - $ - $ - $ - $ - CONSTRUCTION PHASE (ORIGINAL SCOPE) $ 11,754 $ 20,452 $ 32,206 $ 3,221 $ 35,427 CONSTRUCTION PHASE (SUPPLEMENTAL AGREEMENT NO. 1) $ 1,509 $ 2,626 $ 4,135 $ 413 $ 4,548 Direct Costs: Expenses: Rate Quantity,Total Reproduction $ 0.10 405 $ 405 Copies - 11x17 $ 0.30 150 $ 45 Mileage $ 0.445 120 $ 53 Mail & Deliveries $ 10.00 5 $ 50 Total Expenses $ 553 Total Direct Costs $ 553 Total S. D. Kallman, L.P. Maximum Cost (ORIGINAL SCOPE) $ 74,731 Sub -Total S. D. Kallman, L.P. Additional Cost (SUPPLEMENTAL AGREEMENT NO. 1) $ 13,587 Total S. D. Kallman, L.P. Maximum Cost (ORIGINAL SCOPE & SUPPLEMENTAL AGREEMENT NO. 1) $ 88,318 Table 4 of 4 S.D. KALLMAN, L.P. By: Printed Name: StrA1G" D. gt,Llrra.,,i A6. Title: Pres d,r,.4- 3.A9-01 Date CITY F ' OUND ROCK By: 7`! - &meSR. L1u e. 14_' Date a APP ' X1.4 ED AS T 1 FORM: ry "" Je,r- Stepha L. Sheets, City Attorney 2 DATE: April 2, 2007 SUBJECT: City Manager Approval- April 6, 2007 ITEM: Action authorizing the City Manager to execute Supplemental Agreement No. 1 to the Engineering Services Contract with S. D. Kallman, L.P.- Engineers and Environmental Consultants for the Greenlawn Place Blue Tubing Replacement Project. Department: Water and Wastewater Utilities Staff Person: Michael Thane, P.E. Director of Utilities Justification: This supplemental agreement No. 1 adds the scope for providing engineering services for the asbestos -cement (A/C) water line replacement to be performed in conjunction with the blue tubing replacement project for the same area. This project will replace the A/C water lines in Greenlawn Place Sections 1, 2, & 3, and Windy Terrace Section 1. Windy Park Sections 1 & 2 do not have A/C water lines so these water lines are not scheduled to be replaced. Funding: Cost: $13,587 Source of funds: Self Financed Utility Fund (F220) Outside Resources: S.D. Kallman, L.P. Background Information: The blue tubing replacement effort has been an on-going effort by the city. Replacing A/C water lines associated with the blue tubing service lines should benefit the city by systematically 1) reducing additional unaccounted for water losses, 2) reduce the burden and expense by the city water maintenance forces by reducing leaking water lines, and 3) renew the city's water transmission lines by placing new lines in service and replacing lines that are at or near the end of their design life. The schedule for water line replacement has been coordinated with the City's Transportation Department so street paving improvements will occur soon after this project is completed in Fall 2007. Public Comment: N/A Blue Sheet Format Updated 01/20/04