CM-07-04-065CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER Project: Forest Creek Gotf Clubhouse Expansion Address: 99 Twin Ridge Parkway Change Order No.: 3 Initiation Date: 4/12/2007 Round Rock, Texas 78664 Contract For: New Construction To: G. Creek, Inc. P.O. Box 163764 Austin, Texas 78716 (Contractor) The Contract is changed as follows: Contract Date: 11/21/2006 to 4/1/2007 HVAC Changes from original scope + $36,784.00 Deduct removing carpet & Flooring from contract - ($15,000.00) Total add $21,784.00 The original (Contract Sum) was• $ 449,961.50 Net change by previous authorized Change Orders. $ 62,205.22 The (Contract Sum) prior to this Change Order was. $ 512,166.72 The (Contract Sum) will be (increased) by this Change Order $ 21,784.00 The new (Contract Sum) including this Change Order will be• $ 533,950.72 The Contract time will be (changed) by (45 )days: The Date of Substantial Completion as of the date of this Change Order therefore is: 5/16/2007 R. GiH & Associates G. Creek Inc. Ardrtea P.O. Box 4307 Addrass Contractor P.O. Box 163764 Address City of Round Rock Omer 221 East Main Street Address Ba Texas 78657 Austin, Texas 78716 Round Rock, Texas 78664 Ray Gill Matt Haraison Jarr R. Nuse, P.E •Qt‘' 9" 64g' u 71- eint—o i—o4- c rgte Date f a " I at1 , CON1911-FlUCTICOINI PROJECT: Forest Creek Golf Course OWNER ARCHITECT CONTRACTOR FIELD OTHER The Contract is proposed changed as follows: General Description: Items 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Description Request for Proposal No: Date HVAC Changes Mechanical changes from original scope (based on saving $15,000 in value engineering on quote) G. Creek Subtotal Insurance 2% Bonds 2.5% General Contractor Subtotal Overhead & Profit 10% 4 03/29/07 Amount 32,000.00 32,000.00 640.00 800.00 33,440.00 3,344.00 Total Change Order 36,784.00 The Contract Time will be increased (deceased) by G. Creek Inc. Contractor PO Box 173764 Address Austin, TX 78716 By Date Malt Heroism working Days 45 ;ENT BY; ; 1/1 d 512 452 5918; • • MAR -29-07 4:30PM; PAGE 4/5 Briggs Mechanical Inc. TACLA 022111E 384 Commercial Drive Buda, Texas 78610 To: Re.: For. Craig R. Briggs Phone 512) 312-2500 Fax 512) 312-2514 Pronosal March 21, 2007 G Creek Construction Forest Creek Golf Club - Pro Shop H.V.A.C. - ** Revised 03/08/07 4* ScODe of'Work: * Select demolition of existing equipment, ductwork, piping, controls, etc * Furnish & Install HVAC equipment/accessories as scheduled: (5) Split System AIC Units — "Lennox" high efficiency gas/electric systems (1) Dehumidification Unit— "Munters" desiccant dehumidifier (1) Grease Hood — "Captive -Aire" Type I Exhaust Hood with fire suppression system (2) Roof Mounted Kitchen Pana —"Captive Aire" Exhaust R Supply Air Fans (1) Restroom Exhaust Fan — "Loren Cook" Inline Cabinet Fan Above with all associated ductwork, dampers, air devices, hangers, equipment supports, air filters, flues, fleshings, refrigerant piping, condensate drains, insulation, access doors, tetnperature controls, low voltage control wiring, system start-up and balancing. No Sales Tax Included $ 95,000.00 Cost Savings: * Reuse existing condensing units — (2) 4.0 ton "Trane" M80048 * Delete "Munters" desiccant dehumidifier (Future drop-in installation) • Utilize fiberglass duct board in lieu of shoot metal for duct trunk lines. Net Deduct $15,000.00 Standard Exclusions: Plumbing / Fire Protection / Refrigeration / Electrical Structural Supports / Housekeeping Pads — Poured Concrete Cutting/Patching/Painting Chases/Fur Downs Special Bonding Roofing Work Rested by The Department of Lice ubse aad Regulation P.O. Box 12157 Austin, Tem 78711 1-800-803-9202 91SS ZSV ZIS « PISZZLEZLS ,/-'6 /73; vee (kvitcr- or:1610- titmotte 1 pi CO Gas 1113INVH3314 S991119 SE;EI 6Z-EO-LOOZ SENT BY: ; CCP NSTRUCTICN 512 452 5916; OWNER ARCHITECT CONTRACTOR MELO OTHER X MAR -29-07 4:30PM; PAGE 2 PROJECT: Forest Creek Golf Course The Contract is proposed changed as follows: Request for Proposal No: Date 4 03/29/07 Deduct Carpet & Flooring as per original attached Schedule of Values $15,000 0 2 A Q t 3 V9 r J 0 0 0 0 O cr2 a 0 0 a H > 0 EH $.4� x1 E'.: 3lt WE= Ft7sg> �d�d�ga acacR e 9 a � H 4.1Ca 0 o A A 0 0 V f v N 0 0 outs o0 0 o0 bo 0 0 0 N N•• 'O 00 J Os to A 1..+ sO 00 J Q• H A W N �+ 3 a a w w - coverea patio expansion n.. ca O cr5 2'a° mtsc ^pain access, rue ext, sealants, etc. •'r n ei 0 a g. E °' gg c a a 5 p+ E 0o..• t 8 Q A.0 pr Fa R.a .F. 1 n Z supervision ana general conditions a_ Description of Work FTiflI - $ 48,000.001 nw Cg --r $ 15,000.00 1 $ 16,500.00 0 - 1 $ ' 30,000.00 1 $ 3,000.00 -=ii 1 $ 20,000.00 —< Q O. df P$ 8 y 8 O 8 O 8 O 8 O 8 {� $ 8 O 8 so.00 yrO O 8 y 8 O 8 O O 8 8 O 8 O 8 $ 8 O 8 1$0.00 $o.00 O 8 O 8 O 8 O 8 8 O 8 $ 8 $ 8 $ 88 oor000'st$ oo•os Application Period From Previous Work Completed b U A 8 Q? {y/� pO 8 {N� pO 8 {� 8888O g O y O y O y 8 pO 8 8888888888O O O O O O O O O O 888888888O N C O y O y O N Stn O O 8N O pW O y pW 8 . Gx PS Stored, Not in C A lA $0s0%'`b'�a'25,�a',r'•�Srr 8 8 8 8 8 8 8 _H 5� 8 8 8 8 8 50.00 50.00 8 8 8 8 8 8 yy W 8 8 8 {/� r 8 5- 8 5N� 2588 8 y W 8 {� W 8 5-5� § 8 To Date Stored 3 N R . m {Of F —0 g;M. 2.MWMW g Yah e Wto A 0 8 8 8 8 88888.8888888888888888 owwHNHNH Q HOs HO Hu §Qg§§§ o! H p7 H E. ,?r— 0 yN 88 1 67u em .7.trentQ§ H zJ N to 0 M 8 M 88.8888888888888888888888888 M N N N p C N y� {� N {� r y� {� r N y {� s N {� M {� s {� N yy�r O yy�� 0. yyrr {N� 0 0 pp 0$ 8 U ,VJi yr O 1- . 0 2 A Q t 3 V9 r J 0 0 0 0 O cr2 a 0 0 a H > 0 EH $.4� x1 E'.: 3lt WE= Ft7sg> �d�d�ga acacR e 9 a � H 4.1Ca 0 o A A 0 0 V f v N 0 0 outs o0 0 o0 bo 0 0 0 DATE: April 23, 2007 SUBJECT: City Manager - April 27, 2007 ITEM: Action authorizing the City Manager to execute Change Order Number three with G. Creek Construction, Inc. for Forest Creek Golf Course Clubhouse Renovations/addition. Department: Engineering & Development Services Staff Person: Tom Word, Chief of P.W. Operations Larry Madsen, Liaison Construction Manager Justification: This change order includes changes to the air conditioning system as well as removing the carpet and flooring from the contractor's agreement. Changes to the HVAC system became necessary once construction began on the project. The original plans called for the use of the two systems in the clubhouse and the addition of one system. Upon completion of the new drawings, the tonnage needed for occupancy loads, and new energy requirements the system for HVAC increased to five units. Upon review of the outdated existing equipment it was determined that only the outside condensing units were of any value and new pricing was requested. The total for the new HVAC system along with Contractor's Profit & OH plus insurance and additional bonding came to a total of $36,784.00. Included in this change order is also a deduction to take the carpet and flooring out of the contract. Flooring is available under state buy board contracts including Texmass and can be purchased and installed at discounted pricing. Funding: Cost: $ 21,784.00 Source of funds: Golf Course Construction Fund Outside Resources: Mike Ussery of the Golf Course Management Company has been consulted and is in agreement with this change order. Background Information: N/A Public Comment: N/A Blue Sheet Format Updated 01/20/04