CM-07-05-085CITY OF ROUND ROCK PUBLIC WORKS
CONSTRUCTION CHANGE ORDER
Project Fire Station No. 2
Address: 200 West Bagdad Avenue
Change Order No.: 4
Initiation Date: 5/2/2007
Round Rock, Texas 78664 Contract For. Fire Station No. 2
To: Royce Construction
1801 Whip 0 Will
Round Rock, Texas 78681
(Contractor)
The Contract is changed as follows:
1. Refrigerant Lines in Bay/ Sheet Metal Cover Add
Contract Oats: March 23, 2006
2. Wood Trim for Apparatus Bay Add
$280.00
3. Garbake Disposal
Add
$150.00
$160.00
4, Additional Electrical outlets for security Add
5. Additional Electrical for garage doors
Add
$799.00
$1,762.00
6. Additional tile work including shower curb
Add
$2,759.00
Total $5 910.00
=marry
The original (Contract Sum) was: $ 1,155,949.00
Net change by previous authorized Change Orders: $ 28,759.49
The (Contract Sum) prior to this Change Order was:...... ...... . ........ .........
............ ... ............... $ 1,184.708.49
The (Contract Sum) will be (increased) by this Change Order $ 5,910.00
The new (Contract Sum) including this Change Order will be• $ 1,190,618.49
The Contract time will be (unchanged) by ( )days:
The Date of Substantial Completion as of the date of this Change Order therefore is:
Changes included in the summary above (do) (do not) include modifications which have been authorized by Construction
Change Directive(s).
PBS&J
Architect
Royce Construction
C or
6504 Bridge Point Parkway #200 1801 Whip 0 Will
Address Address
Austin Texas 78730
The City of Round Rock, Texas
Owner
221 East Main Street
Address
Round Rock, T 78681 Round Rock, Texas 78664
By
Franklyn King Royce Todds
Date
6/x/07
em- on- 05-0%r
CO Art it�d . /AdrtriNMmia
5-t i-atxn
Date
Rove emouteremeommityloc.
512 -.7c7-
Additional Items for Change Order
1. Refrigerant Lines Metal Cover $ 280.00
2. Wood Trim for Apparatus Bay $ 150.00
3. Garbage Disposal $ 160.00
4. Additional Electrical Outlets for Security $ 799.00
5. Additional Electrical Required for Operation of Garage Doors $1762.00
6. Additional Tile Work ( adding extra tile to wall) $2459.00
7. Additional Tile Work ( adding curb to each shower). $ 300.00
Total $5910.00
Apr cep u♦ ua:aip uu INS
GQ Tile Co.
512491510/ p.1
2301 Denton Drive. &Me K • Austin. IX 78758 • (512) 491-5335. Fax 491-8101
Emile BQvea
April 25, 2007
TO: Royce Cor ruction
ATTN: Ronnie Tsdmtscbala
FAX NUMBER 512/388-0922
PROJECT: Fire Station #2 — Resod Rock
Ramarkhav Waimea* Tile Adja stance t aavd Now Marine Thresipkb
Ronnie,
Below I have included pricing for the additional tile work at the wainscot and the marble
golds per your request. This price includes the removal of the top row of bullnose cap, installing a
new row of flat tile with a new bullnose cap (all gray tiles) and then groutiug of all new tile. This work
will be performed at all wainscoting throughout all ceatrooms. Of rourse we amnot guarantee the
drywall will not be damaged during the deinolitian, however with adding another 4" of wall tie to the
wainscot, I can not kr see say big problena. I do that we will be able to cover most of the damaged
drywall Wax all the damaged drywall with the new tile. Therefore, the price below includes the new
waaascot flat tile, new bulbous trims setas$ metalals, grout anatecWs and the labor to perform the work.
The price below also includes the removal of the existing marble tbeesboids and installing new
taller thratholds to help prevent waters'out thtibstuaddy I will have to by ane more epoxy unit, to
regrow the ttirrsholds on the interior of file shower. So, the price below incudes new taller thresholds
(1 i " to 518" — the tallest they sell in a 2" wide thtesitold), epoxy groat forthe interior of the shower,
sdting , goaded grout for the exterior ofthe shower and the labor to perform the work. If you
ire any questions pkase give me a call.
Description Cost
Materkd S 505.00
Labor S 1,293.00
Bodes $ 437.10
Profit $ 324.00
Total Cost S 2,459.00
That cot Ws Clow $ 2,459.00
Ifyou have any questions please give me a call.
Ttaazlk yau,
rrj<J6
Grant Gibson
Estimator/Project Manager
Apr 30 07 01:49p GQ Tile 5124918101 p,1
GQ Tile Co.
2301 Denton Drive, Suite K • Austin. TX 78758 • (512) 491-5335. Fax 491-8101
Ewell: gaveaturesailsbcglobaLnet
April 30, 2007
TO: Royce Construction
ATTN: Ronnie Tschatschula
FAX NUMBER 512/686-1896
PROJECT: Fire Station #2 — Resod Reck
Remarking. Shower Curbs
Ronnie,
Below I have included pricing for the additional the work at the showers per your
request. This price includes the waterproofing and wrapping with tile of a new curb (curb installed by
others) at all throe shower cubicles. If You have any questions please give me a call.
Total Cast This Change $ 300.00
Ifyou have any questions please give me a call
Grant Gibson
Estimator/Project Maw
04/11/2807 20:28 5156838
MCLENNA ELECTRIC INC PAGE 09/09
V -41* -Z (0 0V -(1A1 LAI I ov3 0 _ TA..16
.1111.0
j`I LrITh 4.4 u ki U o tL 1- GIS I rCt1/117R. eo
%Pct itko wt 20/L Avis3 moo, cw R -c., w c �(flLc 3
IJ 6 L iG esom FDR $EW 4.r r!./ .40340 DOo,a
gi 7)*A A 7b 66 eleett4 em Pic. .
kf 37A4 z,
04/11/2007 20:28 5156838
MCLENNA ELECTRIC INC PAGE 06/09
McLenna Electric Inc.
15201 W. hwy 29
Liberty 11111, TX. 78642
Ph. 512.515.6660 Fax 512.515.6838
Change Proposal
Date: April 12, 2007
Proposal: Additional wiring 120 power to Security
Project: Round Rock Fire Station #2
Project No. A72011
Owner: City of Round Rock
G.C. Royce Construction
Attn: Ronnie Tschatschula
The items below enumerate modifications requested by owner. Datil written notice of
acceptance is received, this work will not be performed.
ost $ 799.00 (Seven hundred ninety nine and no/100)
Wuk Description: Run conduit / wiring to each of (4) receptacles for power to Security
power supplies. Mount (2) card reader power supplies and make connection.
Additional days required to complete this revision: 0
By: Richard McLenna
McLenna Electric Inc.
04/11/2007 20:28 5156838
4/12/2007 8:14:17 AM
Item N
Description
Round Rock
1000 1/2" EMT
1426 1/2" Set $Crew Os Cast Conn
1546 1/2" Set Screw Oie Cost Cplg
2355 1/Z" Conduit Hanger w/Bolt
2573 4" Squsre Deep Box (1/2.8 314 KO's)
MCLENNA ELECTRIC INC
PAGE 08/09
Page 1
Ext Lab Nr
Fire Station *2 : Add Recep's and 120 power for Security
Extension Sy Pease
tawntlt�r _ _ Prk.� U -- _ Ext Prize_ _Labor Nr U
- 01 Raceway, Fittings & Boxes -
40.00 30.00 C 12.00 4.00 C
2.00 41.45 C 0.83 0.10 E
4.00 43.48 C 1.7+0 0.02 E
10.00 31.89 C 3.19 12.50 C
4.00 456.89 C 18.28 0.18 E
38.04
«- 01 Raceway. Fittings S Boxes Total --
2787 *12 THHN CU Solid Wire
2917 1212 Steel MC Cable w/Green Oround Wire
- 02 Wire 8 Cable Total -
4511 20A/128V Spee Grade Dup Rapt (5-20R)
4717 4- Square 10 Ind Dup Ropt Cover
- 05 Wiring Device & Covers Total --
6839
8068
22723
Red Wirenuts
10x1" TEK Screw
MC Connector single banal
-- 07 Mac Total -
Job Totel
-- 02 Wire 8 Cable -
150.00 • 145.00 M
100.00 975.00 M
- 05 Waing Devioe•& Cbvers --
4.00 230.00 C
4.00 165.29 C
-- 07 Misc -
30:00 • 94.68 M •
25.00 7.99 C
10,00 22.00 C
21.75
97.50
119.25
5.50 M
14.00 M
9.20 0.15 E
6:61 0.07 E
15.81
2.84
2.00
7.04
178.14
1.75 C
0.01 E
0.08 E
1.80
0.20
0.08
1.25
0.72
3.85
0.83
1.40
2.23
0.60
0.28
0.88
0.53
0.25
0.80
1.58
8.54
04/11/2007 20:28 5156838
4/12/2007 8:14:07 AM
MCLENNA ELECTRIC INC PAGE 07/09
Round Rook Fire Station 12 : Add Recop's end 120 power for Security
Totals (Summary) - did Summary: Default
Page 1
Material
Non -Quoted 5178.14
Quotes 0.00
Sales Tex (0.00%) 0.00
Total Materiel 1178.14
Labor
Direct (6.54 hours (1 $42.61) 1363.89
Nonproductive Labor 90.00
Total Labor $453:89
Direct Job Excenes 50.00
Tools and MIsc 0.00
Subcontracts 0.00
Job Subtotal (Prime Cost) 1632.03
Overhead (15.00%) 94.80
Profit (10.00%) 72.88
Job Total $799.31
Actual Bid Price 1799.51
Material t0 Direct Labor ratio: 0.33
Prime Colt per square foot
Job T.otal per square foot
Actual Sid Price per square foot
Labor oust per square foot
10.00
10.00
10.00
10.00
04/11/2007 20:28 5156838
MCLENNA ELECTRIC INC PAGE 05/09
.77t,_ gte
(Le TLo4t2.
NeeP hum& Fo 11. ADO( row tt,
zuVt L7eA DQOJL O4t4I VIA
04/11/2007 20:28 5156838
Change Proposal
Date: April 12, 2007
Proposal: Additional wiring to Overhead
Project: Round Rock Fire Station i2
Project No. A72011
Owner. City of Round Rock
G.C. Royce Construction
Attn: Ronnie Tschatschula
MCLENNA ELECTRIC INC PAGE 02/09
McLenna Electric Inc.
15201 W. hwy 29
Liberty Hi11, TX. 75642
Ph. 512.515.6660 Fax 512.515.6838
The items below enumerate modifications . by owner. Until written notice of
acceptance is received, this work will not be pcd.
Cod $ 1,652.00 (One thousand six hundred fi ' two and no/100)
Work Descrintlon: Run conduit and control wirt
Overhead door operators. Mount controllers and
Overhead door operator.
to each of (5) controllers for
akc connections at controllers and
Additional days required to complete this revision 0
By: Richard McLenna
McLenna Electric Inc.
84/11/2087 28:28 5156838
4/12/2007 7:58:41 AM
Item
Description
Round Rock Fite
1001 3/4" EMT
1121 1 /2" Steel Flex
1437 3/4" Set Screw Steel Conn
1557 3/4" Set Screw Steel Cpig
1599 3/4" Plastic Bushing
1885 1/2" Dle-Cast Straight Squeeze Flex Conn
2356 3/4" Conduit Hanger w/Bo4
2573 4" Square Deep Box (112 S 3/4 KO's)
-- 01 Raceway, Fittings & Boxes Tobi --
2980
2973
4790
6876
8877
8883
8068
70001
1/,2" Romex Conn
4 Cond Control wire
- 02 Wire S Cable Total -
4" Square Flat Blank Cover
-- 05 Wiring Device & Covers Total -
1" Pleaatic Anchor w/112 Screw
*14-16 Forked Tongue Crimp Conn
12" Ty Wrap
10x1" TEK Screw
Mount controllers
- 07 Mine Total -
Job Total
- Trade Price. Label' column 2
MCLENNA ELECTRIC INC
PAGE 04/09
Page 1
Dation int : RR Fire Station OH Doer Controls
Extension By Phase
Quantity Price U Ext Price Labor Hr U Ext Lab Hr
01 Raceway. Fittings & Boxes -
100.00
10.00
10.00
10.00
5.00
10.00
20.00
5.00
53.00 C
33.00 C
91.55 C
113.26 C
26.29 C
100.70 C
36.89 C
456.89 C
--02Wire & Cable
�--
10.00 41.23 C
226.0b 827.63 M
- 05 Wiring Device & Covers -
8.00 . 108.81 C
--- 07 Mlac --
35:00 0.1$ E
50.00 29.68 C
20:00• 46.88 C
38.00 7.99 C
5.430- • 0.00 E
53.00
3.30
9.18
11.33
1.31
10.07
7.3b
22.84
118:39
6.00 C
8.00 C
0.06 E
0.06 E
0.01 is
0.08 E
12.50 C
0.10 E
4.12 0.10 E
. 138.08 10.00 M
142.20
• 5.33 •
5.33
• 5.25
14.84
0.38
2.80
0.00
32.27
298.19
0.0? E
12.00 C
110 C
0.03 E
0.01 E
OPEN
6.00
0.50
0.60
0.60
0.05
0.80
2.50
0.90
11.98
1.00
2.20
3.20
0.35
0.35
4.20
0.90
0.60
0.35
0.00
6.06
21.55
04/11/2007 20:28 5156838
4112/2007 718:16 AM
MCLENNA ELECTRIC INC PAGE 03/09
Round Reck Pre Station 62 : RR Fire Station OH Door Controls
Totals (Summary) - Bid Summary: Default
P49,1
Material
Non -Quoted 5298.19
Quotes 0.00
Sales Tax (0.00%) 0.00
Total Material 9298,19
Labor
Direct (21.55 hours 942.61) 991125
Non-productive Labor 90.00
Total Labor 91,008.25
Direct Job Expenes 90.00
Tools and MIS; 0:00
Subcontracts 0.00
Job Subtotal (Prime Cost) 51,30144
Overhead (15.0091) 190.97
Profit (10.00'x) 150.24
Job Total 91.852.80
Actual Bid Price 81,861.65
Material to Direct Labor ratio: 0.25
PAM Cost per square foot 80.00
Job Tatar per square foot 1100
Actual Bid Price per square foot 10.00
Labor cost Per squaw foot 90.00
DATE: May 7, 2007
SUBJECT: City Manager - May 11, 2007
ITEM: Action authorizing the City Manager to execute Change Order No. 4
with Royce Construction for Fire Station No. 2.
Department: Engineering and Development Services
Staff Person: Tom Word, Chief pf P.W. Operations
Larry Madsen, Construction Manager
Justification:
The following items were added as they were not included in the original plans but needed
to complete project. Open Refrigerant lines in the bay area needed to be protected by a
sheet metal cover, additional wood trim at apparatus bay to complete work, garbage
disposal had not been specified for kitchen area. Additional electrical wiring and outlets
provided for security system and garage doors. Additional tile requested from original
design to provide curbs in showers.
Funding:
Cost: $5,910.00
Source of funds: 2002 GO Bonds
Outside Resources: N/A
Background Information: N/A
Public Comment: N/A
Blue Sheet Format