CM-07-06-095ROUND ROCK, TEXAS
ruairosr. PASSIM Paasrearrx
Date of Request:
Change Order Request Form
Rock'n River Family Aquatic Center Parking Lot Expansion
Self Financed Construction General
PKOIRRPL
April 12, 2007
NOTICE to the CONTRACTOR: This document is notice to proceed with work at the rates herein on executed date of last approval signature.
Order
Number
Approval of the following change in the Plans and / or Specifications is requested:
Description:
Removed seeping calcium subgrade beneath paving to a depth of approximately 2.5 feet, Placed base material over geotextile fabric for subgrade. Adjust to final
quantities,
JustHicatfon:
Attempted to overexcavate unsuitable subgrade to find stable layer, Per engineer's approval, geotextile installed and base material placed in overexcavation,
Unsuitable material will be discarded according to contract. Adjusting to the quantities installed.
Department: EDSD
Original Contract Days (Calendar) :
Start Date: March 12, 2007
CORR PM:
Inspector.
Engineer.
I ITEM #
4
12
13
William J. Dobrowolski III, PE
Matt Krueger
CORR EDSD
Daniel Lynn Haben, PE, CFM
2008 Enterprise Drive
Round Rock, Texas 78664
(512)218-8810
(512) 2 8-5583
UNIT
Y
F'
sY
DELTA
QUANTITY
59:00;
(600,00)
24-
30
32'
EA
ROLL
EA
DAY
31i
BEFORE
QUANTITY
1575.00
.1200:00
4500.00
785:00
60o00
1.00
1.0o'
2.00
7:00
49.00
6.00
60:00
60
Contract Amount Original:
Current:
With this Change Order.
Completion Date Original :
Current:
With this Change Order.
Contractor. Champion Site Prep, LP
Scott Yocham, Project Manager
1455-A Highway 195
Georgetown, Texas 78628
T: (512) 863-3453 F: (512) 8833463
CORR PARD
David M. Buzzell, RLA
301 W. Bagdad SL Ste 250
Round Rock, Texas 78664
(512) 341-3345
(512) 218-5548
POST
QUANTITY
1731.00
1356.00
4450.00
818.00
52.00
7.00
1.00
2.00
67.00
May 10, 2007
May 10, 2007
May 21, 2007
195,030.75
195,030.75
204,763.06
% of OC
100.00%
100.00%
104.99%
DESCRIPTION
Additional Excavation for unstable subgrede
Additional Etase for subgrade
1h -Ty D -):LMAC
PCC Curb &Gutter
Erosion Contrattanket
PCCWheel Stop
UNIT PRICE'
$ 19.20
.$' 00
$
$
35=
3" Texas Red Oak
Geo -textile Fabric for sub grade stabilization)'
Nandi Cap Signs
Calendar Days
$
45.00
$ 575.0
71,5:()(1
$ ` 200.06
DELTA
ITEM COST
$ 2,995.20
$ 5,460.00
$ (408.00)
$ 550.11
$ (690.00)
$ 135.00
$ 575.00
$ 715.00
$ 400.00
BEFORE
ITEM COST
$ 30,240.00
$ 42,000.00
$ 36,720.00
$ 13,085.95
$ 690.00
$ 2,205.00
$ 3,450.00
POST
ITEM COST
$ 33,235.20
$ 47,460.00
$ 36,312.00
$ 13,636.06
DELTA
DAYS
2'
2,'
$ 2,340.00
$ 4,025.00
$ 715.00
$ 400.00
7
TOTAL NET OVERRUN (UNDER RUN)
Materials($) (Non -taxed)
Services($) (Taxed)
TOTAL $
$6,352.45
$3 379.86
9,732.31
$ 9,732.31
$ 128,390.95
Calendar Time Extension (Deletion):
Current Contract 'UNIT PRICE', unless the item not in original bid or warrants newprice • contract documentation. Completion Date with Delta Time:
Recommended for approv,
William J. Dobrowotsj
CORR EDSD Pro' t Manager
Recomm
e..., pro. 1 by:
aniel L Holden, PE, CFM or David M. Buaell, RLA
CORR Designer
-{37---LLp-b9S
AC
tt Yocham
hamoion Site Prep. • Proiect Manager
ACCEPTED:
$ 138,123.26
$ 11.00
11 Days
May 21, 2007
03/a s/V-007
Nuee. PE
nager
Date
2007
Date
DATE: May 25, 2007
SUBJECT: City Manager - June 1, 2007
ITEM: Action authorizing the City Manager to execute Change Order # 1
with Champion Site Prep, LP for Rock'n River Family Aquatic Center
Parking Lot Expansion
Department: Engineering and Development Services
Staff Person: Danny Halden, P.E., City Engineer
Justification:
Change Order # 1 is needed to adjust for final quantities.
Funding:
Cost: $9,732.31
Source of funds: General Self Financed Construction
Outside Resources:
Champion Site Prep, LP
Background Information:
During the first season of operation of the aquatic center, the City provided mulch covered
overflow parking because of high attendance rates. This expansion upgraded the overflow
parking area to a paved surface.
Public Comment: N/A