Loading...
CM-07-06-100THE STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO "AGREEMENT FOR CONSULTING SERVICES FOR CONSTRUCTION MATERIALS TESTING AND OBSERVATION SERVICES FOR CR 122 FEDERAL AID PROJECT NO. BR2006, CJS 0914.05.135 WITH RABA-KISTNER-BRYTEST CONSULTANTS, INC." FIRM: Raba-Kistner-Brytest Consultants, Inc. ADDRESS: 8200 Cameron Road, Suite C-154, Austin, Texas 78754 PROJECT: CR 122 Federal Aid Project No. BR2006, CJS 0914.05.135 (Redbud Lane Phase 3) This Supplemental Contract No. 1 to "Agreement for Consulting Services for Construction Materials Testing and Observation Services for CR 122 Federal Aid Project No. BR2006, CJS 0914.05.135 with Raba-Kistner-Brytest Consultants, Inc." is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Raba-Kistner-Brytest Consultants, Inc., hereinafter called the "Consultant." WHEREAS, the City and the Consultant executed the referenced Agreement, hereinafter called the "Agreement", on the 1st day of December, 2006 for the Project; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services and modify the compensation; and NOW, THEREFORE, premises considered, the City and the Consultant agree that said Agreement is amended as follows: I. Exhibit "A" entitled "Cost Estimate Breakdown" shall be amended by adding the Concrete and Asphalt items delineated in the attached Addendum to Exhibit "A". II. Section 1.1.2.5 shall be amended by increasing by $7,570.00 the lump sum amount payable under the Agreement, the breakdown for such $7,570.00 increase being shown in the attached Addendum to Exhibit "A", for a total of $27,570.00. IN WITNESS WHEREOF, the City and the Consultant have executed this Supplemental Contract No. 1 in duplicate. RABA-KI ER-BRYTEST CONSULTANTS, INC. By: Printed Name: C la rite cYv1.LtO ',Jl� Title: 1-i ✓✓OL{,ct,i� Date Signed: 10 l L t 07 00116320/jkg 0,111-09-af-(00 CITY OF ROUND ROCK By: n Printed JAME6 %7 , /t1USe) R6 I Title: Cil 1)1 /!1/'11)/' (?`E Date Signed: By: Christine R. Martinez, City Secretary Sheets, City Attorney 2 ADDENDUM TO EXHIBIT "A" CONCRETE Field Testing/Observation Materials Technician $40.00 hour 68 $ 2,720.00 Concrete Compressive Strength Cylinders $20.00 each 160 $ 3,200.00 Vehicle Travel Charge $25.00 trip 34 $ 850.00 Subtotal $ 6,770.00 ASPHALT Laboratory Testing Bag Sample (Extraction, Gradation, A/C content, $340.00 each 2 $ 640.00 Molding Specimens, Laboratory Density of Molded Specimens, Stability Test, Hveem, Maximum Theoretical Specific Gravity) Density of Asphalt Cores $80.00 each 8 $ 160.00 Subtotal $ 800.00 Total _ $ 7,570.00 3 00 CD CD D� 03 m W m ,1 g CD CD Q CO r m 0 R45 Date: Subject: Item: Department: Staff person: June 4, 2007 City Manager Action - June 8, 2007 Action authorizing the City Manager to execute Supplemental #1 Construction Material Testing Contract with Raba-Kistner- Brytest Consultants Inc., for the Red Bud Lane Phase III Bridge. Justification: Transportation Services Thomas G. Martin, P.E., Director of Transportation Services The scope of work includes the observation and testing to the following construction materials: Laboratory testing, in place field nuclear density testing, and proof rolling observation; Concrete compressive strength specimen sampling, testing and reporting; and, Hot mix asphalt concrete (HMAC) testing. Funding: Cost: $7,570.00 Source of funds: 4B - RR Transportation System Development Corporation Outside resources: Raba-Kistner-Brytest Consultants Inc. Background information: Raba-Kistner-Brytest Consultants, Inc., provided similar construction materials testing services for A.W. Grimes Boulevard Phase I & II Projects. The Construction Material Testing contract was approved by City Manager on December 1, 2006. Public comment: NA