CM-07-06-101CITY OF ROUND ROCK CONTRACT CHANGE ORDER NO. 1 Date: ADDED TIME DAYS Sheet: 1 of 2 Contract: Westinghouse Road Tank & Well Improvements Owner: City of Round Rock, 221 East Main Street, Round Rock Texas 78664 To: Excel Construction Services, LLC, 13740 N Hwy 183, Suite No. K-2, Austin, TX 78750 (Contractor) You are hereby requested to comply with the following changes from the Contract Plans and Specifications: ... { { {:•} } Yf :•} :•{Y:Y}:•}} }.•:•:{•}:Y}} } } } }:{•r}:•.•: 4.: 4.0tir:•. { {•: r:.• ....V•::•Y.M. d}L{{•.•.r eN. }X.:•.' '}. :•:•titi:::• }: Y.}Y{.}}}.{{4% Description of Changes 1.0 Change Proposal Request No. 1 1.1 Replace Existing 400 A Disconnect 2.0 Change Proposal Request No. 3 2.1 Coat Outside Ring Under Tank 3.0 Change Proposal Request No. 4 3.1 Deduct to Eliminate Interior Tank Ladder 4.0 Change Proposal Request No. 5 4.1 Additional Conduit to Pumps 5.0 Change Proposal Request No. 6 5.1 Rewire Chlorine Building 6.0 Change Proposal Request No. 7 6.1 Changes to Casing Flanges 7.0 Change Proposal Request No. 8 7.1 Chlorine Injection Line TOTAL: Decrease $3,628.00 $3,628.00 Increase $1,741.10 $1,620.00 $3,738.00 $1,438.00 $1,169.00 $2,579.00 $12,285.10 JUSTIFICATION: Various change proposal requests that have been approved since commencement of construction activities. @,Yfl-01- OIQ - 10 ( P:\City of Round Rock\Westinghouse Road Tank & Well Improvements\Change Orders\Change Order No. 1 (rev 5.24.2007).xls CITY OF ROUND ROCK Date: Sheet: 2 of 2 CONTRACT CHANGE ORDER NO. 1 ORIGINAL CONTRACT AMOUNT: Dollars:$ 540,000.00 CONTRACT AMENDMENT (C.A.) AMOUNTS: Dollars:$ 0.00 THIS CHANGE ORDER (C.O.) AMOUNT. PREVIOUS CHANGE ORDER AMOUNT: CHANGE ORDERS TO -DATE AMOUNT: TOTAL CONTRACT PLUS C.O.s AND C.A.s TOTAL PERCENT CHANGE: Dollars:$ 8,657.10 Dollars:$ 0.00 Dollars:$ 8,657.10 Dollars:$ 548.657.10 PERCENT: 1.60% This document wi becom - a supplement to the contract and all provisions will apply hereto: //.41..f. P:\City of Round Rock\Westinghouse Road Tank & Well Improvements\Change Orders Change Order No. 1 (rev 5.24.2007).xls DATE: June 4, 2007 SUBJECT: City Manager Approval, June 8, 2007 ITEM: Action authorizing the City Manager to execute Change Order No. 1 with Excel Construction Services, L.L.C., Inc. for the Westinghouse Tank Rehabilitation project. Department: Water and Wastewater Utilities Staff Person: Michael Thane, P.E., Director of Utilities Justification: Several small adjustments have been made to the scope of work for the City's Westinghouse Road 100,000 gallon Water Storage Tank project. These adjustments include various minor electrical wiring modifications, coating under the tank, minor small diameter piping changes, raising the casing on the well pumps, and a deduct for removing the interior ladder. This Change Order No. 1 adds up to a net increase to the contract amount of $8,657.00 bringing the final contract amount to 548,657.10. This represents a total increase to the original contract amount of 1.60%. Funding: Cost: $8,657.10 Source of funds: Capital Project Funds (Self -Financed Utility) Outside Resources: S.D. Kallman, Inc. (Engineering Consultant) Background Information: The City's Westinghouse Road 100,000 gallon Water Storage Tank had developed a tilt to the East. The city has rehabilitated the ground storage tank, corrected the foundation problem and replaced the two ground water well pumps at the site. The work brought the site up to TCEQ standards and will optimize the working condition and output of this groundwater producing site. The two well pumps and motors were replaced and the tank has been re -leveled and painted inside and out. Additionally, new well pumps and motors have been installed. Public Comment: NA