Loading...
CM-07-06-109STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: Kasberg, Patrick & Associates, L.L.P. ("Engineer") ADDRESS: One South Main, Temple, Texas 76501 PROJECT: Austin & Liberty Avenue Improvements This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Kasberg, Patrick & Associates, L.L.P., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 28th day of April, 2005 for the Austin & Liberty Avenue Improvements in the amount of $113,785.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on the 10th day of November, 2005 to modify the provisions for the scope of services, to increase the compensation by $200,700.00 to a total of $314,485.00, to extend the Contract, and to modify the provision for notices to proceed; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services, to increase the compensation by $33,000.00 to a total of 347,485.00, and to change the City's Designated Representative for purposes of this Contract and to change the Engineer's Designated Representative for purposes of this Contract; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $33,000.00 the lump sum amount payable under the Contract for a total of $347,485.00, as shown by the attached Addendum to Exhibit D. Supplemental Contract#2 Rev.07/06/06 Kasberg-austinliberty; STI3ATLIB; 116811 84275 0199.0061 Cnt-oq- oc0-toq 1 III. Article 8. Project Team shall be amended to read as follows: City's Designated Representative for purposes of this Contract is as follows: William J. Dobrowolski III PE CM Senior Engineer 2800 Enterprise Drive Round Rock, Texas 78664 Office Telephone (512) 218-6601 Fax Telephone (512 218-5563 Email Address wdobrowolski@axound-rock.tx.us City's Designated Representative shall be authorized to act on City's behalf with respect to this Contract. City or City's Designated Representative shall render decisions in a timely manner pertaining to documents submitted by Engineer in order to avoid unreasonable delay in the orderly and sequential progress of Engineering Services. Engineer's Designated Representative for purposes of this Contract is as follows: Alvin R. Sutton III, P.E. Project Engineer One South Main Temple, TX 76501 Telephone Number (254) 773-3731 Fax Number (254) 773-6667 Email Address tsuttonc kpaengineers.com IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract #2 Rev.07Po6/06 Kasbmg-austinliberty; ST13ATLIB; 116811 84275 0199.0061 2 KASBERG, PATRICK & ASSOCIATES, L.L.P. By: Date gels- Artsr_ZAvAadr- CITY OF ROUND ROCK APROVED AS TO FORM: Bv: Date Jitmes� Nu t R ewl er c)r 1,U112_, aa, a bO`7 Steph', n L. Sheets, City Attorney Supplemental Contract#2 Rev.07/06/06 Kasberg-austinliberty; ST13ATLIB; 116811 84275 0199.0061 3 ADDENDUM TO EXHIBIT B Engineering Services The following is a list of services that will be performed by Kasberg, Patrick & Associates, LP as part of a Contract Amendment to the original Austin & Liberty Avenue Improvements Contract for the Final Engineering Design of Austin Avenue Utilities from N. Nelson Street east to Pecan Lane and Liberty Avenue Roadway, Drainage & Utilities Improvements from N. Nelson Street east to the dead end of Liberty Avenue: 1. Determine final horizontal and vertical roadway alignment for Liberty Ave. from N. Nelson Street east to the dead end of Liberty Ave. 2. Determine final street cross sections for the proposed Liberty Ave, extension. 3. Determine final horizontal and vertical alignment for the proposed 4 -foot sidewalk along the proposed Liberty Ave. extension. 4. Determine final horizontal and vertical alignment for replacement of the existing water lines located within the right-of-way of the proposed Liberty Ave. extension and for the proposed Austin Ave, utilities extension from N. Nelson St east to Pecan Lane. This will include detailing connections to existing water line and detailing connections to existing water meters. 5. Determine final horizontal and vertical alignment for replacement of the existing wastewater lines for the Austin Ave. utilities extension from N. Nelson St east to Pecan Lane. This will include detailing connections to existing wastewater manholes and detailing connections to existing wastewater services. 6. Complete final storm water conveyance for the Liberty Ave. extension. 7. Determine final horizontal and vertical alignment for the storm sewer lines as well as curb inlets and culverts based on the final storm water conveyance for the Liberty Ave. Extension. 8. Provide telephone, cable fiber optic, electrical and gas utility entities with construction plans showing horizontal and vertical alignment in order that they will be able to relocate existing utilities outside the limits of construction. 9. Develop final opinions of probable costs for the Liberty Ave. Extension and Austin Ave, Utilities Extension and incorporate them with the current Austin & Liberty Ave. Improvements Project. 10. Amend the Contract Documents to reflect the proposed Liberty Ave. Extension and Austin Ave. Utilities Extension. 11. TCEQ Recharge & Transition Zone Exception request approval. 12. SWPPP Plans & Program. 13. Submit plans to TDLR for review & approval. 14. Meet with the City of Round Rock Staff to review the Final Design Engineering Plans and the Contract Documents and Technical Specifications and receive input on the plans. Meetings shall be phased with the City of Round Rock Staff. 15. Incorporate changes or revisions as a result of review comments made by the City of Round Rock Staff. 16. Deliver ten (10) copies of the Final Design Engineering Plans and Contract Documents and Technical Specifications to the City of Round Rock. ADDENDUM TO EXHIBIT C Work Schedule The changes to the Work Schedule for this project are as follows: ti 11 g i 0 r w ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: EXHIBIT 1) FEE SCHEDULE The following is a fee schedule for tasks to complete for the Contract Amendment to the original Austin & Liberty Avenue Improvements Contract for the Final Engineering Design of Austin Avenue Utilities from V. Nelson Street east to Pecan Lane and Liberty Avenue Roadway, Drainage & Utilities Improvements from N. Nelson Street east to the dead end of Liberty Avenue: 1. Horizontal and vertical alignment for Austin Ave. utilities $ 7,000.00 2. Horizontal and vertical alignment for Liberty Ave. utilities $ 4,000.00 3. Horizontal and vertical roadway alignment for Liberty Ave. with cross sections. $ 10,000.00 4. Horizontal and vertical alignment for Liberty Ave. storm sewer $ 3,000.00 5. Horizontal and vertical sidewalk alignment for Liberty Ave. $ 3,000.00 6, Coordination with existing dry utilities $ 1,000.00 7. Amend final opinion of probable cost $ 1,000.00 8. Amend the Contract Documents and Technical Specification Book to reflect the proposed changes. $ 1,000.00 9. Amend the existing construction drawings to reflect the proposed Liberty Ave, Extension project and the proposed Austin Ave. Utility Extension project. $ 3,000.00 TOTAL $ 33,000.00 DATE: June 18, 2007 SUBJECT: City Manager - June 22, 2007 ITEM: Action authorizing the City Manager to execute Supplemental Contract #2 for Professional Services Contract with Kasberg, Patrick, and Associates, LLP for Austin and Liberty Avenue Improvements. Department: Engineering & Development Services Staff Person: Danny Haiden, P.E., City Engineer Justification: Supplemental Contract #2 broadens the scope to include needed infrastructure improvements on the eastside of this project. Supplemental Contract #2 will increase the total amount of compensation of this contract to $346,785.00. Funding: Cost: $33,000.00 Source of funds: 2001 GO Bonds (2nd Issuance) Outside Resources: Kasberg, Patrick, and Associates, LLP Background Information: Supplemental Contract #2 increases the scope of this project to include water improvements on Austin Avenue, and water, wastewater, street, and drainage improvements on Liberty Avenue east of Nelson Street. The condition of these City owned infrastructure units has deteriorated greatly in the last few months. Public Comment: NA Blue Sheet Format Updated 01/20/04