Loading...
CM-07-07-170ROUND ROCK POLICE FACILITY CONSTRUCTION CHANGE ORDER Project: Round Rodc. Police Ferrety Address: 3001 Tekbs Drive Round Rodc, Texas To: FT Woods Construction 1988 South Austin Avenue Georgetown, Texas 78626 (Contractor) The Contract is changed as tallowy: Change Order No.: 2 Initiation Date: 7/5/2007 Contract For: General Construction Contract Date: 2/22/2007 (28) Change firewall studs to 20 gauge per building inspections department Add (25) Mechanical work as required for duct modification room./ 282 Add 8,879.65 953.57 Total The odginal Contract Sum was:.. ............... ........... .......... .. Net chow by previous authorized Change Orders • The Contract Sum prior to this Change Order was: The Contract Sum will be increased by this Change Order The new Contract Sum inducting this Change Order wIN be. The Contract time we be changed by ( )days: The Date of Substantial Completion as of the date of this Change Order therefore is: 9833.22 s 10,864,000.00 20,920.75 $ 10,904.920.75 9,833.22 $ 10,914,753.97 FT Woods Construction aro! onimaor Round Rock c 12/4/07 5000 Quorum Drive, Suite 600 1986 South Austin Avenue 221 Ent Main Street Addams Addles* Address Georgetown\ Texas 78628 Round Rock Texas 78884 S.C. Inman, IV James R. Nuse, P.E Date //1010/ Mitiel/13* Dat. 41-01- 110 Change Request 1 To Gary Beeman Beirddey Sargeant 5000 Ousrum Suite 800 Dalas.1X 75240 Ph: 972-060-9970 Desalptlon: Raid Rock inspection Deparknerht Additions P.O gat 122 Geohpebtwh.7X 7x427 Ph: 512430-2 807 Number 28 Dalt 6/21/07 Jobs 2007-010-001 Round Rock Poke Deparbnent Phone: (512)238-0930 We are pleased lo offer the blowing 'melodic's and pricing to make the following changes: Per the request of the Round Rods Inspection Department. charge kraal studs to 20 gauge and add cold roled c hamel slithers. The total amohaht to provide tis work le (Pleasereferk attached sheet for details.) The schedule b not affected by this dharge. :11 you have any questions. please contact me at 512930.2807_ Submitted by: SC Inman F IWOODS ca Approved by: Date: Change Request 28 Price Breakdown Continuation Sheet Description: Round Rads Inspection Department Additions P.O. Dalt 122 GeoOebwn.1X 710$27 Ph: 512.830,2307 Gypsum Board system - Studs crlypenen Roam Sysbm c ha labor Moeda( Equipment Subcontract Other Pito 6005 00 54.895.00 $2,565.00 s0o Piled Management Avid Management Maumee Bond OMednsad Prost SAWS* 57.460.O0 $60.00 $60.00 $7.580.00 0.61% 54624 $7.626.24 0.81% $81.77 $7.688.01 10.00% 5768.60 58.456.81 5.00% 5422.84 Total: $6,679.645 June 13, 2007 To: S.C. Inman F.T. Woods, CSI. P.O. Box 122 Georgetown, TX. 78627 Fax 930-3748 From: Tim Smith Central Texas Drywall P.O. Box 849 Round Rock, TX. 78680 Phone 341-8101 Re: Round Rock Police Department -444- 14re =Change firewall studs to 20 gauge per Round Rodd Inspection Dept. :Add' $4,895.00 Please call with any questions - Thank you, P.O. Box 849 • Round Rock, Texas 78680-0849 • (512) 341-8101 • FAX 341-8105 TEXAS DRYwut June 13, 2007 To: S.C. Inman F.T. Woods, CSI. P.O. Box 122 Georgetown, TX. 78627 Fax 930-3748 From: Tim Smith Central .Texas Drywall P.O. Box 849 Round Rock, TX. 78680 Phone 341-8101 Re: Round Rock Police Department Add cold rolled channel stiffener at all flrewakis - Add $2,565.00 Please call with any questions - Thank you, -Tim Smith P.O. Box 849 • Round Rock. Texas 7 • (512) 3414101 • FAX 341-8105 ToGary Beeman Bcirddey Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-060-9970 Description:Change Request 1 Architect's Supplemental Metuchen hen 1n4 P.O. Bac 122 Georges:km TX 75627 Ph : 512-030-2807 Member: 25 Dal= 625/07 Job: 2007-010-001 Rand Rods Police Department Phone: (512)238-0930 We are pleased to offer the following spsci'c.6 rs and pricing b make the Mating change.. Supplemental Instruction14 - Mechanical ravleions b aegis negative pmsare in Room 282. The total amount b provide 9ris work is moi' 7 Meese infer b attached sheat for details.) The schedule is not affected by this change. If you have any questions, please canted me at 512.930.2607 Subnilied by SC Inman Appinwd by: Ilene: Chroge Request 25 Price Breakdown Continuation Sheet Supplemental Instruction f4 P.O. Boer 122 Geollisiorm. TX 78827 Ph : 512430.2807 Description HVAC Labor Material Equipment Subcontract Other 5694.00 Price 5694.00 Subbtat Project Management Field Management insurance 5814.00 0.61% Bond $81897 0.81% Overhead $825.600 10.00% Pmit $904.16 5.00% Total: $11114.00 560.00 560.00 54.97 56.63 $82.56 $45.41 $963.67 Page 2of2 • A CO llinooioainale Ltd. Proposed Change Order To: FT Woods Coostroetlm POBox 122 Geastrtown, Tags 78627 Amon SC Inman Pllooc (512) 930-267 For 014 930 3469 C C ReE No.: At& Ret: No.: Data MRCO P.C, No,: P.C. Desaiptica Project PROM No.: PO&K 80�058 9200WW.ipndCir. 014 MOO Amok Tins 78758 Phase X837-2017 Fec 037.3112 TACtA58 8C - M11472 Josie 1, 2107 3 Sopplesantal Instruction 14 207403 Remail Beek Potloe Facility 3001 Tadbs Drive Round lack Tris 78627 We propose to Simi& di the labor awl assioisl required to install the HVAC accordance with the following deaoe pitta: Supplemental Ins04 dated 7 Mechanical work as required for duct inodfication in Room #282. and/or Plumbing dingo co the above project in 10fusitps Alloclod Tall cost ',proposed change to eadract Change to tanpistitndate of contract from date dreams ID" 690 i Oor pricing redacts changes Only as by abope description. AN and gedifications cf the aciiinal contract rem in the that X00 is to dump if not released wait thirty (30) d or if trades mooed with father m4&odoroarnaliiisa ion. Please, sift ars is mridng if we are to proceed with tie proposed change, aepiedlrMAasapsyreety„irada a PAW 1031 11111 111.1111111111114“51140110/4 DMTE: July 9, 2007 QCT: City Manager Approval - July 13, 2007 ITEM: Action requesting City Manager to approve Change Order Number 2 with FT Woods Construction for the Police Department Project at 3001 Tellabs Drive in the amount of $9,833.22. nellidMiet Engineering and Development Services arenas Tom Word, Chief of P.W. Operations Larry Madsen, Construction Manager Upon site review the building inspections department required that firewall studs be upgraded from the specified studs on the plans to 20 gauge steel stud plus metal bridging at all firewall walls(cost $8,879.65). Plan modifications were also made to the HVAC ductwork in room #282 (cost $953.57). hafts Cost: $9,833.22 Source of funds: 2002 GO Bonds and General Self Finance Corporation Brinkley Sargent Architects Badesudidandias N/A N/A