CM-07-07-170ROUND ROCK POLICE FACILITY
CONSTRUCTION CHANGE ORDER
Project: Round Rodc. Police Ferrety
Address: 3001 Tekbs Drive
Round Rodc, Texas
To: FT Woods Construction
1988 South Austin Avenue
Georgetown, Texas 78626
(Contractor)
The Contract is changed as tallowy:
Change Order No.: 2
Initiation Date: 7/5/2007
Contract For: General Construction
Contract Date: 2/22/2007
(28) Change firewall studs to 20 gauge per building inspections department Add
(25) Mechanical work as required for duct modification room./ 282 Add
8,879.65
953.57
Total
The odginal Contract Sum was:.. ............... ........... ..........
..
Net chow by previous authorized Change Orders •
The Contract Sum prior to this Change Order was:
The Contract Sum will be increased by this Change Order
The new Contract Sum inducting this Change Order wIN be.
The Contract time we be changed by ( )days:
The Date of Substantial Completion as of the date of this Change Order therefore is:
9833.22
s 10,864,000.00
20,920.75
$ 10,904.920.75
9,833.22
$ 10,914,753.97
FT Woods Construction aro!
onimaor Round Rock
c
12/4/07
5000 Quorum Drive, Suite 600 1986 South Austin Avenue 221 Ent Main Street
Addams Addles* Address
Georgetown\ Texas 78628 Round Rock Texas 78884
S.C. Inman, IV James R. Nuse, P.E
Date //1010/ Mitiel/13*
Dat.
41-01- 110
Change Request 1
To Gary Beeman
Beirddey Sargeant
5000 Ousrum Suite 800
Dalas.1X 75240
Ph: 972-060-9970
Desalptlon: Raid Rock inspection Deparknerht Additions
P.O gat 122
Geohpebtwh.7X 7x427
Ph: 512430-2 807
Number 28
Dalt 6/21/07
Jobs 2007-010-001 Round Rock Poke Deparbnent
Phone: (512)238-0930
We are pleased lo offer the blowing 'melodic's and pricing to make the following changes:
Per the request of the Round Rods Inspection Department. charge kraal studs to 20 gauge and add cold roled c hamel slithers.
The total amohaht to provide tis work le
(Pleasereferk attached sheet for details.)
The schedule b not affected by this dharge.
:11 you have any questions. please contact me at 512930.2807_
Submitted by: SC Inman
F IWOODS
ca
Approved by:
Date:
Change Request 28 Price Breakdown
Continuation Sheet
Description: Round Rads Inspection Department Additions
P.O. Dalt 122
GeoOebwn.1X 710$27
Ph: 512.830,2307
Gypsum Board system - Studs
crlypenen Roam Sysbm c ha
labor Moeda( Equipment Subcontract Other Pito
6005 00 54.895.00
$2,565.00 s0o
Piled Management
Avid Management
Maumee
Bond
OMednsad
Prost
SAWS*
57.460.O0
$60.00
$60.00
$7.580.00 0.61% 54624
$7.626.24 0.81% $81.77
$7.688.01 10.00% 5768.60
58.456.81 5.00% 5422.84
Total: $6,679.645
June 13, 2007
To: S.C. Inman
F.T. Woods, CSI.
P.O. Box 122
Georgetown, TX. 78627
Fax 930-3748
From: Tim Smith
Central Texas Drywall
P.O. Box 849
Round Rock, TX. 78680
Phone 341-8101
Re: Round Rock Police Department
-444- 14re
=Change firewall studs to 20 gauge per Round Rodd Inspection Dept.
:Add' $4,895.00
Please call with any questions - Thank you,
P.O. Box 849 • Round Rock, Texas 78680-0849 • (512) 341-8101 • FAX 341-8105
TEXAS DRYwut
June 13, 2007
To: S.C. Inman
F.T. Woods, CSI.
P.O. Box 122
Georgetown, TX. 78627
Fax 930-3748
From: Tim Smith
Central .Texas Drywall
P.O. Box 849
Round Rock, TX. 78680
Phone 341-8101
Re: Round Rock Police Department
Add cold rolled channel stiffener at all flrewakis - Add $2,565.00
Please call with any questions - Thank you,
-Tim Smith
P.O. Box 849 • Round Rock. Texas 7 • (512) 3414101 • FAX 341-8105
ToGary Beeman
Bcirddey Sargeant
5000 Quorum Suite 600
Dallas, TX 75240
Ph: 972-060-9970
Description:Change Request 1
Architect's Supplemental Metuchen hen 1n4
P.O. Bac 122
Georges:km TX 75627
Ph : 512-030-2807
Member: 25
Dal= 625/07
Job: 2007-010-001 Rand Rods Police Department
Phone: (512)238-0930
We are pleased to offer the following spsci'c.6 rs and pricing b make the Mating change..
Supplemental Instruction14 - Mechanical ravleions b aegis negative pmsare in Room 282.
The total amount b provide 9ris work is moi' 7
Meese infer b attached sheat for details.)
The schedule is not affected by this change.
If you have any questions, please canted me at 512.930.2607
Subnilied by SC Inman
Appinwd by:
Ilene:
Chroge Request 25 Price Breakdown
Continuation Sheet
Supplemental Instruction f4
P.O. Boer 122
Geollisiorm. TX 78827
Ph : 512430.2807
Description
HVAC
Labor
Material Equipment Subcontract Other
5694.00
Price
5694.00
Subbtat
Project Management
Field Management
insurance 5814.00 0.61%
Bond $81897 0.81%
Overhead $825.600 10.00%
Pmit $904.16 5.00%
Total:
$11114.00
560.00
560.00
54.97
56.63
$82.56
$45.41
$963.67
Page 2of2
•
A CO
llinooioainale Ltd.
Proposed Change Order
To: FT Woods Coostroetlm
POBox 122
Geastrtown, Tags 78627
Amon SC Inman
Pllooc (512) 930-267
For 014 930 3469
C C ReE No.:
At& Ret: No.:
Data
MRCO P.C, No,:
P.C. Desaiptica
Project
PROM
No.:
PO&K 80�058
9200WW.ipndCir. 014 MOO
Amok Tins 78758
Phase X837-2017
Fec 037.3112
TACtA58 8C - M11472
Josie 1, 2107
3
Sopplesantal Instruction 14
207403
Remail Beek Potloe Facility
3001 Tadbs Drive
Round lack Tris 78627
We propose to Simi& di the labor awl assioisl required to install the HVAC
accordance with the following deaoe pitta:
Supplemental Ins04 dated 7
Mechanical work as required for duct inodfication in Room #282.
and/or Plumbing dingo co the above project in
10fusitps Alloclod
Tall cost ',proposed change to eadract
Change to tanpistitndate of contract from date dreams
ID"
690
i
Oor pricing redacts changes Only as by abope description. AN and gedifications cf the aciiinal contract
rem in the that X00 is to dump if not released wait thirty (30) d or if trades mooed with father
m4&odoroarnaliiisa ion.
Please, sift ars is mridng if we are to proceed with tie proposed change,
aepiedlrMAasapsyreety„irada a PAW 1031 11111 111.1111111111114“51140110/4
DMTE: July 9, 2007
QCT: City Manager Approval - July 13, 2007
ITEM: Action requesting City Manager to approve Change Order Number 2
with FT Woods Construction for the Police Department Project at
3001 Tellabs Drive in the amount of $9,833.22.
nellidMiet Engineering and Development Services
arenas Tom Word, Chief of P.W. Operations
Larry Madsen, Construction Manager
Upon site review the building inspections department required that firewall studs be
upgraded from the specified studs on the plans to 20 gauge steel stud plus metal bridging
at all firewall walls(cost $8,879.65). Plan modifications were also made to the HVAC
ductwork in room #282 (cost $953.57).
hafts
Cost: $9,833.22
Source of funds: 2002 GO Bonds and General Self Finance Corporation
Brinkley Sargent Architects
Badesudidandias
N/A
N/A