Loading...
CM-07-07-17107-06- 07 11:13 FROM-VILLAbt ur rtniwattrs u1u-ouj 411.W 1 1 \TI 1JI W\ 1 1..•1 1 ..101J. 1 ...1 I V Chats Order Na. 2 Prosect Name: *006.2(N Tank RAhabNiUitiO11 Comments ',reject 1 1941.... VJ Project Owner: City of Round Rook 212 Commerce Cow, Round Rock, TX 751164 • Prosct Contractor: MK Painting, Inc. 4157 Seventh Wyandotte, MI 48192 Date of lseuanos: July 5, 2007 Contract Fsbnaary Dote of Notice to Proceed: Febraany 09, 2007 Orygbraf Compie*on Caw August 08, 2107 Contrsa Petlod 180 kayoed to mod tto Conti** +fid *abase es :.. CHANGE IN CPR * ITEM ANDOMOMAIZIONGE5 CONrRA9T PINcl Oid its tuutnbet — dwelt— nelldetl 000 Reduce bid Rem number 8 —ssfeldnaw match ,owl -=3,400 ----MOO ., -IN COSTPA • TIME -01 DMterence Net 47,400 Summary: It is weed 1e *wdity dm Contrast referred to Contract Price pita to this Change Order $ 44&1:00 Not memo. (decteesse) of this Change Order Revised cant e t notice with all rrpprowd Menge Were above es folknes: Contract This prior to this Change Order MO • Adam* 0,42197 Net Inose (decrease) er this Chinch) Order NUMB d 4 -a RoNood Contract T'Me with ell approved Change dent Seed - All. 11007 • The chews included in this Change Order en to be accomplished in sceordsnoe with the Isms, supulmons of the ort .;u. Gwent yet Included thereby. Contractor b Jahn MK Mem leo. by (Utilities Adrnln$t st on): for Owner oA (bb meet pe NIA Distribution: 0 Oi-ii- 07-D -1-71 HOT lateeetton Stereos'. tea er D • Comer/or Office Date: July 5, 2007 Owe July 5, 2007 Dote: 7-13.1 Dew 7—C G V" O Field CI oms. DATE: July 9, 2007 City Manager Approval - July 13, 2007 ITEM: Consider a resolution authorizing the City Manager to approve Change Order No. 2 with MK Painting for the 2006-2008 Tank Rehabilitation Project. Water and Wastewater Utilities Michael Thane, P.E., Director of Utilities The MK Painting construction contract is for the rehabilitation of the Bowman and Vista Heights Tanks. The rehabilitation cost for both tanks was originally $430,650.00 induding $12,000 for painting a logo on the Vista Heights tank on behalf of Texas State University. Change order number 1 reduced the project cost by this amount resulting in a total of $418,650. The actual quantities for the project will now be reduced because of lower than expected welding costs by $7,400. MK Painting's contract will now be for $411,250. Baas Cost: ($7,400) Source of funds: Capital Project Funds (Self -Financed Utility) all1u021; John H. Konzen - HOT Inspection Services The Texas Commission for Environmental Quality (TCEQ) requires rehabilitation for water storage tanks in compliance with state rules which indudes annual inspections of all water storage tanks within our distribution system. With the information from inspections we schedule each water tank in the city's system for repairs and painting, based on its present condition. In general, steel tanks need re -painting about 15 years. The Bowman tank and Vista Heights tank were previously painted in 1989 and 1985, respectively. 111/111Jt N/A