Chats Order Na. 2
Prosect Name: *006.2(N Tank RAhabNiUitiO11
Comments ',reject
1 1941.... VJ
Project Owner: City of Round Rook
212 Commerce Cow, Round Rock, TX 751164 •
Prosct Contractor: MK Painting, Inc.
4157 Seventh
Wyandotte, MI 48192
Date of lseuanos: July 5, 2007
Contract
Fsbnaary
Dote of Notice to Proceed:
Febraany 09, 2007
Orygbraf Compie*on Caw
August 08, 2107
Contrsa Petlod 180
kayoed to mod tto Conti** +fid *abase es :..
CHANGE IN
CPR * ITEM ANDOMOMAIZIONGE5 CONrRA9T PINcl
Oid its tuutnbet — dwelt— nelldetl 000
Reduce bid Rem number 8 —ssfeldnaw match ,owl -=3,400
----MOO
., -IN
COSTPA • TIME
-01
DMterence Net 47,400
Summary: It is weed 1e *wdity dm Contrast referred to
Contract Price pita to this Change Order
$ 44&1:00
Not memo. (decteesse) of this Change Order
Revised cant e t notice with all rrpprowd Menge Were
above es folknes:
Contract This prior to this Change Order
MO • Adam* 0,42197
Net Inose (decrease) er this Chinch) Order
NUMB d 4 -a
RoNood Contract T'Me with ell approved Change dent
Seed - All. 11007
•
The chews included in this Change Order en to be accomplished in sceordsnoe with the Isms, supulmons
of the ort .;u. Gwent yet Included thereby.
Contractor b Jahn
MK Mem leo.
by (Utilities Adrnln$t st on):
for Owner oA (bb
meet
pe NIA
Distribution: 0
Oi-ii- 07-D -1-71
HOT lateeetton Stereos'. tea
er D • Comer/or
Office
Date:
July 5, 2007
Owe
July 5, 2007
Dote:
7-13.1
Dew
7—C G V"
O Field CI oms.
DATE: July 9, 2007
City Manager Approval - July 13, 2007
ITEM: Consider a resolution authorizing the City Manager to approve Change
Order No. 2 with MK Painting for the 2006-2008 Tank Rehabilitation
Project.
Water and Wastewater Utilities
Michael Thane, P.E., Director of Utilities
The MK Painting construction contract is for the rehabilitation of the Bowman and Vista
Heights Tanks. The rehabilitation cost for both tanks was originally $430,650.00 induding
$12,000 for painting a logo on the Vista Heights tank on behalf of Texas State University.
Change order number 1 reduced the project cost by this amount resulting in a total of
$418,650. The actual quantities for the project will now be reduced because of lower than
expected welding costs by $7,400. MK Painting's contract will now be for $411,250.
Baas
Cost: ($7,400)
Source of funds: Capital Project Funds (Self -Financed Utility)
all1u021;
John H. Konzen - HOT Inspection Services
The Texas Commission for Environmental Quality (TCEQ) requires rehabilitation for water
storage tanks in compliance with state rules which indudes annual inspections of all water
storage tanks within our distribution system. With the information from inspections we
schedule each water tank in the city's system for repairs and painting, based on its present
condition. In general, steel tanks need re -painting about 15 years. The Bowman tank and
Vista Heights tank were previously painted in 1989 and 1985, respectively.
111/111Jt N/A