CM-07-07-174CITY OF ROUND ROCK PUBLIC WORKS
CONSTRUCTION CHANGE ORDER
Project: Rock N' River Aquatic Center
Address: 3300 Pain Valley Blvd
Round Rock Teas
To: Chasco Constructors
P.O. Box 1057
Round Rock, Teves 78680
(Contractor)
The Contract is changed as follows:
Change Order No.: 7
Initiation Date: 7/1312007
Contract For: Rock N River
Contract Data: 102005
Revised Ticket Window - Added microphonehmeaker system Add $ 4,563.00
Summary
The original (Contract Sura) was $ 2,898,520.00
Net change by Previous authorized Change Orders* $ 31,178.00
The (Contract Sum) prior b anis Change Order war $ 2,727,868.00
The (Contract earn) will be (increased) (unchanged) by this Change Order $ 4583.00
The rarer (Contract Sum) i nclydtrig Ns Change Order nil be: $ 2,732,281.00
Th. Contract time wN be (unchanged) by ( )drys:
Th. Date of S4tatw iai ComKleIon as of the dab of this Chage Order therefore is:
Changes Included in the summary above (do) (do not) include modipcalime %which have been authorized by Construction
Change •(s).
Chem Con:studars Cil% of Round Rock
Cmre.nor
Dab
Jim Freemen
l3 4a
C W vChebiebilMmt4ronm
C- o1 -o1- 1'14'
Qih-91( 2"
Chasco Contracting
Protect No: 05235
Est. No: CP -010
Description: Change tidcet window at Owner's request
Rock'n River Family Aquatic Center
Pricing Sheet
Dais: 26 January 2007
Prepared b1r: Jkn Freeman
Menem AWN= Summer!
OwrMed
SANT= Mle iWs (only)
SUBTOTAL
Fee
SUBTOTAL
Nrsuence
P&P Band
GRAND TOTAL
10.00%
0.00%
5.00%
125%
1.10%
$386
50
,246
T$212
$4'
58
$56
$49
,563
°' i.••'
yam,
:
;;:3<::;:;:;:::�:;:;:�:�:�
':::::
�•
�EtMiliYflr14.;:i
1
Charge Window
1
LS
0.00
$0
$0
3860.00
$3,860
$3,860
(See Attached Sub Proposal)
0.00
$0
$0
60
50
SUBTOTALS
$0
$0
$3,860
$3,860
Menem AWN= Summer!
OwrMed
SANT= Mle iWs (only)
SUBTOTAL
Fee
SUBTOTAL
Nrsuence
P&P Band
GRAND TOTAL
10.00%
0.00%
5.00%
125%
1.10%
$386
50
,246
T$212
$4'
58
$56
$49
,563
R.O. [727
V-113-
F.W. [7i "]
68
1VERIY'
DLO
1RiFY/
VERIFY1V
D
4
68
CLEARANCE
1
ELEVATION- A
REQ'D THUS = 1
ARCH. REF. _ -
SYSTEM = FG1000 1 3/4' X 4'
SOTREFRONT SYSTEM
0 1/4° GEAR TEMPERED GLASS
HARDWARE:
2 -CRI. NQRCON 1188I -GLASS TWO-WAY
ELECTRONIC COAUNICMOR
MODEL IT U I D 12V DC SFAIV ARD
1 -CRL H0RtZOKTAL SUDINC SERVICE WINDOW
MODEL `+14A
SATiN ; , 14 3. 1
MUM
ROCK N RIVER
ROUND ROCK, TEXAS
FLOPS LA
A 0mv1 on of Hamm Iwo..
1604 MST 2nd S `PA. 80X 803
TAY OOR. 71111-74
pecarr N0
I
01/07
Nam
ail _No.
RR -800
800
SOW
Proposal
Page 1 of 1 Page
Compete
Taylor (512) 3527618
v vey
C.GLASS COMPANY
A ONISION Or rl OYOCO,
Gds & Aluminum Fronts
1604 West Second Skeet,
TAYLOR, TEXAS
• Austin: (512) 365-2016
w V
..c
• Sales & Service
P.O. Boot 803
76574
• FAX: (512) 3527243
,a,10
CHASCO CONSTRUCTION
RCM
DARE
1/15/07
„abler
PO BOX 1057
doe MME
ROCK'N RIVER
arm OrIANNIDZPODIE
ROUND ROCK, TX
doeLOCATON
ROUND ROCK, TX
APOIRECT
OM OF PLANA
doePHOfE
glass transom, two
to ICW — 3 as shown
For the Sum of
Materials
Window
bivalves the building
horizontal sliding windows, W glass
on info sent ki email 11/21106.
83,860.00
envelops Floyd's Glass Company
that
and two
WE r Y SUBMIT SPECIFICATIONS AND EST TES FOR
Removal of 1 existing window, with a fixed
microphone and speaker systems equal
ENWE
Protection and Final Cleaning of Installed
Interior Caulking
Laboratory or Field Testing
Bond of Any Type
Addlionsa Insured CG 2010 (11-85) or Equivalent
Sales Tax
Removal of Existing Materials to Access
Since Texas Cods
the energy
doss
entire
not warrant die this gins
TO A MUTUALLY AGREBA#LE
"SUBJIICT
meets cods.
CONTRACT * *
We Propos e hereby to *ankh Mot In aseoulence
with above noodle:aeons, for the sum of
Dolma 1.
mM,dal and — complete
SEE ABOVE
Paymentto be Mars:
CONTRACT TO BE MADE IN TAYLOR WILLIAMSON COUNTY, TEXAS
meds as
ALL PAYMENTS ON THE ABOVE COMPLETED
MONTHLY DRAWS ON COMP'1. ,TW W0RIVOE;UVER D MATERIALS BY 10" OF FOLLOMANG MONTH
M le b be M to fte i ins hilbedzed
noodle Mere as wall eaaeglts
O Wil Arq lm
wabrMrs aMldler aaserWso maim sibm *test***
sea aims apsa limearrs Invoniag ears cost i be emended ally open wean
dm. Int nds- N
Spencer 11Yindrreon
proposal ma r be
by us if not accepted within 30' days.
orders. and all Seams an ardrs OW and OM soli Notes: This
aJd.i blibme
or s rear maul.
are Oaf Wilhibarm
_eeawL a1"P" Wass.
eat
mneme. rlsdrue
""a "_
�Feo�aly
Acceptance of Proposal-Thtabaee
apedlailens and conditions : eatery and herby Signature
prtoee, are
You to do the Pigment lee
accepted. soindbodeed wakes aleMsied.
be Own.
Signature
mode as aaMiMd
Oce of Acceptance
DATE: July 16, 2007
SUBJECT: City Manager - July 20, 2007
ITEM: Action authorizing City Manager to approve change order number
seven with Chasco Constructors to replace ticket window at Rock'N
River Aquatic Center.
Department:
Pl il;.
Justification:
Engineering and Development Services
Tom Word, Chief pf P.W. Operations
Larry Madsen, Construction Manager
The entrance ticket window as originally designed and built for the Rock'N River Aquatic
Center has not provided employees and customers an efficient way to communicate or
receive money for entrance into center. Communication is difficult between the employee
and customer. This revised window will provide speakers for communication to customers
and an accessible way to transact business.
Funlna:
Cost: $4,563.00
Source of funds: 2002 GO Bonds
Outside Resources: N/A
Background Information: N/A
Public Comment: N/A