Loading...
CM-07-07-174CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER Project: Rock N' River Aquatic Center Address: 3300 Pain Valley Blvd Round Rock Teas To: Chasco Constructors P.O. Box 1057 Round Rock, Teves 78680 (Contractor) The Contract is changed as follows: Change Order No.: 7 Initiation Date: 7/1312007 Contract For: Rock N River Contract Data: 102005 Revised Ticket Window - Added microphonehmeaker system Add $ 4,563.00 Summary The original (Contract Sura) was $ 2,898,520.00 Net change by Previous authorized Change Orders* $ 31,178.00 The (Contract Sum) prior b anis Change Order war $ 2,727,868.00 The (Contract earn) will be (increased) (unchanged) by this Change Order $ 4583.00 The rarer (Contract Sum) i nclydtrig Ns Change Order nil be: $ 2,732,281.00 Th. Contract time wN be (unchanged) by ( )drys: Th. Date of S4tatw iai ComKleIon as of the dab of this Chage Order therefore is: Changes Included in the summary above (do) (do not) include modipcalime %which have been authorized by Construction Change •(s). Chem Con:studars Cil% of Round Rock Cmre.nor Dab Jim Freemen l3 4a C W vChebiebilMmt4ronm C- o1 -o1- 1'14' Qih-91( 2" Chasco Contracting Protect No: 05235 Est. No: CP -010 Description: Change tidcet window at Owner's request Rock'n River Family Aquatic Center Pricing Sheet Dais: 26 January 2007 Prepared b1r: Jkn Freeman Menem AWN= Summer! OwrMed SANT= Mle iWs (only) SUBTOTAL Fee SUBTOTAL Nrsuence P&P Band GRAND TOTAL 10.00% 0.00% 5.00% 125% 1.10% $386 50 ,246 T$212 $4' 58 $56 $49 ,563 °' i.••' yam, : ;;:3<::;:;:;:::�:;:;:�:�:� '::::: �• �EtMiliYflr14.;:i 1 Charge Window 1 LS 0.00 $0 $0 3860.00 $3,860 $3,860 (See Attached Sub Proposal) 0.00 $0 $0 60 50 SUBTOTALS $0 $0 $3,860 $3,860 Menem AWN= Summer! OwrMed SANT= Mle iWs (only) SUBTOTAL Fee SUBTOTAL Nrsuence P&P Band GRAND TOTAL 10.00% 0.00% 5.00% 125% 1.10% $386 50 ,246 T$212 $4' 58 $56 $49 ,563 R.O. [727 V-113- F.W. [7i "] 68 1VERIY' DLO 1RiFY/ VERIFY1V D 4 68 CLEARANCE 1 ELEVATION- A REQ'D THUS = 1 ARCH. REF. _ - SYSTEM = FG1000 1 3/4' X 4' SOTREFRONT SYSTEM 0 1/4° GEAR TEMPERED GLASS HARDWARE: 2 -CRI. NQRCON 1188I -GLASS TWO-WAY ELECTRONIC COAUNICMOR MODEL IT U I D 12V DC SFAIV ARD 1 -CRL H0RtZOKTAL SUDINC SERVICE WINDOW MODEL `+14A SATiN ; , 14 3. 1 MUM ROCK N RIVER ROUND ROCK, TEXAS FLOPS LA A 0mv1 on of Hamm Iwo.. 1604 MST 2nd S `PA. 80X 803 TAY OOR. 71111-74 pecarr N0 I 01/07 Nam ail _No. RR -800 800 SOW Proposal Page 1 of 1 Page Compete Taylor (512) 3527618 v vey C.GLASS COMPANY A ONISION Or rl OYOCO, Gds & Aluminum Fronts 1604 West Second Skeet, TAYLOR, TEXAS • Austin: (512) 365-2016 w V ..c • Sales & Service P.O. Boot 803 76574 • FAX: (512) 3527243 ,a,10 CHASCO CONSTRUCTION RCM DARE 1/15/07 „abler PO BOX 1057 doe MME ROCK'N RIVER arm OrIANNIDZPODIE ROUND ROCK, TX doeLOCATON ROUND ROCK, TX APOIRECT OM OF PLANA doePHOfE glass transom, two to ICW — 3 as shown For the Sum of Materials Window bivalves the building horizontal sliding windows, W glass on info sent ki email 11/21106. 83,860.00 envelops Floyd's Glass Company that and two WE r Y SUBMIT SPECIFICATIONS AND EST TES FOR Removal of 1 existing window, with a fixed microphone and speaker systems equal ENWE Protection and Final Cleaning of Installed Interior Caulking Laboratory or Field Testing Bond of Any Type Addlionsa Insured CG 2010 (11-85) or Equivalent Sales Tax Removal of Existing Materials to Access Since Texas Cods the energy doss entire not warrant die this gins TO A MUTUALLY AGREBA#LE "SUBJIICT meets cods. CONTRACT * * We Propos e hereby to *ankh Mot In aseoulence with above noodle:aeons, for the sum of Dolma 1. mM,dal and — complete SEE ABOVE Paymentto be Mars: CONTRACT TO BE MADE IN TAYLOR WILLIAMSON COUNTY, TEXAS meds as ALL PAYMENTS ON THE ABOVE COMPLETED MONTHLY DRAWS ON COMP'1. ,TW W0RIVOE;UVER D MATERIALS BY 10" OF FOLLOMANG MONTH M le b be M to fte i ins hilbedzed noodle Mere as wall eaaeglts O Wil Arq lm wabrMrs aMldler aaserWso maim sibm *test*** sea aims apsa limearrs Invoniag ears cost i be emended ally open wean dm. Int nds- N Spencer 11Yindrreon proposal ma r be by us if not accepted within 30' days. orders. and all Seams an ardrs OW and OM soli Notes: This aJd.i blibme or s rear maul. are Oaf Wilhibarm _eeawL a1"P" Wass. eat mneme. rlsdrue ""a "_ �Feo�aly Acceptance of Proposal-Thtabaee apedlailens and conditions : eatery and herby Signature prtoee, are You to do the Pigment lee accepted. soindbodeed wakes aleMsied. be Own. Signature mode as aaMiMd Oce of Acceptance DATE: July 16, 2007 SUBJECT: City Manager - July 20, 2007 ITEM: Action authorizing City Manager to approve change order number seven with Chasco Constructors to replace ticket window at Rock'N River Aquatic Center. Department: Pl il;. Justification: Engineering and Development Services Tom Word, Chief pf P.W. Operations Larry Madsen, Construction Manager The entrance ticket window as originally designed and built for the Rock'N River Aquatic Center has not provided employees and customers an efficient way to communicate or receive money for entrance into center. Communication is difficult between the employee and customer. This revised window will provide speakers for communication to customers and an accessible way to transact business. Funlna: Cost: $4,563.00 Source of funds: 2002 GO Bonds Outside Resources: N/A Background Information: N/A Public Comment: N/A