Loading...
CM-07-07-176Purchase Order City. of Round Rock City ministration 221 E. Main Street Round Rock TX 78664 United States Vendor: 0000040598 Grande Communications Networks, Inc. 401 Carlson Circle San Marcos TX 78666 United States Tax Exempt? N Tax Exempt ID: 1Lins-Sch Item/Description 1- 1 PLACE A 24CT FIBER FROM 212 COMMERCE IN ROUND ROCK TO NEW POLICE STATION ON 611 JEFFERY WAY IN ACCORDANCE WITH ATTACHED COST ESTIMATE. COST NOT TO EXCEED $49481.00, Cable Constriction, Installation and Maintenance (Fiber Optic,ConxnunicatIon,Computer, etc Purchase Order Date Revision NROCK-0000025909 07/13/2007 Dispatch via Prin t Page 1 Payment Terms Freight Tenor Ship Via 30 Days FOBDestination Freight Prepaid Best Way Buyer Phone C BROOKS Ship To: 25ADM Public Works Administration 2008 Enterprise Round Rock TX 78664 United States Currency USD Bill To: Attn: Accounts Payable 221 E. Main Street Round Rock TX 78664 United States Replenishment Option: Standard Mfg ID Quantity UOM 1. 00 LOT Schedule Total Item Total 96218 Total PO Amount PO Price 49,481.00 Extended Amt Due Date 1 49,481.00 09/10/2007 49,481.00 49.481.00 49,481.00 uthorized Signature 7-22frD7 OSP Cost Estimate City of Round Rock New Police Station Lateral SUMMARY OF ESTIMATED COSTS A) Engineering & Construction Mgt. B) Materials C) Make Ready Estimate D) Right of Way E) Building Service Entry F) Construction Labor $2,356 $l 1,951 $3,375 $2,658 $1.118.20 $18,024 PROJECT TOTAL: $39,481 TOTAL ROUTE LENGTH: AVERAGE COST: 1.63 Miles $24,257 Per Mile $ 8,594 Feet 4.59 Per Foot ASSUMPTIONS: 1. This is a cost estimate to place a 24ct fiber from the 212 Commerce Station in Round Rock to the New Police Station at 601 Jeffery Way. There is only one patch panel being accounted for, due to information that there is sufficient room at Jeffery Way to terniinate the 2. The work consists of building a new fiber and strand from 601 Jeffery Way to existing infrastructure and overlashing to 212 Commerce. If TXU does not require a pole change out on Tellabs Dr., then there will not be a need for additional cost to this work. I f they do require a pole change out then we will see an additional increase to this estimate of $10,000. An existing riser will be used from pole line into new PD and EMT constructed inside by developer, to the new Telcom / Data demarc near the rear of the complex. 3. Please allow approximately 30 to 45 days from the date of approval to complete the proposed project. Requested by: Larry Madsen Prepared by: Mark Harkins Approved by: Forward to: Revised Page 1 of 4 Date: July 10, 2007 Date: s A) Engineering & Construction Mgt. Item Description Unit Qty Unit $ Extended 1 Underground Design/PE LS 0 $ 5.00 $ - 2 Aerial Design FT 4,679 $ 0.17 5 797.56 3 Bridge Design FT $ 1.62 $ - 4 Performance Bond LS 1 $ 308.33 $ 308.33 5 Food and Lodging Day $ 250.00 $ - 6 CapEx Labor Day 3 $ 416.67 $ 1,250.00 Sub -Total $ 2,355.89 B) Materials Item Description Unit Oty Unit $ Extended 1 Fiber Optic Cable (288F) FT $ 13.12 5 - 2 Fiber Optic Cable (216F) FT 5 . 9.15 5 3 Fiber Optic Cable (144F) FT $ 6.43 $ - 4 Fiber Optic Cable (96F) FT $ 4.28 $ 5 Fiber Optic Cable (72F) FT $ 2.68 $ 6 Fiber Optic Cable (48F) FT $ 1.75 $ 7 Fiber Optic Cable (24F) FT 8,500 $ 0.75 $ 6,375.00 8 Fiber Optic Cable (12F) FT 5 0.52 5 9 1 1/4" HDPE Duct FT $ 0.60 5 10 1" Innerduct FT $ 0.42 5 11 Vault, 4'x6'x4' EA $ 2,000.00 5 12 Handhole, 3'x5'x3' EA $ 500.00 5 13 Street Rated Round Manhole, 3'x3' EA $ 1,291.67 $ 14 Locate Wire FT 612 $ 0.14 $ 86.70 15 Strand & Hardware FT 4,679 $ 0.58 $ 2.729.42 16 GMAN Equipment LS $ 1,292.98 $ 17 Splice Enclosure EA $ 1,000.00 $ 18 Patch Panel, 12PT EA $ 670.88 $ 19 Patch Panel, 24PT EA 1 $ 1,052.33 5 1,052.33 20 Patch Panel, 48PT EA $ 3,815.33 $ 21 Patch Panel, 72PT EA $ 4,881.70 $ 22 Patch Panel, 96PT EA $ 6,519.17 $ 23 Miscellaneous/Material shipping recieveing cost LS 1 $ 1,707.24 $ 1,707.24 24 Miscellaneous/Flowable fill LS $ 3,333.33 $ Sub -Total $ 11,950.69 C) Make Ready Estimate Item Description Unit Qty Unit $ Extended 1 Estimated $ (includes all MR and Tree Trimming) MI 0.3 $ 13,500.00 $ 3,375.00 Sub -Total 5 3,375.00 D) Right of Way Recurring Costs: Item Description Unit 1 AE Per Pole 2 TXU Per Pole 3 SWB Per Pole 4 SWB duct FT 5 CP&L Per Pole 6 AEP Per Pole 7 CPS Per Pole 8 CoSery Per Pole 9 PEC Per Pole 10 Cap Metro Railroad ROW usage Fee FT 11 Cap Metro Aerial/Underground Crossing Fee LS Page 2 of 4 Qty Unit Extended $ 15.85 $ 27 $ 8.01 $ 216.27 $ 2.86 $ $ 0.45 $ $ 6.91 $ $ 9.00 $ $ 11.41 $ $ 7.74 $ $ 18.00 $ $ 2.00 5 $ 350.00 $ Sub -Total $ 216.27 One Time Costs: Item Description 1 Pole Application Fee/Engineering - Austn Energy 2 Pole Application Fee/Overlash - Austn Energy 3 Pole Application Fee - TXU 4 Pole Application Fee - PEC 5 Pole Application Fee - CPS 6 Pole Application Fee Overlash- CPS 7 Pole Application Fee - AEP 8 City Of Austin Excavation Permit 9 City Of Austin ROW usage Fee 10 City Of Austin Final Inspection Fee 11 City Of Austin Sidewalk closure Fee 12 Railroad Permits/App fees 13 County Permits 14 Bonds Unit Per Pole Per Pole Per Pole 1 to 25 Poles 1 to 25 Poles Per Pole Per Pole Per Street Per Day/Per Lane EA Per Day/Per SW EA EA EA Page 3 of 4 Qty Unit $ $ 78.20 $ 78.20 27 $ 78.20 $ 100.00 $ 51.59 $ 6.93 $ 55.00 $ 30.00 $ 9.00 $ 125.00 $ 6.00 $ 6,000.00 1 $ 330.00 1.0 $ Sub -Total Extended $ $ 2.111.40 $ $ $ $ 330.00 $ 2,441.40 Sub -Total $ 2,657.67 E) Construction Labor Item Description Unit Qty Unit $ Extended 1 Strand FT 4,679 $ 0.72 $ 3,353.28 2 Place Rock Anchor EA $ 70.83 $ 3 Place Bust Anchor EA 19 $ 112.50 $ 2,137.50 4 Place Riser Guard EA 6 $ 45.83 $ 275.00 5 Lash Fiber Cable FT 5,066 $ 1.17 $ 5,910.33 6 Lash Additional Fiber Cable FT $ 0.47 $ 7 Overlash Fiber FT 1,748 $ 1.23 $ 2,155.87 8 Overlash Fiber, each additional fiber FT $ 0.47 $ 9 Delash FT $ 0.65 $ 10 Delash/Relash FT 204 $ 0.88 $ 180.20 11 Tree Trimming FT $ 0.38 $ 12 Directional Drill - Dirt FT $ 15.00 $ 13 Directional Drill - Rock FT $ 41.67 $ 14 Hand Trenching 18" - Dirt FT $ 8.33 15 Hand Trenching 24" - Dirt FT $ 10.00 8 16 Hand Trenching 36" - Dirt FT $ 11.67 $ 17 Hand Trenching 18" - Rock FT $ 12.08 $ 18 Hand Trenching 24" - Rock FT $ 14.58 $ 19 Hand Trenching 36" - Rock FT $ 17.08 $ 20 Machine Trenching 18" - Dirt FT $ 6.67 $ 21 Machine Trenching 24" - Dirt FT $ 7.92 $ 22 Machine Trenching 36" - Dirt FT $ 9.17 $ 23 Machine Trenching 18" - Rock FT $ 10.42 $ 24 Machine Trenching 24" - Rock FT $ 12.50 8 25 Machine Trenching 36" - Rock FT $ 14.17 $ 26 Missile Boring, up to 4" conduit FT $ 11.67 $ 27 Asphalt Cut Composite FT $ 30.00 $ 28 Additional 12" Asphalt Patch FT $ 5.83 $ 29 Remove & Replace Concrete SqFt $ 62.50 $ 30 Additional Conduit FT $ 0.75 $ 31 Set Pull Vault, Dirt EA $ 70.83 $ 32 Set Pull Vault, Rock EA $ 87.50 $ 33 Place Mouse Vault EA $ 179.17 $ 34 Place Street Rated Man Hole EA $ - $ 35 Proof Conduit & Blow String FT 520 $ 0.25 $ 130.00 36 Core Bore Manhole EA $ 216.67 $ 37 Pull Coax or Copper (Trace Wire) FT 520 $ 0.42 $ 216.67 38 Install 3 - 1 1/4" Innerducts thru existing 4" duct FT $ 2.50 $ 39 Fiber in Conduit FT 1,780 $ 1.08 $ 1,928.33 40 Splice Fiber, 1-36 count EA 24 $ 38.33 $ 920.00 41 Splice Fiber, 37-84 EA $ 35.00 $ 42 Splice Fiber, 85 count and over EA $ 31.67 $ 43 Fiber Splice Closure EA 1 $ 183.33 $ 183.33 44 Mid -entry Splice Enclosure EA $ 266.67 $ - 45 Re-enter Existing Splice Enclosure EA 1 $ 91.67 $ 91.67 46 Transport Material EA $ 8,333.33 $ 47 Crew Hour HR 5 $ 108.33 $ 541.67 48 Building Entrance Facility (see BSE $) LS 1 $ 1,118.20 $ 1,118.20 49 Miscellaneous/Traffic control/Materials LS $ 12.00 $ 50 TxDOT Hwy Crossing EA $ 4,800.00 $ Sub -Total $ 18,023.85 Grand Total: $ 39,48130 Page 4 of 4 DATE: July 16, 2007 SUBJECT: City Manager - July 20, 2007 ITEM: Action authorizing City Manager to approve purchase order with Grande Communications, Inc. to run fiber optic cabling from Transportation/Utility Building at 212 Commerce Cove to the new Round Rock Police Facility at 3001 Tellabs Drive. De nent:. ,Justification: Engineering and Development Services Tom Word, Chief pf P.W. Operations Larry Madsen, Construction Manager This project has to be completed to connect the new Police Facility to the City's overall data system and controls at City Hall. The City originally entered into a contract with Southwestern Bell Telephone for this work, but they have opted not to perform the work and are going to pay up to $15,000 above their original agreement of $37,747.63 to have Grande complete the work. The fiber will connect to the RRISD's fiber network in accordance with the City's agreement with RRISD to be installed by Grande Communications, Inc. Funding: Cost: Source of funds: $49,481.00 2002 GO Bonds General Self Finance Construction Southwestern Bell Telephone reimbursement Outside Resources: Southwestern Bell Telephone Grande Communications, Inc. Background Information: N/A Public Comment: N/A