Loading...
CM-07-07-179STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HALFF ASSOCIATES, INC. ("Engineer") ADDRESS: 1421 Wells Branch Parkway, Suite 104, Austin, TX 78660 PROJECT: GREATER LAKE CREEK PARK IMPROVEMENTS This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Halff Associates, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 26th day of May, 2005 for the Greater Lake Creek Park Improvements Project and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $7,056.00 to a total of $165,734.00, and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 4. Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $7,056.00 the lump sum amount payable under the Contract for a total of $165,734.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. o1-0-i7g Supplemental Contract Rev 071061{)6 #118538 84275 0199.0057. PR22EGRET 1 HALFF ASSOCIATES, INC. By: /411/ n , � -/.)tet_ vo Date CITY 0„ ROUND ROCK By: Ukvics ' usej 21 Zov Date Supplemental Contract #118538 0199.0057. PK22EGRET 2 VEDIAS TO'FORM: n L. Sheets, City Attorney Rev 07/06!06 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: The scope of work for this project includes preparation of a Storm Water Pollution Protection Plan (SWPPP) for the Project. PROJECT ASSUMPTIONS The scope of services for this proposal has been prepared using the following assumptions as a basis for its preparation: 1. The SWPPP will be for the area currently depicted by construction documents as the project area. 2. The SWPPP will be at 1" = 50' scale, with an assumption that approximately eight (8) sheets will be provided. 3. Hall' Associates will prepare the SWPPP for use by the Contractor selected to perform and work of the Project. SCOPE OF SERVICES The Basic Services are defined as follows: A. Storm Water Pollution Prevention Plan 1. The Storm Water Pollution Protection Plan (SWPPP) will include the following components: a. Existing and proposed contours b. Existing drainage features c. Drainage patterns d. Creeks and other surface waters, if applicable e. 100 -yr flood plain £ Limits of construction g. Areas not to be disturbed h. Erosion and Sedimentation Controls i. Tree protection measures j. Construction phasing, if applicable k. Erosion, Sedimentation, and Tree Protection notes and details B. Deliverables 1. Provide three (3) copies of the SWPPP in hard copy format for Contractor use. 2. Provide one (1) copy of the SWPPP in digital format (Microsoft Word 2000 (.doc) and AutoCAD (.dwg)) for Contractor use. C. Additional Services Additional services shall consist of those elements identified in the original scope of work for the Contract H. Excluded Services Excluded services shall consist of those elements identified in the original scope of work for the Contract. ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: Fee Summary In accord with Exhibits A, B and C, our proposed fees to complete the project are as follows: Base Fees SWPPP Plan $7,056 TOTAL ADDITIONAL SERVICES FEE $7,056 Reimbursable Expenses"" 1. Out of pocket expenses related to travel, mileage, courier expenses, printing, postage and graphic reproduction shall be reimbursed at cost plus 0 percent 2. Cost of permits or filing fees required by regulatory agencies or City departments obtained for the City shall be paid by the City. TOTAL Manhours I HRS I V. 24 CG r N T CO H ILI 1 CO = r 00 N N $2,288 1 Project Engineer co CM i HRS co N N N co T 40 Landscape Architect a) HRS N Nr v- s# N 41) N CD T 4. Project Manager $180 =cnNe N N N N N r T iii Task Description Hourly Rates c a. a D. 3 1 Coordination with Owner Erosion Sedimentation Control Tree Protection Notes and Details 0 .5 u. o Z Halff Total Hours Halff Total Feel BLUE SHEET FORMAT DATE: July 23, 2007 SUBJECT: City Manager Meeting - July 27, 2007 ITEM: Request for approval of Supplemental Agreement #1 with Halff Associates, Inc. for additional engineering services for the Greater Lake Creek Park Development Project. Department: PARD Staff Person: Rick Atkins, Parks & Recreation Director David Buzzeil, Park Development Manager Justification: Additional engineering services required for the construction of the Greater Lake Creek Park Trail Development. Funding: $1,352,993.24 Cost: $7,056.00 Source of funds: LCRA Grant, TPWD Grant, 2002 GO Bonds Outside Resources: Halff Associates, Inc. Background Information: The Greater Lake Creek Park Project involves three existing park properties and several parcels of land that the City already has or will acquire through the platting process of new neighborhoods. Clay Madsen Park, Greenlawn Park, and Lake Creek Park will all receive improvements in the form of new development and/or renovations. These three parks will also be connected with a hike & bike trail. Also included in this project will be the City's first dog park and inline hockey facility. This project is partially funded by a Texas Parks and Wildlife Dept. (TPWD) Grant and a LCRA Partnership in Parks Grant. Public Comment: N/A Blue Sheet Format Updated 01/20/04