CM-07-09-208ROUND ROCK POLICE FACILITY CONSTRUCTION CHANGE ORDER Project: Round Rock Police Facility Address: 3001 Tellabs Drive Change Order No.: 5 Initiation Date: 9/17/2007 Round Rock, Texas Contract For: General Construction To: FT Woods Construction 1966 South Austin Avenue Georgetown, Texas 78626 (Contractor) The Contract is changed as follows: Contract Date: 2/22/2007 #29 RJ 45 Jacks per CAPCOG Add $ 4,880.44 #30 Add electric receptacles per CAPCOG Add $ 6,822.80 #31 Add circuits per CAPCOG Add $ 3,348.07 #48 Add dedicated circuits per AT&T Add $ 709.54 #54 Add 2 manual transfer switches for UPS Add $ 4,725.56 #56 Relamp & Reballast 29 fixtures at South side soffit Add $ 3,820.41 Total $ 24,306.82 This Change Order is not in effect and will not be included in the Contract Documents until signed by the Owner, Architect and Contractor. Changes induded herein are subject to all conditions affecting them under the substitution specification section. Summary The original Contract Sum was. $ 10,884,000.00 Net change by previous authorized Change Orders. $ 98,858.02 The Contract Sum prior to this Change Order was. $ 10,982,858.02 The Contract Sum will be increased by this Change Order $ 24,306.82 The new Contract Sum including this Change Order will be. $ 11,007,164.84 The Contract time will be changed by ( 18 )days: The Date of Substantial Completion as of the date of this Change Order therefore is: 12/26/07 Brinkley Sargent A 5000 Quorum Drive, Suite 600 Address Address Address FT Woods Construction City of Round Rock Contractor Owner 1966 South Austin Avenue 221 East Main Street Dallas, Texas 75254 Georgetown, Texas 78626 Round Rock, Texas 78664 By - By By Gary Beeman S.C. Inman, IV James R. Nuse, P.E. Date 9(i6107 0 / c3 7 Date Date til -O7 -o7- fag FIW000S Construction To: Gary Beeman Brinldey Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: 911 CAPCOG Cabling P.O. Box 122 Georgetown, TX 78827 Ph : 512-930-2607 Change Request Number: 29 Date: 6/25/07 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the following changes: Provide dedicated red cable for CAPCOG 911 with Red RJ45 Jacks in panel. The total amount to provide this worts is $4.880.44 (Please refer to attached sheet for details.) The schedule is riot affected by this change. tf you have any questions, please contact me at 512.930.2607. Submitted by: SC Inman FTWOODS Cc: Approved by Date: Page 1 of 2 in MOODS Construction Change Request 29 Price Breakdown Continuation Sheet Description: 911 CAPCOG Cabling P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2807 Description Labor Material Equipm.nt Subcontract Other Price Electrical 33,986.13 $3,986.13 Project Management Field Management Insurance Bond Overhead Profit Subtotal $3,986.13 $120.00 $60.00 $4,166.13 0.61% $25.41 $4,191.54 0.81% $33.95 $4,225.49 10.00% $422.55 $4,648.04 5.00% $232.40 Total: $4,880.4 Page 2 of 2 CHANCE ORDER REQUEST CHANGE ORDER - RRPD - CO#10 DATE: JUNE 19 2007 NAME: SC INMAN COMPANY: FT WOODS CONST. PROVIDE DEDICATED (RED) CABLE FOR CAPCOG 911 WITT 1 RED RJ45 JACKS IN PANF.i. MATE RJA1. (NONE) TAX MATERIAL TOTAL LABOR 50.00 50.00 50.00 0.00 INSTALLER I IO<1RS AT 525.00 /HOUR S.00 0.00 JOURNEYMAN HOURS AT 535.00 /HOUR 50,00 I.00 PROJECT MGR. HOURS AT 565.00 /HOUR 565.00 SUBTOTAL LABOR 565.00 PAYROLL TAXES (J 35% 522,75 LABOR TOTAI. 587.75 M1SC1. I,LANE(KJS EXPENSES SUBCONTRACTOR (ACE AUDIO) 53,536.00 PERMITS 50.00 FREIGI IT 50.00 MISCELLANEOUS TOTAF. 53,536.00 MATERIAL. 50.00 MISCELLANEOUS $3.536.00 LABOR 587.75 SUBTOTAL. 53,623.75 OV ERI IF.AD & PROFIT (I 0%) $6238 TOTAL 1.1986.13 Regulated by tete Texas Department of Licensing & Regulation. P.O, Box 92157, Austin, TX 78711,1-800.803-3902, 512-483-6599 Website: wwwlic:enss.sEate.bcuslcomolaints 512-218-4043 Corporate AceAudio 212�381°8 "Ant°npflye acornmunicatipne, i t•• 51�4g Central Fax YQyit SOUND. ETip Sornc►R -�- -_..Ct)iy� �C �1r~ .atrar..�t «�QcYryew/ yM .. fin'"E� - Batas -, c 1/111 s Optics 4. s S cabana and open Job Proposal Ace Audio Cornntrrn Ons is storice Texas Certification #1 42 derutilized Business (HUB), June 13, 2007 To: ACM Services : Attn: RRPDorris Fax: 365-3989 Ace Audio Comrrnrna the above renced projc• appredates the opportunity to submit this proposal for Change Order. Add 1 drop per 911 console (total 10 drops) Total $31536.00 Exdusrivns: conduit scar dard wood -working, table to boxes, power, bench. hewed oaf and fax, dertrolition, required IIiub Aeirr�ng, additional waiver of ��9'a�, addrtianal Ace A Communications, inc. Change Request I Oa MOODS Construction To: Gary Beeman Brinkley Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: 911 CAPCOG Receptacles P.O.Box 122 Georgetown, TX 78627 Ph : 512-930-2607 , Number 30 Date: 685/07 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the following changes: Provide dedrf red quad receptacle at each station for CAPCOG equipment The total amount to provide this work is $6,822.80 (Please refer to attached sheet for details.) Please note that FTWOODS Construction Services Inc wsl revue an extra 1 day. If you have any questions, please contact me at 512.930.2607. Submitted by. SC Inman FTWOODS Cc: Approved by: Date: Page 1 of 2 MOODS Construction Change Request 30 Price Breakdown Continuation Sheet Description: 911 CAPCOG Receptacles P.O_Box 122 Georgetown, TX 78827 Ph : 512-930-2607 Description Labor Material Equipment Subcontract Other Price Electrical $5.644.19 $5,644.19 Subtotal: $5,644.19 Project Manage0ent $120.00 Field Management $60.00 Insurance $5,824.19 0.61% $35.53 Bond $5,859.72 0.81% $47.46 Overhead $5,907.18 10.00% $590.72 Profit $6,497.90 5.00% $324.90 Total: $6,822.80 Page 2 of 2 1111 BzaRYZCmas CHANGE ORDER REQUEST CI IANGF; ORDER - RRPD - CO#11 14UD VECELIA bl . OFFICe (512) 385-639.3 FAx (512) 352.6275 ACM NICKOSPCGIASK NET TDLR LKOISE 616676 TINS 03-0541194 NECK MORRIS DATE: JUNE 19 2007 NAME: SC INMAN COMPANY: FT WOODS CONST. PROVIDE DEDICATED QUAD (RED) RECEPTACLE AT EACH S'1'Al'ION FOR CAPC:OG EQUIPMENT MATERIAL (SEE ATTACHED SI LEI33T) $2.01636 TAX MATERIAL. Tom L $2,0i6.36 LABOR 72.72 INSTALLER HOURS AT $25,00 /HOUR $1,818.00 12.12 JOURNEYMAN HOURS AT $35.00 /HOUR $424.20 1.o0 PROJL'CE MGR. HOURS AT $65.00 /HOUR $65,00 SUBTOTAL LABOR $2,307.20 PAYROLL TAXES @ 35% $807.52 LABOR TO"T"AL 53,114.72 MISCELLANEOUS EXPENSES SUBCONTRACTOR $0.00 PERMITS ;S $0.00 FREIGHT 50.00 MISCELLANEOUS TO"I'AL $0.00 MATERIAL $2,016.36 MISCELLANEOUS $0.00 I.ABOR psi 14,73 SUBTOTAL $5,131.08 OVF.RI LEAD & PROFIT (10%) $1.0-11 TOTAL =44-19 Regulated by the Texas Department of. Licensing & Regulation. P.O. Box 12157, Austin, TX 78711,1-800-8034902, 512-463-8599 Website: wwwlicense.state.bc.us/complaints POLES 1-60AMP RECP DUPLEX 5-20R (RED) 1 BUSHING 1 KINDORF STRAP 1 LOCKNUT 1 EMT CONDUIT 1 EMT SS CONN STL 1 EMT SS COUP STL BOX 43 112-3/4 CVR 4S BLANK CVR 481-DUP 10 THHN 12-3 SO CORD WIRENUTS JETLINE PER FOOT PLASTIC TAPE SLK TEK SCREW 10X314 RAW TOTALS RRPD - C0#11 capcog receptacles TOTAL UNIT UNIT TOTAL UNIT QUANTITY UNIT COST COST LABOR LABOR 12 38.00 456.00 0.15 1.80 12 3.50 42.00 0.25 3.00 6 0.13 0.78 0.05 0.30 24 0.57 13.68 0.06 1.44 4 0.16 0.54 0.06 0.24 240 0.90 216.00 0.06 14.40 8 0.52 3.12 0.08 0.48 25 0.70 17.50 0.09 225 28 0.87 24.36 0.25 7.00 14 0.26 3.64 0.10 1.40 12 1.21 14.52 0.10 1.20 5250 020 1,050.00 0.006 31.50 280 0.58 162.40 0.02 5.60 84 0.06 5.04 0.01 0.84 280 0.006 1.68 0.002 0.42 1 2.00 2.00 0.10 0.10 75 0.04 3.00 0.01 0.75 2,016.36 72.72 Change Request I F1WOODS Construction To: Gary Beeman Brinldey Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: 911 CAPCOG Additional Circuits P.O. Boot 122 Georgetown, TX 78627 Ph : 512-930-2807 Number 31 Dabs: 6/25/07 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the following changes: Provide additional additional circuits to panel 'LEE' for CAPCOG. The total amount to provide this work is $3,348.07 (Please refer to attached sheet for details.) The schedule is not affected by this grange. if you have any questions, please contact me at 512.930.2607. Submitted by: SC Inman FTWOODS Co: Approved by. Date' Page 1 of 2 MOODS Construction Change Request 31 Price Breakdown Continuation Sheet Description: 911 CAPCOG Additional Circuits P.O. Wet 122 Georgetown, 1X 78827 Ph : 512-930-2607 Description Labor Material Equipment Subcontract Other Prig Electrical $2.738.04 $2,738.04 Project Management Field Management Insurance Bond Overhead Profit Subtotal: $2,738.04 $60.00 $60.00 $2,858.04 0.61% $17.43 52,875.47 0.81% $23.29 $2,898.76 10.0096 $289.88 $3,188.64 5.00% $159.43 Total: 53,348.07 Page 2 of 2 3iir RYZa3132B CHANGE ORDER REQUEST CHANGE ORDER - RRPD - CO#12 OFFICE (512) 3551393 FAX(512)362-3275 AOLNICICOSOCOLOIPALgET ra TING -06411G4 Nioc , DATE: JUNE 19 2087 NAME: SC INMAN COMPANY: FT WOODS CONST. PROVIDE ADDITIONAL PANEL SPACE FOR CAPCOG - ADDITIONAL CIRCUITS TO PANEL 'LER MATERIAL. (SEE ATTACHED SIIEET) 52,182.00 I.AX X0.00 MATERIAL. TOTAL $2,182.00 LABOR 5.10 INSTALLER HOURS AT $25.00 /HOUR $127.50 1.00 JOURNEYMAN HOURS AT $35.00 /HOUR $35.00 1.00 PROJECT MGR. HOURS AT $65.00 /HOUR 565.00 SUBTOTAL. LABOR $227 0 PAYROLL TAXES @ 35% X74.63 LABOR MAL$307.13 MISCELLANEOUS EXPENSES SUI3CONTRAC I'OR 50.00 PERMITS $0.00 FRFIGI n' MISCF.LLANEUUS TOTAL. $0.00 MATF.RIAL $2,182.00 MISCELLANEOUS 50.00 LABOR $307.13 SUBTOTAL $2,489.13 OVERI WAD & PROFIT (10%) 5248.91 TOTAL. 2.735.04 Regulated by the Texas Department of Licensing & Regulation. P.O. Box 12157, Austin, TX 78711,1-800-803-3902 512-463-6599 Website: wwvaoenae.state.bc.us/comolainta INCREASED PANEL CAPACITY POLES 1-60AMP RAW TOTALS PANEL 'LEE' EXPANSION TOTAL UNIT UNIT QUANTITY UNIT COST COST LABOR 1 2182 2,182.00 1.50 24 0.00 0.00 0.15 2,18200 TOTAL UNIT LABOR 1.50 3.60 5.10 FTWOODS Construction To: Gary Beeman Bnrddey Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: Add 911 Area receptades P.O. Banc 122 Georgetown, TX 78627 Ph : 512-930-2607 Change Request Number. 48 Date: 8/7/07 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the Mowing changes: Add quad outs/dedicated ciraffs for 911 room for AT&T. The total amount to provide this work is $709.54 (Please refer to attached sheet for details.) The schedule is not affected by this change. If you have any questions, please contact me at 512.930.2607. Submitted by: SC Inman Fri/vows Cc Approved by: Date: Page 1 of 2 Oa F WOOCDS Change Request 48 Price Breakdown Continuation Sheet Description: Add 911 Area receptacles P.O.Box 122 Georgetown, IX 78627 Ph : 512-930.2607 Description Electrical Labor Material Equipment Subcontract Other Price $485.69 $485.69 Project Management Field Management Insurance Bond Overhead Profit Subtotal $485.69 $60.00 $60.00 $605.69 0.61 % $3.69 $609.38 0.81 % $4.94 $614.32 10.00% $61.43 $675.75 5.00% $33.79 Total: $709.54 Page 2 of 2 AIL WIC 6iM3EVmoIMeI CHANGE ORDER REQUEST CHANGF. ORDER ROUND ROCK POLICE FACILITY C.U. #15 3280 F TAYLOR. TX Orpcc(512)365-8.993 FAX (512)365-3589 TDLR LIMN:* #19676 7710 Lts 112 DATE: AUG 6 2007 NAME: SC INMANN COMPANY: FT WOODS CONST. ADI) QUAD OlJTLF:I;S / DEDICATED CIRCUITS COMM. RM 911 FOR AT&T DUPLEX RI:CI;PTACLLS / CVRS / WIRF. / CONDUIT / CXNS MATrRIA1. (SEL' A'1TACI In) SHEET) $8797 TAX I� W MATERIAL TOTAL. 587.97 1.AI3OR 7.44 INS'T'ALLER IIOURS AT $25.00 /H011R S186.00 1.24 JOURNEYMAN HOURS AT $35.00 /HOtJR I .40 0.50 PR()JFC-T- MGR. HOURS AT S65.00 /HOUR 11250 SIJli'r(rl'AL LABOR 5261.90 PAYROLL TAXES (a) 35% X1,67 1.AI3OR'I'OTA1. 5353.57 MISCELLANEOUS EXPENSES EQUIPMENT R ,N'1'AI. 50.00 PERMITS 50.00 FRLIGI IT 50.00 MISCEI.I.ANEOLJS 'TOTAL $0.00 MATERIAL 587.97 Mlsc -:I.I.ANEOUS 50.00 LABOR D53.57 SUR7'OTnL 5444L54 OVERHEAD & PROFIT (10%) k44-15 TOTAL $485.6 Regulated by the Texas Department of Licensing &. Regulation. P0. Box 12157, Austin, TX 78711,1-800-803.3902, 512-463-6599 711..i...:a..- .u.awu I:.....,ae► ototo tv 1 ,eI mf11AIfl$ ROUND ROCK POLICE FACILITY C.O. # 16 P2 ADD OUTLETS CIRCUITS COMM. RM 911 RECP DUPLEX 5-20R QUAD PLASTIC PLATE 1/2 EMT SS CONN DC 1/2 EMT CONDUIT 1/2 EMT SS COUP DC 1/2 1-H EMT STRAP BOX 481/2-3/4 RING 4S 2G 5/8R CVR 4S BLANK 12 THHN WIRENUTS TEK SCREW 10X314 RAW TOTALS TOTAL UNIT UNIT TOTAL UNIT QUANTITY UNIT COST COST LABOR LABOR 4 3.50 14.00 025 1.00 2 0.75 1.50 0.15 0.30 8 0.20 9.60 0.06 0.48 45 0.27 12.15 0.04 1.80 4 0.29 116 0.07 0.28 4 0.08 0.32 0.03 0.12 4 0.87 3.48 025 1.00 2 0.84 1.88 0.10 0.20 2 0.26 0.52 0.10 0.20 360 0.14 50.40 0.005 1.80 6 006 0.36 0.01 0.06 20 0.04 0.80 0.01 0.20 87.97 7.44 MOODS Construction To: Gary Beeman Brinkley Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: Add 911 Area receptacles P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Change Request Number: 48 Date: 8/7/07 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the following changes: Add quad outlets/dedicated circuits for 911 room for AT&T. The total amount to provide this work is $709.54 (Please refer to attached sheet for details.) The schedule is not affected by this change. If you have any questions, please contact me at 512.930.2607. Submitted by: SC Inman FTWOODS Cc: Approved by. Date' Page 1 of 2 F WOODS Construction Change Request 48 Price Breakdown Continuation Sheet Description: Add 911 Area receptacles P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Description Electrical Labor Material Equipment Subcontract $485.69 Other Price $485.69 Project Management Field Management Insurance Bond Overhead Profit Subtotal: $485.69 $60.00 $60.00 $605.69 0.61% $3.69 $609.38 0.81% $4.94 $614.32 10.00% $61.43 $675.75 5.00% $33.79 Total: $709.54 Page 2 of 2 3280 F TAYLOR, TX 7 OFFICE (312) 365-8393 FAX (512) 355-39119 TDLR LICENSE #19676 SEROIT1c70s CHANGE ORDER REQUEST CHANCE ORDER ROUND ROCK POLICE FACILITY C.U. #15 DATE: AUG 6 2007 NAME: SC INMANN COMPANY: FT WOODS CONST. ADD QUAL) OIJTI.E I'S / DEDICATED CIRCUITS COMM. RM 911 FOR AT&T DUPLEX RICE PTACLLS / CVRS / WIRE / CONDUIT / CXNS MATERIAL (SEL' A'ITACI1E1) sFu, T) TAX MA'T'ERIAL TOTAL. I.A13OR 7,44 INSTALLER IIOURS AT $25.00 /HOIJR 1,24 1OIJRNLYMAN HOURS AT $35.00 /HOUR 0.50 PROJECT MGR. IIOURS AT $65.00 /HOUR SI113T<Y1'AL LABOR PAYROLL TAXES (a) 35% I,ARORTOTAL $87.97 $0.00 $257,97 $186.00 143.10 82.50 S2(l.9() 211,fi7 S353.57 MISCELLANEOUS EXPENSES L'(>Ltlt'MP.N'1' REN I'AL $0.00 PERMITS $0.00 FREIOIIT SO.W MISCELLANEOUS 'TOTAL $0,00 MATERIAL $87.97 MISCH.1.ANEOUS $0.00 LABOR 1353.57 SUBTOTAL f 441.54 OVRRHEAU & PROFIT (10%) $44.15 TOTAL $485.5,2 Regulated by the Texas Department of Licensing &Regulation. P.O. Box 12157, Austin, TX 78711, 1-800-803-3902, 512-463-6599 IA/..1-.,'a ..,.,n„ 1. otoin iv , cirmmnla into • 1 ROUND ROCK POLICE FACILITY C.O. # 15 P2 ADD OUTLETS CIRCUITS COMM. RM 911 RECP DUPLEX 5-20R QUAD PLASTIC PLATE 1/2 EMT SS CONN DC 1/2 EMT CONDUIT 1/2 EMT SS COUP DC 1/2 1-H EMT STRAP BOX 48 1/2.3/4 RING 4S 2G 5/8R CVR 4S BLANK 12 THHN WIRENUTS TEK SCREW. 10X3/4 RAW TOTALS TOTAL UNIT UNIT QUANTITY UNIT COST COST LABOR 4 3.50 14.00 0.25 2 0.75 8 0.20 45 0.27 4 0.29 4 0.08 4 0.87 2 0.84 2 0.26 360 0.14 6 0.06 20 0.04 1.50 0.15 1.60 0.06 12.15 1.16 0.32 3.48 1.68 0.52 50.40 0.36 0.80 87.97 0.04 0.07 0.03 0.25 0.10 0.10 0.005 0.01 0.01 TOTAL UNIT LABOR 1.00 0.30 0.48 1.80 0,28 0.12 1.00 0.20 0.20 1.80 0.06 0.20 7,44 Change Request I CAU RVVOODS Construction To: Gary Beeman Brinkley Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: UPS Transfer Switch P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2807 Number: 54 Date: 9/11/07 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the following changes: Provice 4 -pole manual transfer switch for two (2) UPS units. The total amount to provide this work is ... $4,725.56 (Please refer to attached sheet for details.) The schedule is not affected by this change. If you have any questions, please contact me at . Submitted by: SC Inman FTWOODS Cc: Approved by: Date: Page 1 of 2 ‘222 MOODS Construction Change Request 54 Price Breakdown Continuation Sheet Description: UPS Transfer Switch P.O. Box 122 Georgetown, TX 78827 Ph : 512-930-2607 Description Labor Material Equipment Subcontract Other Price Electrical $3,913.91 $3,913.91 Prof Management Field Management Insurance Bond Overhead Profit Subtotal $3,913.91 $60.00 $60.00 $4,033.91 0.61% $24.61 $4,058.52 0.81% $32.87 $4,091.39 10.00% $409.14 $4,500.53 5.00% $225.03 Total: $4,725.56 Page 2 of 2 AIL C BmRmcIEia CHANGE ORDER REQUEST CHANCY. ORDER - ROUND ROCK POLICE FACILITY C.O. #19 3280 FM 112 TArU UW. TX 78574 Omer (312) 365-8393 FAx (512) 365.3989 TOLA LICENSE /19876 DATE: SEPTEMBER 10 2007 NAMF,: SC INMANN COMPANY: FT WOODS CONST. PROVIDE 4 POLE MANUAL, TRANSFER SWI'1'Cl I FOR 2 UPS UNITS MATERIAI. (SEE A lT ACI1ED SI JI ET) S2,778.00 TAX 50.00 MAIV.RIA1. TOTAL 52,778.00 I.ABOR 15.60 INSTALLER HOURS AT 525.00 /HOUR 5390.00 2.60 JOURNEYMAN HOURS AT 535.00 /HOUR 591.00 1.00 PROJECT MGR. HOURS AT 565.00 /HOUR 565.00 SUBTOTAL LABOR S546.00 PAYROLL TAXES (4)35% 5191.10 LABOR '1 U rAL 5737.10 MISCELLANEOUS EXPENSiS EQUIPMENT RENTAL 50.00 PERMITS 5000 FREKJIIT 54100 MISCELLANEOUS TOTAL. 54100 MA7'ER1A I. 52,778,00 MISCELLANEOUS $43.00 LABOR $737.10 SUBTOTAL S3,558.10 OVLRHEAI) & PRUFTT (10%) S355.81 TOTAL LL.9.1121 Regulated by the Texas Department of Licensing & Regulation. PO. Box 12157, Austin, TX 78711,1-$O0-803.3902, 512-963-6599 Website; www.license.statelx_us/complaints 4 POLE MANUAL X-FER SWITCH 12 X 12 SPLICE BOX POLARIS TAP BLOCKS iro WIRE RAW TOTALS CO#19 UPS XFER SWITCH TOTAL UNIT UNIT QUANTITY UNIT COST COST LABOR 2 1,100.00 2,200.00 3.00 2 65.00 130.00 2.00 8 43.00 344.00 0.20 80 1.3 104.00 0.05 2.778.00 TOTAL UNIT LABOR 6.00 4.00 1.60 4.00 15.60 Change Request I FIWOODS Construction To: Gary Brinidey Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: South soffit lights P.O. Bax 122 Georgetown, TX 78827 Ph : 512-930-2607 Number: 56 Date: 9/11/07 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the following changes: Relamp & rebalast 29 fodw+es on south soffit Provide new lenses for those missing. The total amount to provide this work is $3,820.41 (Please refer to attached sheet for details.) Please note that FTWOODS Constriction Services Inc will require an extra 2 days. If you have any questions, please contact me at . Submitted by: SC Inman FTWOODS Cc Approved by- Date. yDate• Page 1 of 2 OZ2 F1WOODS Construction Change Request 56 Price Breakdown Continuation Sheet Description: South soffit lights P.O. Box 122 Georgetown, TX 78827 Ph : 512-930-2807 Description Electrical Labor Material Equipment Subcontract Other Price $3,081.25 $3,081.25 Project Management Field Management Insurance Bond Overhead Profit Subtotal: $3,081.25 $60.00 $120.00 $3,261.25 0.61% $19.89 $3,281.14 0.81% $26.58 $3,307.72 10.00% $330.77 $3,638.49 5.00% $181.92 Total: $3,820.41 Page 2 of 2 AIL MIK BiMRYZC3mB CHANGE ORDER REQUEST Tito c -2* -s CHANGE ORDER ROUND ROCK POLICE FACILITY C.O. #18 3280 FM 112 TAYLOR. TX 76574 Orrice (512) 3668393 FAx (512) 305.3989 TDLR I.JCEN6t 419676 DATE: SEPTEMBER EMBER 10 2007 NAME: SC 1NMANN COMPANY: FT WOODS CONST. RF -LAMP AND REDALLAST 29 120V FIXTURES ON SOUTH SOFFIT' ORIGINALLY STIOWN TO RE RESERVED FROM 111011 VOLTAGE PANEL.PROVIDE NEW LENSES FOR ONES MISSING MATERIAL (SEF ATTACHED SHEET) 52,194.72 TAX 0_.00, MATERIAL TOTAL 52,194.72 LABOR 12.47 INSTALLER HOURS AT 52.5.00 /HOUR 5311.75 2.07 JOURNEYMAN I K)URS AT 535.00 /I IOU R 572,5 1.00 PROJECT MGR. HOURS AT 565.00 /I !OUR WAXI Stl BTOTAI . I .A BOR $449.20 PAYROLL TAXES t@ 35% $157.22 LABOR TOTAL $606A2 M1SCELLANEOIiS EXPENSES EQUIPMENT RENTAL *0.00 PERMITS $0.00 FREIGI I'1' 50.00 MISCELI.ANEOUS TOTAL *0.00 MATERIAL. 52,194.72 MISCELLANEOLIS 50.00 I.ABOR $606.42 suBToTAL 52 1.14 OVERI1hA1) & PROFIT (l0 4) AUX 1 TOTAL ,25 Regulated by the Texas Department of Licensing & Regulation. P O. Box 12157. Austin. TX 78711,1-800-803-3902, 512-463-6599 Website: www.ricense_state_tx.us/comp)aints ROUND ROCK POLICE FACILITY C.O. #18 SOFFIT UGHTS TOTAL UNIT UNIT TOTAL UNIT QUANTITY UNIT COST COST LABOR LABOR BALLAST KITS 29 58.00 1,682.00 0.15 4.35 LAMPS 29 17.50 507.50 0.25 7.25 WIRENUTS 87 0.06 5.22 0.01 0.87 RAW TOTALS 2,194.72 12.47 DATE: September 24, 2007 SUBJECT: City Manager - September 28, 2007 ITEM: Action authorizing the City Manager to execute change order number five with FT Woods Construction for the Round Rock Police Facility. Deoartment: Engineering and Development Services Staff Person: Tom Word, Chief of P.W. Operations Larry Madsen, Construction Manager ,Justification: This request provides for some items that were not included in the original plans but needed to meet the needs of CAPCOG and AT&T in the dispatch and 911 Communication rooms. CAPCOG will reimburse the City of Round Rock for the following after installed by FT Woods Construction: RJ 45 Jacks $4880.44, Electrical Receptacles $6,822.80, Electrical Circuits $3,348.07 for a total reimbursement of $15,051.31. AT&T also required additional circuits totaling $709.54. Manual Transfer Switches were not originally on plans for the two city UPS systems at a cost of $4,725.56. The last item is to relamp and reballast fixtures at the south soffits at the building at a cost of $3,820.41. Funding: Cost: $24,306.82 Source of funds: 2002 GO Bonds & General Self Finance Construction Outside Resources: N/A Backaround Information: The new contract total with 5 change orders of $123,164.84 represents 0.013% of the original contract amount. Original Contract Previous Change Orders Contract Sum Prior to this Change Order Increase with Change Order #5 The new contract sum Amount $10,884,000.00 $98,858.02 $10,982,858.02 $24,306.82 Public Comment: N/A $11,007,164.84