CM-2001-040 (2)C iN CITY OF ROUND ROCK INTEROFFICE MEMORANDUM DATE: February 5, 2001 TO: Jim Nuse Director of Public Works FROM: Bill Stablein Construction Coordinator RE: Park Valley Drive Change Order # 2 This is a Change Order # 2 for the Park Valley Project. This includes a total of six items. (1) Removal of unsuitable material within the roadway, (2) Saw -cut and excavation for a storm sewer line, (3) Installation of curbing at the Oakwood Arbors Medical Center, (4) Connecting water service to the Wyoming Springs Medical Center, (5) Installation of sprinkler system driveway sleeves, and (6) Connect two existing driveways to Park Valley Drive. I have discussed and reviewed these items with Tom Word. We recommend approval of the change order in the amount of $ 22,949.00. If you have any questions please contact me at 218-3237. Respectfully yours, zs.Di Bill Stablein \\Bill\my documents\CIP 2000\Park Valley\Park Valley Chg Order 2.doc PUBLIC WORKS DEPARTMENT SMITH CONTRACTING COMPANY General Construction • Excavating • Paving • Concrete • Utilities • Site -Work INVOICE CHANGE ORDER NUMBER TWO To: City of Round Rock Attn: Bill Stablein 12/23/00 Invoice# 122300 Re: Park Valley Drive Roadway Project Item #1: Excavate 44' X 250' X 18" ( 611 CY) Station 13+25 to 15+75; Removal of pre-existing clay area (Unstable Subgrade Material) Excavation: 611 CY c@ $5.00 3,055.00 Haul -Off: 40 Loads to Disposal Site $80.00 3,200.00 Select Fill: 200 Tons 1-1/2" Screenings $2.40 480.00 485 Tons City of Round Rock Base $3.50 1,697.50 Trucking: 30 Loads from T.C.S. $65.00 1,950.00 Installation: 600 CY L $3.00 1,800.00 Subtotal 12,1 W,50 Item #2: Excavate approx. 75 LF for 30 -Inch RCP Storm Sewer Line; Line terminates at Wingwall of Pond "D" Saw -Cut & Excavate 75 L.F. $15.00 Subtotal 1,125.00 Item #3: Install 107 LF of Hand -Form Curbing at Oakwood Arbors Med Center (Curbing removed to accomodate excavation of Storm Sewer) Concrete Curb & Gutter 107 LF $15.00 Subtotal 1,605.00 Item #4: Connect Water Service Line for Wyoming Springs Medical Center Labor: 1 Operator 2 Hours $15.00 30.00 2 Laborers 4 Hours $10.00 40.00 Taxes/Insurance-Labor: 25% 17.50 Materials: Sleeve, Glan Pack, Bedding, Fittings, etc 175.00 Equipment: Backhoe for Excavatng and Back -filling 50.00 Subtotal Item #5: Install (2) 3 -Inch PVC Driveway Sleeves for Womens Center Labor: 2 Laborers 6 Hours $10.00 60.00 Taxes/Insurance-Labor: 25% 15.00 Materials: 180 LF Sch 40 PVC; Misc. Fittings, etc. 270.00 Subtotal Item #6: Connect (2) Existing Driveways to Park Valley Drive; (Excludes signage, handicapped ramps or pavement markings) Flexible Base Material, Installed Concrete Curb & Gutter HMAC, 4 -Inch, Installed Total all Items 15% GC Profit and OH GRAND TOTAL 90 CY 102 LF 132 �Y $20.00 $15.00 $ 8.00 Subtotal Respectful Submitted, App -r,' VAL: 116.By: ', Title: 1,a,it_ay....." Date: a J 4-01 15308 Ginger St. • Austin, Texas 78728 • Office 512-990-7640 • Fax 512-990-7855 ! -- C Li'( 1,800.00 1,530.00 1,056.00 1,125.00 1,605.00 312.50 345.00 4,386.00 19, 956.00 2, 993.40 $22,949.40