Loading...
CM-2004-010n two ? ''t f • CERTIFIED MAIL March 9, 2004 TCEQ Storm Water/General Permit MC -228 PO Box 13087 Austin, Texas 78711-3087 Re: TPDES Storm Water General Permit No. TXR15 Delegating an "Authorized Representative" City of Round Rock East Transmission Line, Phase Two Dear Director: This letter serves to designate s'� 1, t as an authorized person for signing biweekly and post significant rainfall storm water inspections only. This authorization is not being used for signing a TPDES permit application (e.g. Notice of Intent). By signing this authorization, I confirm that I meet the following requirements to make such designation as set forth in Part III, Section F, Item Number 8D of the TPDES General Permit. For a corporation, the application shall be signed by a responsible corporate officer. For the purpose of this paragraph, a responsible corporate officer means a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation; or the manager of one or more manufacturing, production, or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding $25,000,000 (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. Corporate procedures governing authority to sign permit or post -closure order applications may provide for assignment or delegation to applicable corporate positions rather that to specific individuals. For a partnership or sole proprietorship the application shall be signed by a general partner or the proprietor, respectively. For municipality, State, Federal or other public agency, the application shall be signed by either a principal executive officer or a ranking elected official. For purposes of this paragraph, a principal executive officer of a Federal agency includes the chief executive officer of the agency, or a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g. Regional Administration of the EPA). "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Title 1 Date FM. (1\I ((1\.I'1\l June 4, 2004 Don Rundell City of Round Rock, Texas 212 Commerce Cove Round Rock, TX 78664 Re: East Water Transmission Line - Phase II SWPPP Inspection Reports Signature Authorization Mr. Rundell: Please find the attached form associated with the Storm Water Pollution Prevention Plan (SWPPP) for the East Line Phase II. I spoke with Compliance Resources, the sub to McLean Construction for the SWPPP, to get clarification on the process of signing and filing the required biweekly and post -rainfall inspection reports. The reports are issued biweekly and after every rainfall of %2" or more. The attached form delegates authorization to sign the inspection reports. Signatory authorization may be delegated to anyone within the City of Round Rock organization. Please designate a signator (ex: Jeff Bell) in the blank provided and have the City Manager or other "principle executive officer" sign the authorization letter. We will be happy to file the letter with TCEQ. Once the signature authorization letter has been filed with TCEQ, Jeff Bell, or whomever is designated as signator, maysign the inspection reports. The signed inspection reports should be filed in the City's copy of the SWPPP, which we will forward to you as soon as the signature authorization letter has been submitted to TCEQ. Please feel free to give me or Troy a call if you need more information or clarification. Sincerely, HDR Engineering Brandon M. Neal HDR Engineering, Inc. 2211 South IH -35 Suite 300 Austin.1( 78741-3842 Phone: (512) 912-5100 Fax: (512) 912-5158 www.hdrinc.com 1 haZ ONE COMPANY Many Solutions" Transmittal Attention: Don Rundell Date: June 4, 2004 Job No: 07225-065 To: City of Round Rock 212 Commerce Cove Round Rock, TX 78664 Phone: (512) 218-5554 Regarding: East Water Transmission Line - Phase II SWPPP Inspection Reports Signature Authorization We are sending you: ® Attached ri Under separate cover via the following items ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications n Copy of letter ❑ Change Order n Other Copies Date No. 1 06/04/2004 1 page Description Letter 1 03/09/3004 1 page Signatory authorization delegation letter These are transmitted as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval H For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Retum corrected prints ❑ For review/comment n Other ❑ For bids due ❑ Prints retumed after loan to us Remarks Copy to Troy St. Tours - HDR Engineering Signed Bra Rich Shoemaker, P.E. - HDR Engineering If enclosures are not as noted, please notify us at once HDR Engineering, Inc. W:1072250651Correspondence\City\Don.Rundell.007.Transmittal.doc 2211 South IH -35 Suite 300 Austin, TX 78741-3842 Phone (512) 912-5100 Fax (512) 912-5158 www.hdrinc.com Page 1 of 1