CM-08-02-034DATE: January 28, 2008 SUBJECT: City Manager - February 1, 2008 ITEM: Action authorizing the City Manager to execute Change Order No. 7 with RGM Constructors, L.P. for the Kiphen Road (Old Settler's Blvd.), Phase II Project from the MKT right-of-way to Red Bud Lane (CR 122). Department: Transportation Services Staff Person: Thomas G. Martin, P.E., Director of Transportation Services Justification: This change order is to provide the construction of segmental block walls at Chamberlain Drive in order to allow for the installation of the sidewalk in accordance with the Americans with Disabilities Act, for pedestrian traffic. Funding: Cost: $ 21,924.28 Source of funds: 4B -Round Rock Transportation System Development Corporation Outside Resources: RGM Constructors Background Information: The Kiphen Road (Old Settler's Blvd.), Phase II project was awarded to RGM Constructors, L.P. by Council on November 22, 2005. The project, in accordance with the City's Transportation Master Plan, reconstructs a two-lane roadway to a four -lane divided Arterial. Public Comment: N/A Blue Sheet Format Updated 01/20/04 Amount % Change Original Contract $7,410,510.31 N/A Previous Change Orders S488,931.81 6.60% Change Order #7 $21,924.28 0.29% Revised Contract $ 7,921,366.40 6.89% Outside Resources: RGM Constructors Background Information: The Kiphen Road (Old Settler's Blvd.), Phase II project was awarded to RGM Constructors, L.P. by Council on November 22, 2005. The project, in accordance with the City's Transportation Master Plan, reconstructs a two-lane roadway to a four -lane divided Arterial. Public Comment: N/A Blue Sheet Format Updated 01/20/04 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Transportation Services PROJECT: Kiphen Road Phase 11 ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $7,410,510.31 $488,931.81 $21,924.28 $510,856.09 CHANGE DATA Page 1 of 2 DATE: 1/16/2008 CHANGE ORDER NO: 7 JUSTIFICATION: Reference page 2 of 2 ITEM # DESCRIPTION OF CHANGES UNIT QTY UNIT PRICE AMOUNT ADDED WORKING DAYS 1 P.C.CONCRETE DRIVEWAY, 6" THICKNESS SF 1909 $5.10 $9,735.90 15 2 RAISE FIRE HYDRANT SF 1 $2,538.38 $2,538.38 3 RIP RAP FOR SLOPE PROTECTION (CL A) CY 4.5 $500.00 $2,250.00 4 PIPE 24" (ALL DEPTHS) INCL EXCAVATION LF 148 $50.00 $7,400.00 AND BACKFILL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 rim= Aiirâ–º r j. TOTAL: $21,924.28 i SIG RE (ENGIN ., SIGITkAONCTOR) PRINTED NAME: Martin Morello DATE 1/11 17-ce 1/16/2008 DATE TITLE: Project Manager, RGM Constructors L.P. APPROVED: CITY OF ROUND C M -DB- ba -off `f DATE PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: $21,92418 PREVIOUS CHANGE ORDER: $488,931.81 TOTAL % CHANGE TO DATE: 6.89% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $7,921,366.40 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER Page 2 of 2 DEPARTMENT: Transportation Services DATE: 1/16/2008 PROJECT: Kiphen Road Phase 11 CHANGE ORDER NO: 7 JUSTIFICATION: 1 Added additional P.C. Concrete Driveways at Stations 121+50, 115+50, 67+00, 64+00 and 76+00 in accordance with the City of Round Rock Direction. 2 Increase in quantities for additional rip rap for slope protection (CL A), pipe 24 -inch (all depths) and raise fire hydrants