Loading...
CM-08-02-046DATE: February 11, 2008 SUBJECT: City Manager -February 15, 2008 ITEM: Action authorizing City Manager to approve Change Order No. 10 with FT Woods Construction for the Round Rock Police Facility. Department: Engineering and Development Services Staff Person: Tom Word, Chief of P.W. Operations Larry Madsen, Construction Manager Justification: The items listed in Change Order No. 10 are required to complete the Facility. The items were omitted or not incorporated in the original plans. Items include; additional door hardware, air conditioning for audio visual cabinets, and heat weld for flooring seams that were originally on contract, but were removed at value engineering. This Change Order also includes power for Sonitrol Security Panels not on the original plans, and static free floor covering in the computer forensic lab. Funding: Cost: $16,899.81 Source of funds: 2002 GO Bonds & General Self Finance Construction Outside Resources: Brinkley Sargent Architects FT Woods Construction Backaround Information: On February 22,2007 the City Council approved resolution number R -07-02-22-8C2 to enter into a Standard Form of Agreement with FT Woods Construction for construction of the new Police Facility at 3001 Tellabs Dr. Public Comment: N/A Blue Sheet Format Updated 01/20/04 Amount % Change Original Contract $ 10,884,000.00 N/A Previous Change Orders $ 483,491.48 4.44% Change Order No. 10 $ 16,899.81 .16% Revised Contract $ 11,384,391.29 4.6% Outside Resources: Brinkley Sargent Architects FT Woods Construction Backaround Information: On February 22,2007 the City Council approved resolution number R -07-02-22-8C2 to enter into a Standard Form of Agreement with FT Woods Construction for construction of the new Police Facility at 3001 Tellabs Dr. Public Comment: N/A Blue Sheet Format Updated 01/20/04 ROUND ROCK POLICE FACILITY CONSTRUCTION CHANGE ORDER Project: Round Rock Police Facility Address: 3001 Tellabs Drive Change Order No.: 10 Initiation Date: 1/31/2008 Round Rock, Texas Contract For: General Construction To: FT Woods Construction 1966 South Austin Avenue Georgetown, Texas 78626 (Contractor) The Contract is changed as follows: Contract Date: 2/22/2007 #129 Door hardware for door # 420 Add $ 2,849.00 #135 HVAC Ductwork audio visual cabinets Room # 217 & 391 Add $ 2,202.34 # 141 Frosted glass for doors # 143 #179 Add $ 357.30 #142 Heat weld seams all linoleum floors Add $ 6,276.66 #147 Add power to 3 security panels Add $ 991.83 #148 Add static dissapative floor tile and grounding room # 364 Add $ 4,222.68 Total $ 16,899.81 This Change Order is not in effect and will not be included in the Contract Documents until signed by the Owner, Architect and Contractor. Changes included herein are subject to all conditions affecting them under the substitution specification section. Summary The original Contract Sum was' $ 10,884,000.00 Net change by previous authorized Change Orders. $ 483,491.48 The Contract Sum prior to this Change Order was. $ 11,367,491.48 The Contract Sum will be increased by this Change Order $ 16,899.81 The new Contract Sum including this Change Order will be. $ 11,384,391.29 The Contract time will be changed by (2) days: The Date of Substantial Completion as of the date of this Change Order therefore is: 3/12/08 Brinkley Sargent Architect 5000 Qu ri's�_I i i. ite 600 Addr9�¢° FT Woods Construction Contractor 1966 South Austin Avenue Address Georgetown, Texas 78626 Date CM- Oyu Date 2-1 t2- 1o13 City of Round Rock Owner 221 East Main Street Address Round Rock, Texas 78664 James R. Nuse, P.E Date 'ODDS Construction To: Gary Beeman Brinkley Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: Add hardware for Door 420X P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Change Request Number: 129 Date: 12/10/07 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the following changes: Addition of an exit device, power transfer, power supply, ring and core to existing Door 420X. This hardware was taken from Door 111A to make 420X work properly, and this is reordering the hardware for 111A. The total amount to provide this work is (Please refer to attached sheet for details.) The schedule is not affected by this change. If you have any questions, please contact me at _ $2,84900 Submitted by: SC Inman FTWOODS Cc: Approved by: Date: Page 1 of 2 FTWOODS Construction To: Gary Beeman Brinkley Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: Add hardware for Door 420X P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Change Request Number. 129 Date: 12/10/07 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the following changes: Addition of an exit device, power transfer, power supply, ring and core to existing Door 420X. This hardware was taken from Door 111A to make 420X work properly, and this is reordering the hardware for 111A. The total amount to provide this work is 52,849.00 (Please refer to attached sheet for details) The schedule is not affected by this change. If you have any questions, please contact me at . Submitted by: SC Inman FTWOODS Cc: Approved by- Date - Page 1 of 2 PIPER WEATHERFORD COMPANY DISTRIBUTOR OF ARCHITECTURAL SPECIALTIES 165 Tecon Cove Buda, TX. 78610 PHONE: (512) 420-0726 FAX: (512) 420-9367 QUOTATION DATE: 12/04/2007 ATTENTION: Mr. Jason Young Fax: 512 930 3469 CUSTOMER: FT Woods Construction, Inc. PWCO PROJECT # 07A1114 JOB NAME: Round Rock Police Station Finish Hardware — Opening 111A Replacement Finish Hardware The following are the cost adds per your e-mail dated 12/04107 10:40AM Add One (1) New Door Hardware: Add,.,.. $2,312.00 Add 1 ea. Add 1 ea Add 1 ea. Add 1 ea. Add 1 ea. EL35L X 360L 17 3' X 299 26D Exit Device EPT10 SP28 Power Transfer PS873-2 Power Supply 2197 X 1161 X 7116" Ring 1220 26D permanent core Qualifications: 1. This proposal does not include a card reader. Jason, please confirm t am to proceed with the above changes. Thank you, X04 ,./tittlick Bob Phillips Piper Weatherford Company / z9 MOODS Construction To: Gary Beeman Brinkley Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: Addition of HVAC at AV cabinets P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Change Request Number 135 Date: 1/8/08 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the following changes: Per response to RFI #77, add HVAC ductwork to audiovisual cabinets in Rooms #217 and #391. The total amount to provide this work is $2,20234 (Please refer to attached sheet for details.) The schedule is not affected by this change. If you have any questions, please contact me at . Submitted by: SC Inman FIWOODS Cc: Approved by: Date. Page 1 of 2 13r MOODS Construction Change Request 135 Price Breakdown Continuation Sheet Description: Addition of HVAC at AV cabinets P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Description HVAC Labor Material Equipment Subcontract Other Price $1,760.00 $1,760.00 Project Management Field Management Insurance Bond Overhead Profit Subtotal: $1,760.00 $60.00 $60.00 $1,880.00 0.61% $11.47 $1,89147 0.81% $15.32 $1,906.79 10.00% $190.68 $2,097.47 5.00% $104.87 Total: $2,202.34 Page 2 of 2 /37 AIR Akto Moduadcalltea. Proposed Change Order To: FT Woods Construction POBox 122 Georgrtown, Texas 78627 Attention: SC Inman Phone: (512) 930-2607 Fax: (512) 930-3469 GC.ReLNo.: • Arc Re£ No.: AIRCO Mechanical, PO Banc 9388 (7 9200 Wald Austin, Texas 7 Phone: (512) 83729 Faoc (612)837-3112 TAa A5358C - M16472 Date: December 27, 2007 AIRCO P.C. Na: 12 P.C. Description: RFI #12 Project No.: 207403 Project. Round Rock Police Facility 3001 Tellabs Drive Round Rock, Texas 78627 We propose to furnish all the labor and material required to install the I VAC and/or Plumbing changes on the above project in accordance with the following description: RFI #77 dated 12/6/07 Mechanical work as required to furnish and install ductwork and duct insulation in the AudioArisual Cabinets in Rooms #217 and #391. Drawings Afected Dated Total cost of proposed change to contract Change to completion date of contract from date of release ADD $ 1,760.00 Our pricing reflects changes only as indicated by above description. All exclusions and qualifications of the original contract reamain the same. This price is sect to change if not released within thirty (30) days or if trades proceed with further r 'const nmction that may hendor our normal installation. Please, notify us in writing if we are to proceed with the proposed change. Sincerely, Airco Mechanical, Ltd. Regulated by flicTuanDepartmatericensitgandltegulaSon POE= 12157 Anstia,Tena 78711 (SO1:1)80B-92S2ar(922)463-699 3s MOODS Y t1 ODDS Construction To: Gary Beeman Brinkley Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: Frosted glass P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Change Request Number 141 Date: 1/15/08 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the following changes: Change Door #143A and 179A to frosted glass per BSA. The total amount to provide this work is . $357.30 (Please refer to attached sheet for details.) The schedule is not affected by this change. If you have any questions, please contact me at . Submitted by: SC Inman FTWOODS Cc: Approved by Date - Page 1 of 2 FIWOODS Construction Change Request 141 Price Breakdown Continuation Sheet Description: Frosted glass P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Description Labor Material Equipment Subcontract Entrance & Storefront $185.00 Other Price $185.00 Project Management Field Management Insurance Bond Overhead Profit Subtotal: $185.00 $60.00 $60.00 $305.00 0.61% $1.86 $306.86 0.81% $2.49 $309.35 10.00% $30.94 $340.29 5.00% $17.01 Total: $357.30 Page 2 of 2 h41 ChM MOODS Construction To: Gary Beeman Brinidey Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: Heat weld seams P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Change Request Number. 142 Date: 1/16/08 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the following changes: Heat weld alt seams at all linoleum flooring. The total amount to provide this work is $6,276.66 (Please refer to attached sheet for details.) Please note that FTWOODS Construction Services Inc will require an extra 2 days. If you have any questions, please contact me at Submitted by: SC Inman FTWOODS Cc: Approved by- Date - Page 1 of 2 FIWOODS Construction Change Request 142 Price Breakdown Continuation Sheet Description: Heat weld seams P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Description Carpet Labor Material Equipment Subcontract $5,238.00 Other Price $5,238.00 Project Management Field Management Insurance Bond Overhead Profit Subtotal: $5,238.00 $60.00 $60.00 $5,358.00 0.61% $32.68 $5,390.68 0.81% $43.66 $5,434.34 10.00% $543.43 $5,977.77 5.00% $298.89 Total: $6,276.66 Page 2 of 2 MOODS Construction Change Request 142 Price Breakdown Continuation Sheet Description: Heat weld seams P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Description Carpet Labor Material Equipment Subcontract $5,238.00 Other Price $5,238.00 Project Management Feld Management Insurance Bond Overhead Profit Subtotal: $5,238.00 $60.00 $60.00 $5,358.00 0.61% $32.68 $5,390.68 0.81% $43.66 $5,434.34 10.00% $543.43 $5,977.77 5.00% $298.89 Total: $6,276.66 Page 2 of 2 MOODS Construction To: Gary Beeman Brinkley Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: Add power to Security Panels P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Change Request Number: 147 Date: 1/23/08 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the following changes: Add power to three security panels not on plans. The total amount to provide this work is $991.83 (Please refer to attached sheet for details.) The schedule is not affected by this change. If you have any questions, please contact me at . Submitted by: SC Inman FTWOODS Cc: Approved by: Date' Page 1-° of 2 4t- Y7 FOODS Construction Change Request 147 Price Breakdown Continuation Sheet Description: Add power to Security Panels P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Description Electrical Labor Material Equipment Subcontract $726.67 Other Price $726.67 Project Management Field Management Insurance Bond Overhead Profit Subtotal: $726.67 $60.00 $60.00 $846.67 0.61% $5.16 $851.83 0.81% $6.90 $858.73 10.04% $85.87 $944.60 5.00% $47.23 Total: 5991.83 Page 2 of 2 *IV g MOE iiiimmrsorcmts MANGE ORDER REQUEST CHANGE ORDER ROUND ROCK POLICE FACILITY C.O. #Y'5 7 3280 FM 112 TAYLOR. TX 76574 OFFICE (512) 365-8393 FAX (592) 3653989 TDLR LICENSE #19676 DATE: JAN22 2008 NAME: SC INMANN COMPANY: FT WOODS CONST. PROVIDE POWER TO SECURITY PANELS NOT SHOWN ON PLANS MATERIAL TAX MATERIAL TOTAL LABOR $155.71 $0.00 $155.71 4.78 INSTALLER HOURS AT $50.00 / HOUR $239.00 1.00 JOURNEYMAN HOURS AT $70.00 / HOUR $70.00 1.00 PROJECT MGR. HOURS AT $65.00 /HOUR. $65.00 SUBTOTAL LABOR $374.00 PAYROLL TAXES ® 35% $130.90 LABOR TOTAL $504.90 MISCELLANEOUS EXPENSES EQUIPMENT PERMITS $0.00 $0.00 FREIGHT $0.00 MISCELLANEOUS TOTAL $0.00 Regulated by the Texas Department of Licensing & Regulation. P.O. Box 12157, 'Austin, TX 78711,1-800-803-3902, 512-463-6599 Website: www license.state.tic.us/complaints MATERIAL MISCELLANEOUS LABOR SUBTOTAL OVERHEAD & $155.71 $0.00 $504.90 $660.61 PROFIT (I0%) $66.06 TOTAL $72C67 ROUND ROCK POLICE FACILITY C.Q. #37P2 ADD PWR FOR SECURITY CABINETS POLES 1-60AMP RECP DUPLEX 5-20R 1/2 EMIT SS CONN DC 1/2 EMT CONDUIT 1/2 EMT SS COUP DC 1/2 1-H EMT STRAP BOX 4S 1/2-3/4 CVR 4S 1-DUP 12 THHN TEK SCREW 10X3/4 RAW TOTALS TOTAL UNIT QUANTITY UNIT COST COST 3 38.00 114.00 3 3.50 10.50 6 0.20 30 0.27 3 0.29 6 0.08 3 0.87 3 1.21 100 0,14 8 0.04 1.20 8.10 0.87 0.48 2.61 3.63 14.00 0.32 155.71 UNIT TOTAL UNIT LABOR LABOR 0.15 0.45 0.25 0.75 0.06 0.36 0.04 1.20 0.07 0.21 0.03 0.18 0,25. 0.75 0.10 0.30 0.005 0.50 0.01 0.08 4.78 F1WOODS Construction Change Request To: Gary Beeman Brinkley Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: Add SDT to White Collar Crime Lab P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Number 148 Date: 1/24/08 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the following changes: Add static dissapative floor tile to Room 364, induding grounding. The total amount to provide this work is $4,222.68 (Please refer to attached sheet for details.) The schedule is not affected by this change. If you have any questions, please contact me at . Submitted by: SC Inman FTWOODS Cc: Approved by. Date - Page 1 of 2 �c� FIWOODS Construction Change Request 148 Price Breakdown Continuation Sheet Description: Add SDT to White Collar Crime Lab P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Description Carpet Electrical Labor Material Equipment Subcontract $2,738.00 $746.63 Other Price $2,738.00 $746.63 Project Management Field Management Insurance Bond Overhead Profit Subtotal: $3,484.63 $60.00 $60.00 $3,604.63 0.61% $21.99 $3,626.62 0.81% $29.38 $3,656.00 10.00% $365.60 $4,021.60 5.00% $201.08 Total: $4,222.68 Page 2 of 2 *-igs 01/24/2008 14:54 5123854577 INTER CH January 24, 2008 To: FT Woods Attn: S C Inman Fax: 512 930-3469 PAGE 01 Project: Round Rock Police Department— Change room 364 to STD tile Furnish & install: Armstrong Static Dissapative Tile wlgrounding strips and STD adhesive nPertech FLooRING 450 sf $2,738.00 Sub Total Tax Total Sale $2,738.00 0.00 Authorized Signature: 07-ffs04.. Tont Brennan $2,738.00 • This bid does not include sales tax. • This bid does not include floortech P� on, waxing buffing of f>n3shed floors? post AUSTIN installation vacuuming, inaior floor prep and after hours or ovestirne labor. ? Rd. • This proposal includes patch g o f mor holes and cracks, but does not inc the 700 floating and leveling oftougb and tmeven concrete slabs. ►r Texas • Intertech Flooring only uses environmentally safe adhesives. 787 • Please be aware that in order for Intertech Flooring to properly install flooring, e3pecIgllyP.Q. Box 17217 VCT, heat must be tamed on at least 48 hours prior to installation_ AusCin, Texas • Workers Compensationand Liability Insurance cover all Intertech Flooring installers. 7$791277 • A signed proposal, purchase order, Or contract must be returned ordered. prior to material being P 0/ 2) 3854574 F (572) 3854577 ACCEPTANCE OF PROPOSAL: All prices, specifications and conditions are hereby accepted. SAN A O fou are authorized to do the work as specified. ed. 4770 r creek Sub 380 Stri Antonio, Signature: _ Texas Dat e: 78217 P (210)650-8010 F1210)560-6274 W.E. Innof & Compeny, S. ltif8 eimzeiriclas CHANGE ORDER REQUEST 2.1 1, 0 Ce:th 1448 OF CHANGE ORDER ROUND ROCK POLICE FACILITY C.O. #36 DATE: JAN22 2008 NAME: SC INMANN COMPANY: FT WOODS CONST. PROVIDE FLOOR GROUND IN WHETE COLLAR CRIME LAB MATERIAL TAX MATERIAL TOTAL LABOR 3280 FM 112 OR, D( 76574 (512) 365-8393 FAX (512) 365-3989 "MLR LICENSE #19676 suo.00 Q2 $240.00 3.80 INSTALL EIt HOURS AT $50.00 / HOUR $190.00 1.00 JOURNEYMAN HOURS AT $70.00 / HOUR $70.0Q LOO PROJECT M6R. HOURS AT $65.00 /HOUR $65.0Q SUBTOTAL LABOR $325.00 PAYROLL TAXES ® 35% 111221 LABOR TOTAL $438.75 MISCELLANEOUS EXPENSES EQUIPMENT PERMITS $0.00 $0.00 FREIGHT MISCELLANEOUS TOTAL Vim Regulated by the Texas Department of Licensing & Regulation. P.O. Box 12157, Austin, TX 78711, 1-800-803-3902, 512-463-6599 Website: www.license.state.bc.us/cornolaints MATERIAL MISCELLANEOUS LABOR SUBTOTAL OVERHEAD& $240.00 $0.00 p_310_ $678.75 PROFIT (10%) Wm, TOTAL law RRPD C `" S T F -t' � s- 4A JdbtA.(c. TOTAL UNIT UNIT TOTAL UNIT QUANTITY UNIT COST COST LABOR LABOR GROUND BAR 1 124.00 124.00 1.00 1.00 #6 CRIMP 4 3.00 12.00 0.15 0.60 #6 EYE CRIMP 4 3.00 12.00 0.15 0.60 6 THHN 200 0.46 92.00 0.008 1.60 RAW TOTALS 240.00 3.80 tffie